1 / 56

The Production Team

The Production Team. Trolley Enterprises (The Manufacturer) Freightliner (Chassis Manufacturer). The Trolley Enterprises, Team. Has been providing high quality trolleys since 1974. Have operated a fleet of 34 Trolleys for over 28 Years Total customer-satisfaction 10 year Altoona Tested

tovah
Download Presentation

The Production Team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Production Team • Trolley Enterprises(The Manufacturer) • Freightliner(Chassis Manufacturer)

  2. The Trolley Enterprises, Team • Has been providing high quality trolleys since 1974. • Have operated a fleet of 34 Trolleys for over 28 Years • Total customer-satisfaction • 10 year Altoona Tested • 24 Hour Parts Delivery

  3. Specifications • Trolley Enterprises Trolley • All Aluminum Body Panels • Stainless Steel Step Wells • Stainless Steel Wheel wells • Top speed 65 mph • Solid Oak Seats and Trim

  4. Assembly Building

  5. The Wield Shop

  6. Integrated Electric Traction System Kit

  7. Hybrid Power Plant

  8. Hand Primed 2” x 2” X 7 GA. Floor Supports

  9. 1 ½” x 1 ½” x 1/8” Angle Iron Floor Supports

  10. Hand Primed

  11. Insulated Roof & Side Walls

  12. 1st marine plywood then 15 lb felt paper to better protect from leaks

  13. 1 1/2 “ 11 ga tubing supports the main roof and Coupola

  14. Stainless Steel Wheel wells

  15. Entire Super Structure is Hand Primed 1 ½” x 1 ½” x 11 ga.

  16. ADA Approved Lifts

  17. Battery Design: • 12 volt battery • UL 94 V-0 Noryl • Lifting handles (XE 30, 40 & 70)M6(F) no maintenance terminals • Can be mounted in any orientation • Rugged construction • JIS footprint • Non Telecordia approved • Performance Features: • 12+ year life @ 25°C • Wide temperature range (-40°C to >+80°C) w/ metal jacket • 300+ full depth of discharge cycles • High discharge rate • Rapid recharge • Deep discharge recovery • Long shelf life • Low internal resistance • High shock and vibration resistance For extreme environments UL Recognized Component. Meets UL 1989 and UL 1778Caution: Batteries contain toxic materials (Pb and H2SO4) - Avoid short circuit - Do not charge in gas-tight container.Sealed-lead rechargeable batteries must be recycled or disposed of properly. Contact Hawker Energy Products Inc. Customer Service for details.

  18. Dimensions in. (mm) Products A B C D E F Weight lb.(kg) Genesis XE 70 13.020(330.71) 6.620(168.15) 6.930(176.02) 9.69(246.13) 2.45(62.23) .31(7.9) 56.6(25.7) Genesis XE 70Xw/metal jacket 13.020(330.71) 6.620(168.15) 6.930(176.02) 9.69(246.13) 2.45(62.23) .31(7.9) 59.1(26.8) For extreme environments Genesis XE 70 Mechanical SpecificationsAll dimensions, excluding weight, are maximum UL Recognized Component. Meets UL 1989 and UL 1778Caution: Batteries contain toxic materials (Pb and H2SO4) - Avoid short circuit - Do not charge in gas-tight container.Sealed-lead rechargeable batteries must be recycled or disposed of properly. Hawker Energy Products Inc. Customer Service for details.

  19. Photo Gallery

  20. Kubota Diesel APU

  21. Reliance Power Plant A/C

  22. Installing Battery Mgmt. System

  23. Solid Sealed Construction

  24. All Harness Loomed & Secured

  25. Patented Mgmt. System

  26. Clean, Neat Installation

  27. Air Cooled Battery Compartment

  28. Dual 12v Batteries for APU & Accessories

  29. Sealed Traction Inverter

  30. Completed Battery Installation

  31. Direct Drive – No Transmission

  32. We Test in All Types of Weather

  33. Complete Battery Pack Mgmt. System

  34. Easy View Gauges for Driver Monitoring

  35. The Team of Engineers & Investors

  36. The Finished Product

  37. Easy Battery Access

  38. Easy Access to APU

  39. A/C Compressors Attached

  40. Direct Drive

  41. Easy Access Fuse Panel

  42. Access on All Three Sides plus from Inside and Top

More Related