1 / 34

WARM WELCOME

WARM WELCOME. TO. Air Cmde N.K. Tandon. VM. AOC & Chairman VMC. ALSO HEARTY WELCOME TO. Chairman Nominee and Other Members of VMC. POINTS ON THE AGENDA. Receipt & Expenditure details of Vidyalaya Vikas Nidhi from 01-4-09 to 19-02-10 for ratification.

thyra
Download Presentation

WARM WELCOME

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WARM WELCOME TO Air Cmde N.K. Tandon VM AOC & Chairman VMC

  2. ALSO HEARTY WELCOME TO Chairman Nominee and Other Members of VMC

  3. POINTS ON THE AGENDA • Receipt & Expenditure details of Vidyalaya Vikas Nidhi from 01-4-09 to 19-02-10 for ratification. • Receipt and Expenditure details of School Fund from 01-4-09 to 31-01-10 for ratification. • Details of other M & R works carried out in the Vidyalaya out of approved budget of VVN for 2009-10. • Details of Petty construction work as per approved VVN Budget for 2009-10 • Academic Matters • Introduction of Continuous and Comprehensive Evaluation for class IX • Reducing the load of the school bag etc • Measures taken for improving the quality and quantity of the result. • Details of Construction works entrusted to GE(I) AFS Pathankot with Date of deposit of fund, name of work, completion report, latest position etc. Future construction works by GE (I) AFS Pathankot and issuance of Safety Certificate etc. • Admission policy as per Admission Guide Lines for 2010-11. • Any other point with the permission of Chairman VMC/VEC

  4. TOTAL RECEIPT OF VVN FROM 01-04-09 TO 19-02-10

  5. DETAILS OF ACTUAL EXPENDITURES FROM 01-4-09 TO 19-02-10 OF VIDYALAYA VIKAS NIDHI

  6. TOTAL RECEIPT OF SCHOOL FUND FROM 01-04-09 TO 19-02-10

  7. DETAILS OF ACTUAL EXPENDITURES (SCHOOL FUND) FROM 01-4-09 TO 31-01-10

  8. Details of M & R Works undertaken in KV Building during 2009-10

  9. Other Miscellaneous Works

  10. Details of Petty Construction Works Material • Cement 85 bags • Bricks 12500 • Sand 700 cft • Bajri 450 cft • Angel Iron and Saria 1400 kg • Iron Net Zaali 42.200 gm • CGI Sheets 43 pieces • Bricks rori 200 • Welding rods 10 packet • Iron Door 01 Summary 1. Civil Rs. 178069 2. Labour Rs. 50867 Total Rs. 228936

  11. Details of Petty Construction Works Construction of Bathroom-cum-Toilets for Physically Disabled with ramp facility Total Cost Rs. 54860 Material • Cement 20 Bags • Saria 140 Kg • Bricks 3000 • Sand-Bajri 425 cft • Tiles 400 pcs. Summary 1. Material Rs. 46236 2. Labour Rs. 8624 Total Rs. 54860

  12. DETAILS OF AMOUNT DEPOSITED WITH GE (I) AFS PATHANKOT AND PRESENT STATUS

  13. Academic Matters • Introduction of Continuous and Comprehensive Evaluation for class IX • Reducing the load of the school bag etc • Measures taken for improving the quality and quantity of the result.

  14. Introduction of CCE for class IX as per Direction from KVS and CBSE

  15. Reducing the load of the school bag etc

  16. Target : 100% Result with Quality • Comprehensive Plan of Action and Monitoring • Team Effort • Special Classes during Break • Special Time Table and Classroom Strategy • Revision Strategy • Parents - Teachers Meet

  17. Important Activities • Successful Conduct of Inservice Course in 2 Spells for PRTs of KVS Jammu Region attended by 60 teachers • 3 Day Training Program for PGTs of KVS Jammu Region • Organised Successfully 1. Regional Level Social Science in which 15 KVs participated 2. Regional Sports meet in Kho-Kho and TT (Boys) 3. Coaching Camp for National Sports meet. 4. Adolescence Education Program . Celebrated 1. Annual Sports Day 2. Annual Prize Distribution Function 3. Bal Mela 4. Grand Parent Day

  18. Works Yet to be Taken Up • Development of Maths Lab out of VVN • Developing a Children Park as per KVS guidelines • Proposal for Multipurpose Hall (S F) • Safety Certificate of the Building • Enclosing of Main School Building and Reducing the no of entrance points.

  19. VOTE OF THANKS

  20. Achievements of our Students

  21. Achievements of our Students in Sports • Games are organized through house system. Athletics events are organized in seven division as per age group from class I to XII. • (2) 40th Regional Sports Meet of Boys for Kho-Kho and Table Tennis was organized in this Vidyalaya from 04-11-09 to 06-11-09. • (3) Coaching Camp in Kho-Kho and Table Tennis organized w.e.f 07-11-09 to 13-11-09. • 100% participation at school level. • 116 Students participated in Regional level competition and 08 students participated at the 40th KVS National Sports Meet.

  22. Proposals sent to KVS for new Constructions (SF) • Proposal for new constructions • Three classrooms • One activity room • One Geography cum Social Science room • One Art room • One SUPW room • One Scout & Guide room • One Medical room • Multipurpose Assembly Ground • Badminton Courts

  23. Works proposed to be under taken during 2009-10 • Necessary repairs / replacement of system (flush tanks) in the • Boys & Girls Toilets • Construction of Toilet for Physical Handicapped in view of KVS • instructions. • White washing and painting wherever required • Day to day repairs of building & fixture. • T.T Hall cum Sports Room • Maths Lab • Any other work deemed essential for beautification and security • purpose.

  24. Financial Matters

  25. The Expected Receipts of VVN & School Fund during 2009-10 Annexure -I enclosed

  26. Details of the Approved VVN Budget for 2009-10 Ratification of Actual Expenditure incurred out of VVN during 2008-09 and The Proposed Approved Budget for 2009-10 Annexure -II enclosed

  27. Actual Expenditure Incurred Out of School Fund During 2009-10 Annexure -III enclosed

  28. Powers for procurement of goods vide Article 169.3 of Accounts Code for KVS Annexure -IV enclosed

  29. Confirmation of Minutesof Previous Meetings

  30. Any other Point and Suggestions To be raised & recorded.

More Related