BCTS and As-Built Roads

BCTS and As-Built Roads. FRPA - FOREST PLANNING AND PRACTICES REGULATION Part 6 – Notifying and Reporting to Government Section 86 - Annual Reports.

tova
Download Presentation

BCTS and As-Built Roads

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BCTS and As-Built Roads Resource Tenures & Engineering Branch

  2. FRPA - FOREST PLANNING AND PRACTICES REGULATIONPart 6 – Notifying and Reporting to GovernmentSection 86 - Annual Reports Resource Tenures & Engineering Branch

  3. Subsection (3)Before June 1 of each year, a timber sales manager must submit to the district manager information respecting the following matters that occurred during the reporting period:a) for roads constructed under section 3 (2) (c) [forest stewardship plan required] of the Act, the information referred to in subsection (2) (a) and (b); Resource Tenures & Engineering Branch

  4. Subsection 2 (a) and (b)(a) for any road that is a permanent access structure that has been constructed, information respecting (i) the location of the road, (ii) the location, type and overall length of any bridges, (iii) the location and the diameter or span of any major culverts and of any fish-stream culverts, (iv) the stream crossing identifiers for bridges and culverts referred to in subparagraphs (ii) and (iii), (v) the location of engineered structures other than bridges, culverts or fords, and (vi) the location of road sections containing stumps, roots and embedded logs left or placed (A) under the road fill within the road prism width, if the road is located on landslide prone terrain, or (B) under the travelled portion of the road fill for other road locations;(b) the location of any road that is a permanent access structure that has been deactivated; Resource Tenures & Engineering Branch

  5. Subsection (4)Information required under this section must be in a form and manner satisfactory to the minister. Resource Tenures & Engineering Branch

  6. The “manner” will be via Electronic Submission Format (ESF) Info electronically submitted and collated in FRMA BCTS, similar to licensees, will be providing electronic as-built road spatial and attribute data in keeping with annual reporting requirements Resource Tenures & Engineering Branch

  7. ESF Submission would include spatial location of the road and physical attributes such as bridges and culverts Resource Tenures & Engineering Branch

  8. Bridges - FRPA requires location, type, length and identifiers for bridges - this translates into the following mandatory data requirements: Resource Tenures & Engineering Branch

  9. List of FRMA Bridge values Resource Tenures & Engineering Branch

  10. FRMA can capture more information than the “mandatories” additional info can be optionally provided Resource Tenures & Engineering Branch

  11. FRPA requires location, diameters and identifiers for major culverts AND stream culverts - this translates into the following mandatory requirements: Resource Tenures & Engineering Branch

  12. Optional info for Major Culverts and Stream Culverts Resource Tenures & Engineering Branch

  13. FRPA requires road section locations which contain stumps, roots and embedded logs: The FRMA Feature Type would identify whether the organics were: - in road fill, or - under the travelled road portion Resource Tenures & Engineering Branch

  14. Construction Data Requirements Resource Tenures & Engineering Branch

  15. Engineered Structure Data Requirements Resource Tenures & Engineering Branch

  16. Deactivation Data Requirements Resource Tenures & Engineering Branch

  17. Access control features are optional but if submitted would consist of the following information: Resource Tenures & Engineering Branch

  18. LINKAGE ESF Oracle DB Server (Victoria) Resource Tenures & Engineering Branch