1 / 3

Performance indicator review –Common Goals

Performance indicator review –Common Goals. An ISO Certified Autonomous OCP center in IEC equipments, Enclosure, Communication modules, Wiring Devices , Network Connectivity, Cable management, PC based Software, Mobility Apps & FD products. Through. Efficient OCP Delivery Center.

tom
Download Presentation

Performance indicator review –Common Goals

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Performance indicator review –Common Goals An ISO Certified Autonomous OCP center in IEC equipments, Enclosure, Communication modules, Wiring Devices , Network Connectivity, Cable management, PC based Software, Mobility Apps & FD products Through Efficient OCP Delivery Center Effective & Engaged workforce Best in Class Project Execution…! Annual Goals (Entity level) to meet permanent objectives. Jan’14 Feb’14 Plan Vs Actual for Project on Time To Delivery (TTD) on Milestones (With Cost baseline at DO of project) E Mech (Weeks) 0 3 1st Priority, Start tracking from Oct’13 TTD +0.6 19 Plan Vs Actual for Project on Time To Delivery (TTD) on Milestones (With Cost baseline at DO of project) Software (Weeks) % of “First time right” at Mfg Proto Verification / Validation & Certification E Mech 85% 88% FTR 4.18 % of “First time right” at Defect Density / KLoC (Software Cumulative) 3.5 Make our R&D team as “Great Team to Work”( EEI %) H1 2013 (Achieve best in class result for 5specific question in ENPS) 48 - EEI% Make our R&D team as “Great Team to Work”(EEI %) H2 2013 (Achieve best in class result for 5specific question in ENPS) 61 -

  2. FTR and TTD for E Mech

  3. FTR and TTD for Software

More Related