An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Control System Status (04-11-10)

  2. Control System Status (04-11-10) - Footnotes • MCA and SESO XBPM will initially use vendor supplied software. • Work on the MAR detector interface software is now limited by physical installation of the detector. • Low level motor control work is now limited on the delivery of the end-station • Deployment of control hardware and software is currently consistent with physical installation of the beamline equipment.

  3. System Architecture MS-SQL Server MS-Win OPI Linux OPI Linux OPI Linux Touch Panel OPI Linux Network Server (bootp, dhcp, auto restore) Linux Data Archive Server Linux Alarm Server MS-Win VLANs for: each beamline, machine control, development, office, visitors PowerEdge IOC Linux VME Crate (Reflective Memory) EROC IOC RTEMS IOC Step Controller RTEMS EROC IOC RTEMS Detector IOC Linux 1Gig Bridge MicroStep Field Dev. RS-232 Devices MicroStep Ethernet Devices PLC & GPIB Motors Field Dev. Motors Field Dev.

  4. Design Features • Accelerator and Beamline Systems based on EPICS and RTEMS. • Independent VLAN for each bend magnet beamline or ID-pair. • Central common servers provide network services, data achieving and storage. • Gateways provide read-access all machine parameters and control over insertion devices. • Interfaces to central alarm management, work management and inventory control systems are being developed.

  5. Example Beamline Front-End Control Screen

  6. Example Beamline Control Screen

  7. Hutch Control Screen

  8. Data Collection Control Screen

  9. Data Scan Screen

  10. User Control Screen