1 / 33

SC Link Point 1 and Point 5 J.P. Corso EN-MEF-INT Y. Muttoni EN-MEF-INT

SC Link Point 1 and Point 5 J.P. Corso EN-MEF-INT Y. Muttoni EN-MEF-INT. Overview. Geographical location Equipment at point 1 Equipment at point 5. Geographical location. Point 5. LHC. Point 1. Point 1. Point 1 Top view Shafts. Point 1 Top view Buildings.

trentonm
Download Presentation

SC Link Point 1 and Point 5 J.P. Corso EN-MEF-INT Y. Muttoni EN-MEF-INT

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SC Link Point 1 and Point 5J.P. Corso EN-MEF-INTY. Muttoni EN-MEF-INT 1st HiLumi LHC/LARP Collaboration meeting

  2. Overview • Geographical location • Equipment at point 1 • Equipment at point 5 1st HiLumi LHC/LARP Collaboration meeting

  3. Geographical location Point 5 LHC Point 1 1st HiLumi LHC/LARP Collaboration meeting

  4. Point 1 1st HiLumi LHC/LARP Collaboration meeting

  5. Point 1 Top viewShafts 1st HiLumi LHC/LARP Collaboration meeting

  6. Point 1 Top view Buildings 1st HiLumi LHC/LARP Collaboration meeting

  7. Point 1 Top View Underground 1st HiLumi LHC/LARP Collaboration meeting

  8. Geographical location UJ14 LHC Insertions Upgrade Working Group (LIUWG) 20-03-2008

  9. Equipment in place IP1 Q3 DFBX Warm D1 UJ13 1st HiLumi LHC/LARP Collaboration meeting

  10. Point 1 Left Machine Equipment IP1 IP1 UJ14 DFBX Q3 UJ13 Warm D1 1st HiLumi LHC/LARP Collaboration meeting

  11. Equipment in place UJ14 IP1 UJ14 New SC link should be installed to connect underground equipment machine and surface electrical equipment. Q2 RB14 1st HiLumi LHC/LARP Collaboration meeting

  12. Equipment in place UJ14 All the equipment should be installed in a new surface building. IP1 UJ14 LHC Insertions Upgrade Working Group (LIUWG) 20-03-2008

  13. Geographical location UL14 LHC Insertions Upgrade Working Group (LIUWG) 20-03-2008

  14. By pass building UL14 SC link pass in this gallery. UL14 1st Floor UL14 Ground Floor 1st HiLumi LHC/LARP Collaboration meeting

  15. Geographical location US15/PM15 LHC Insertions Upgrade Working Group (LIUWG) 20-03-2008

  16. Shaft PM15 (Height ~ 85 meter) The two SC link pass in the shaft. One from right side One from left side. 1st HiLumi LHC/LARP Collaboration meeting

  17. Building SD1 A way should be found for the two SC link. PM15 1st HiLumi LHC/LARP Collaboration meeting

  18. Building SD1 1st HiLumi LHC/LARP Collaboration meeting

  19. New building SD1 All the equipment moved from UJ14 and UJ16 should be installed in this new surface building. 1st HiLumi LHC/LARP Collaboration meeting

  20. Point 5 1st HiLumi LHC/LARP Collaboration meeting

  21. Point 5 Top viewShafts 1st HiLumi LHC/LARP Collaboration meeting

  22. Point 5 Top view Buildings 1st HiLumi LHC/LARP Collaboration meeting

  23. Point 5 Top View Underground 1st HiLumi LHC/LARP Collaboration meeting

  24. Geographical location RZ54 1st HiLumi LHC/LARP Collaboration meeting

  25. Point 5 Left Machine Equipment RZ54 Q3 DFBX IP5 IP5 Warm D1 1st HiLumi LHC/LARP Collaboration meeting

  26. Equipment in place RZ54-USC55 New shaft for SC Link Height ~85 meter LHC Insertions Upgrade Working Group (LIUWG) 20-03-2008

  27. Equipment in place RZ54-USC55 Some equipment should be installed in a new surface building. See next slide. LHC Insertions Upgrade Working Group (LIUWG) 20-03-2008

  28. Point 5 New surface building Left side 1st HiLumi LHC/LARP Collaboration meeting

  29. Geographical location UJ56 1st HiLumi LHC/LARP Collaboration meeting

  30. Point 5 Right Machine Equipment IP5 DFBX Q3 UJ56 Warm D1 IP5 UJ57 1st HiLumi LHC/LARP Collaboration meeting

  31. Equipment in place UJ56 Way for SC Link from surface to underground should be studied. Some equipment should be installed in a new surface building. No space found yet. LHC Insertions Upgrade Working Group (LIUWG) 20-03-2008

  32. Point 5 New surface building* Right side * A place must be found 1st HiLumi LHC/LARP Collaboration meeting

  33. Thanks for your attentionQuestions? 1st HiLumi LHC/LARP Collaboration meeting

More Related