An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Public Open House February 6, 2014

  2. Study Overview - Study Area South North

  3. Key Input Groups General Public Stakeholder Working Group (SWG) • Corridor Residents • Business Owners • Interested Stakeholders Technical Advisory Committee (TAC) • Regional Transportation Commission (RTC) • City of Reno • Nevada Department of Transportation (NDOT) • Consultant Technical Staff

  4. Study Process We Are Here

  5. Study Goals • Improve pedestrian, ADA, and bicycle safety and connectivity to businesses, residents, and existing facilities • Ensure vehicular progression and Level of Service to balance improvements for all modes • Foster meaningful community participation for the entire corridor Riverside Dr. California Ave.

  6. Study Goals • Coordinate improvements with development, residential and business needs • Identify logical, buildable phases to maintain progress over time • Highlight aesthetics and improve the user’s experience throughout the corridor Reno High School Keystone at I-80

  7. Example Deficiencies andPotential Solutions • Issue: • 2. Poor pedestrian routing and circulation • Opportunities: • Add signing to avoid south sidewalk dead end • Consider ramping at Foster overpass versus existing stairs • Include full pedestrian facilities with any new intersection design

  8. Example Deficiencies andPotential Solutions • Issue: • 25. Crash rate is higher (3.05) than statewide averages (2.41) • Opportunities: • Propose safety improvements such as refined signal timing, signal coordination, and eliminating permitted left turn movements • Review and implement NDOT Roadside Safety Audit recommendations

  9. Example Deficiencies andPotential Solutions • Issue: • 36. Difficulty backing in/out of residential driveways that front Keystone • Opportunities: • Incorporate buffer space in proposed Keystone roadway section if possible

  10. Keystone Avenue BridgeOver the Truckee River • Originally built in 1966 • The bridge is in poor shape • Sufficiency rating 28 / 100 • “Structurally deficient” • Does not provide pedestrian or bicycle facilities • The California / Keystone intersection and the Truckee River Flood Project are key considerations

  11. Next Steps • Complete Existing Conditions Analysis • Finalize Corridor Goals • Develop and Evaluate Alternatives • Bring Alternatives Forward for Input Keystone and Kings Row

  12. How to Submit a Comment • Submit a comment sheet at the greeting table • Complete a Comment Sheet and mail it to: Patrice Echola RTC Project Manager 1105 Terminal Way, Suite 211 Reno, Nevada 89502 • Submit a question card for the Q&A session • Email your comments to: pechola@rtcwashoe.com reference “Keystone Corridor Study” in the subject line Over 150 comments have been submitted!

  13. Thank You! Primary Contact: Patrice Echola pechola@rtcwashoe.com 775-335-1904 Thank you for your participation!