B-Trigger Working Group Work-plan

John Baines. B-Trigger Working Group Work-plan. B-trigger in the TDR: Di-muon triggers Full-scan based triggers RoI guided B-trigger Algorithms & frameworks Summary. This talk: http://hepunx.rl.ac.uk/atlasuk/simulation/level2/meetings/pesa201102/B-trigger-status.ppt

tricia
Download Presentation

B-Trigger Working Group Work-plan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. John Baines B-Trigger Working GroupWork-plan • B-trigger in the TDR: • Di-muon triggers • Full-scan based triggers • RoI guided B-trigger • Algorithms & frameworks • Summary This talk: http://hepunx.rl.ac.uk/atlasuk/simulation/level2/meetings/pesa201102/B-trigger-status.ppt http://hepunx.rl.ac.uk/atlasuk/simulation/level2/meetings/pesa201102/ B-trigger-status.ps http://hepunx.rl.ac.uk/atlasuk/simulation/level2/meetings/pesa201102/ B-trigger-status.pdf

  2. B-Physics Trigger in the TDR • Demonstrate viable & affordable B-physics trigger based on the evaluation of two strategies: • 1) Di-muon trigger at L=2x1033, introducing full scan at lower luminosity • 2) RoI guided B-trigger, possibly with addition of full-scan at lower luminosity • To do this need measurements of: • Efficiency for signal channels • Rate • c.p.u resource estimate based on test-bed measurements for whole chain.

  3. Status of di-muon & full-scan triggers 1) Di-muon trigger at L=2x10^33, introducing full scan at lower luminosity • Current Status: • Full-scan based strategy studied in detail using fully-simulated events and appropriate LVL2 and EF algorithms and documented in TP back-up document: ATL-DAQ-2000-031 • Robustness of selection w.r.t. ID misalignment studied & documented in: ATL-DAQ-2001-006 • EF selections documented: • Rejection of rate at EF for J/Y, Ds and B0d->pp channels. (Moscow) ATL-DAQ-2000-017 • Event Filter Rate for the Ds Trigger (Innsbruck) ATL-DAQ-2001-003 • Impact of only having 2 pixel layers at start-up studied using IDscan LVL2 algorithm • Estimates exist for LVL1 di-muon rates and EF rates after J/Y(m,m) and B->mmX trigger selections • Required c.p.u. resources have been estimated based on measured rates and executions times and documented in: ATL-COM-DAQ-2002-013 • Algorithms : • LVL2: mFast (barrel only), Pixel-scan+sctKalman, IDscan, TRT-LUT, xKalmanTRT • EF: xKalman, muon-? (for resource calculations assume mFast re-run at EF)

  4. Benchmarking & Resource Estimates Preliminary paper model results (April 2002): Final Farm size Difference ~25 c.p.u Min. size incl. B-physics Min. Farm size needed at startup LVL2 • Note: • Based on custom-LVL2 algorithms, light-weight EDM, excludes data access overheads • Most B-trigger resources required for LVL2 full-scan • In order to save cpu resources, estimate does not include TRT at LVL2: • => No J/psi(e,e) trigger • EF • Resources required at EF small compared with LVL2 (~few cpu) assuming: • xKalman starting with pixels and guided by Level-2 RoI • neglecting resources needed for muon reconstruction at EF • Current offline muon algorithms too costly in cpu : • => Only includes muons at LVL2 reconstructed by mFast B-trigger resource estimate: ATL-COM-DAQ-2002-013

  5. To do: di-muon & full-scan triggers 1) Di-muon trigger at L=2x10^33, introducing full scan at lower luminosity • To do: • Update di-muon trigger rates based on full simulation of signal and background (in conjunction with muon trigger group) - essential for TDR • Move LVL2 and EF algorithms to new selection framework - essential for TDR • Update resource estimates based on test-bed measurements using new selection framework and including conversion from byte-stream - essential for TDR • Measure trigger rates and trigger selection efficiencies for J/Y(m,m) and B->mm triggers using fully simulated events and appropriate LVL2 and EF algorithms. • Devise strategy for selecting rare decay channels, B->mmX, at EF • Updates full-scan studies using DC1 data.

  6. Using Calorimeter RoI to guide B-physics Triggers • Preliminary studies of using low ET RoI to define regions to search ID at LVL2(Alan Watson) • Uses fast simulation : • ATLFAST + parameterised calorimeter simulation • Initial results encouraging,see Alan Watson’s talk:http://www.ep.ph.bham.ac.uk/user/atw/bmeet/B-roi-feb02.ppt • EM RoI ET>2 :for J/y(ee) and muon-electron triggers • Mean Multiplicity = 1.1 (B->mX , m pT > 6 GeV) • Effic. to tag both e in J/y(e,e) : 80% (e pT >3 GeV) • Jet RoI (0.8 x 0.8 cluster) ET>5 :for B(pp) and Ds(fp) • Mean Multiplicity = 1.7 (B->mX, m pT > 6 GeV) • Efficiency • B p p • pTp> 4 GeV • RoI ET> 5 GeV • B Dsf • pT Ds, f> 1 GeV • RoI ET> 5 GeV • LVL2 reconstruction inside RoI • potential to save ~factor 10 in execution time c.f. full-scan • but with lower efficiency Actual efficiencies and cpu savings depend on thresholds & multiplicities => need full simulation

