Objective AOM 19. ESSIP Plan 2013. Octavian CIOARA DSS/EIPR 13.09.2013. Objective AOM19. Comprehensive Explanation What is new or has changed since LSSIP 2012 Link to European ATM Master Plan Finalisation Criteria and Closed Questions ESSIP Report 2012
E N D
Objective AOM 19 ESSIP Plan 2013 Octavian CIOARA DSS/EIPR 13.09.2013
Objective AOM19 • Comprehensive Explanation • What is new or has changed since LSSIP 2012 • Link to European ATM Master Plan • Finalisation Criteria and Closed Questions • ESSIP Report 2012 • Objective Coordinator’s Analysis, recommendations, tips & tricks • Links and contacts ESSIP Plan 2013 / Objective AOM 19
Comprehensive Explanation • Area of applicability: AllECAC States • Initial Operational Capability (IOC): 01/2011Full Operational Capability (FOC): 12/2016 • Establish a collaborative civil-military airspace planning at the European Network level by: • Integrating ASM and ATFCM processes into the day of operations, • Maximising use of capacity available and improved updates of the airspace status, • Consistent application of FUA Concept across Europe, • Developing and implementing of ASM/ATFCM processes and supporting tools at national, sub-regional and European levels. • Objective related to the new AOP21 Note: This objective contributes also to the implementation of the FUA Regulatory Requirements (Regulation 2150/2005). ESSIP Plan 2013 / Objective AOM 19
What is new or has changed since LSSIP 2012 • New FOC date: 12/2016 (instead of 12/2015) • No changes to existing SLoAs • 2 new SLoAs (applicable to the Network Manager) • AOM19-NM01 - Develop System and procedures for an improved ASM/ATFCM process – finalisation date 12/2015 • AOM19-NM02 - Upgrade NM systems to allow exchange in real-time of ASM information – finalisation date 12/2016 ESSIP Plan 2013 / Objective AOM 19
Link to European ATM Master Plan • The objective AOM19 covers the following SESAR OI steps: • OI step - [AOM-0201] - Moving Airspace Management Into Day of Operation • OI step - [AOM-0202] - Enhanced Real-time Civil-Military Coordination of Airspace Utilisation • OI step - [AOM-0205] - Modular Temporary Airspace Structures and Reserved Areas • OI step - [AOM-0401] - Multiple Route Options & Airspace Organisation Scenarios • OI step - [DCB-0203] - Enhanced ASM/ATFCM Coordinated Process ESSIP Plan 2013 / Objective AOM 19
Most important SLoA(s) • AOM19-ASP02 - Implement CIAM Phase 1 should have beenalready completed (finalisation date 12/2010). • AOM19-ASP03 – Implement CIAM Phase 2 should have beenalready completed (finalisation date 12/2011). • Each SLoA should be fulfilled in accordance with the relevant provisions of the CFMU Handbook, the ERNIP Part 3 - Handbook for Airspace Management, the EUROCONTROL Specification for the application of the FUA ESSIP Plan 2013 / Objective AOM 19
Finalisation Criteria and Closed Questions • Finalisation criteria: • Contact your subject matter expert to determine the deployment Status for each SloA • Statements to be made based on Finalisation criteria • Closed questions: • Not yet developed ESSIP Plan 2013 / Objective AOM 19
ESSIP Report 2012 • More than three quarters of the States have plans to implement this objective according to the agreed timeframe. • The implementation progresses well in the States with high traffic demand/complexity and/or high level of military airspace users activity. • Interest in implementation of this objective is slightly lower in the states with low traffic demand/complexity and/or low level of military airspace users activity, notably with regard the implementation by the military stakeholders. • Stakeholders reporting “NO PLAN” or “NOT APPLICABLE” should duly justify this status. ESSIP Plan 2013 / Objective AOM 19
Objective Coordinator’s Analysis, recommendations, tips & tricks • Ensure that your subject matter expert is involved once you make your statement. • Information provided per SLoA can be easily verified by checking the provisions laid down in the supporting material. • Next SLoA with finish date due is: • AOM19-ASP07 – Optimise CDRs design and availability by 12/2013 ESSIP Plan 2013 / Objective AOM 19
Links and contacts Objective Coordinator: Octavian CIOARA +32 2 729 3282 octavian.cioara@eurocontrol.int NMD Objective Expert(s): Giuseppe ACAMPORA+ 32 2 729 93541 giuseppe.acampora@eurocontrol.int Olivier MROWICKI + 32 2 729 93107 olivier.mrowicki@eurocontrol.int ESSIP Plan 2013 / Objective AOM 19