  7. RoI guided B-trigger 2) RoI guided B-trigger, possibly with addition of full-scan at lower luminosity • Current Status: • Preliminary studies using fast simulation • Rough c.p.u. resource estimates (ATL-COM-DAQ-2002-013) • To do: • Measure multiplicities for low ET LVL1 Jet RoI using full simulation (in conjunction with LVL1 group) - essential for TDR • Measure multiplicities for low ET LVL1 e/gamma RoI using full simulation(in conjunction with LVL1 group) - essential for TDR • Measure efficiencies for low pT e+e- from J/Y (in conjunction with e/gamma trigger group) • Measure trigger rates and efficiencies for B(pp) and B(Dsf(KK)p) signal channels • Update resource estimates

  8. RoI Guided B-trigger - To do • In RoI guided scheme, the main factors driving resource requirements are: • muon trigger rate & muon algorithm time • Jet RoI multiplicity, Jet RoI Size, time for ID reconstruction in Jet RoI • => Important to confirm RoI multiplicities with full simulation • => Need full simulation to determine trigger efficiency for signal channels • Requires : • Simulation of: • Level-1 EM/Tau trigger algorithm - done (Ed Moyse) • Level-1 Jet trigger algorithm - done (Ed Moyse) • Level-1 electronics (noise) - status? • Generation of simulated data : • single particles for calibration - done • B->mX events - done • signal channels : B->pp, B->J/y(ee), B->Ds(f(KK)p) - done • min. bias - done • Addition of pile-up (including pulse history in ECAL). - in progress • Calibration of ECAL energies (e/gamma work-group) - in progress • Level-1 studies - Optimisation of thresholds (Level-1 work-group) - in progress

  9. RoI-guided B-trigger – To do (contd.) • Requires: • New datasets (including pile-up) • Algorithms able to read new datasets (LVL2 & EF) Verification / optimisation of LVL2 & EF algorithms with latest layout : Timing measurements for complete chain: • Requires: • Byte-stream data for all detectors. • Convertors for all detectors • Optimized algorithms – LVL2 & EF • B-trigger studies including muon trigger: • Confirm previous results (Kine muon) • Study di-muon trigger – thresholds, rates • Requires: • New datasets including muon simulation • Muon algorithms available in new framework (LVL2 & EF, barrel & end-cap) • Event Filter Selection: • Study B->mm(X) selections • Study using LVL2 to guide EF • Requires: • EF algorithms • RoI guidance mechanism for EF

  10. LVL2 Algorithms & Frameworks • cTrig: standalone framework using TDR ASCII file input: • http://hepunx.rl.ac.uk/atlasuk/simulation/level2/doc/ctrigCVS/ • Pixel-scan, sctKalman, IDscan, TRT-LUT, xKalman-TRT • electron-id, B-physics and timing Ntuples • truth information Used for TP - work being discontinued in this framework • Athena using TrigSteerExample1 (currently TDR data only): • http://hepunx.rl.ac.uk/atlasuk/simulation/level2/doc/Prototypes/TrigSteerExample1/ • Pixel-scan, sctKalman, TRT-LUT, xKalman-TRT • electron-id, B-physics and timing Ntuples • full access to truth information For the time being using Offline classes. Will migrate to new EDM as it becomes available Developed as prototype - direct port of cTrig algorithms and simple EDM to athena. Has not been used for trigger studies; but in principle could be. • New PESA framework: • Work has started on porting TRT-LUT, SiTree, L2Calo, IDscan, mFast • Working chain expected for Trigger release 6 - Feb 2003 • Full access to truth information (navigation from track to truth) is essential - must make sure this is delivered! Aim to move to this framework as soon as possible - but when ?

  11. Summary • A lot of work to do, time-scale very tight. Priorities are : • LVL1 guidance (RoI) to LVL2 B-trigger: • di-muon trigger • Low ET Jet Trigger • Low ET Electron trigger • LVL2 guidance (RoI) to EF • Updates with DC1 data (new geometry). • EF selection for B->mm(X) • A lot of work is still on hold awaiting new data and software. • PESA core s/w still evolving fast. Need stable environment (releases, examples) to enable algorithm development to restart. • People have drifted away from B-trigger working group to other things • Current work is taking place within other working groups: • muon trigger • LVL1 validation • porting of algorithms to new framework • Need to attract people back by providing: • a well defined programme of work • a stable set of tools complete with examples and basic documentation. • A first step: low pT electron reconstruction for J/Y trigger using “electron vertical slice” • Must be in position to enable new people to join work early in new year!