An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. S A N M A R C O S U N I F I E D S C H O O L D I S T R I C T Proposition K U P D A T E Governing Board Presentation August 23, 2010 LPA Part 1 of 2 Parts

  2. FACILITY PLANNING PROCESS 1. District Wide Modernization Needs Assessment Site Surveys (3) Meetings w/ each MS Family Sub-committee 2. Facilities Advisory Committee (4) Meetings District & Community Members 3. District Facilities Master Plan Finalize Analysis Scope Prioritization 11/ 07 – 7 / 08 4 / 08 – 7 / 08 10 / 09 – 7 / 10 PHOTOS OF PAST LPA INC PROJECTS FOR CONCEPTUAL USE ONLY

  3. Scope Categories LPA

  4. Speech/ Tutoring center Small Group Instruction Kindergarten Play st st Toilet classroom classroom classroom classroom Library/ Media Center pod Toilet pod core Kindergarten classroom classroom classroom rr classroom Work Room rr Public Entry Courtyard SCOPE CATEGORIES 1. Portable Replacement & Student Safety replace Aging Sub-Standard Classrooms & Upgrade Site Infrastructure 2. Kindergarten CDE compliance Construct New 1,350 SF Classroom 3A. Elementary Facility Program Equity Reconfigure MPR to Library or New Library 3B. ES & MS Facility Program Equity New MPR, Lunch shelter, or Food Service 4. Program Enhancement New (3) CR Facility @ (3) Sites District wide visual & performing arts, math science & communications Classroom / lab 3 Classroom/ lab 1 Classroom/ lab 2 First Floor PHOTOS OF PAST LPA INC PROJECTS FOR CONCEPTUAL USE ONLY

  5. Platform/ Stage Lunch Shelter MPR Kitchen Service SCOPE CATEGORIES 5. Technology Infrastructure Essential Systems Upgrade & Technology Equipment 6. Existing Classrooms Modernize Existing Instructional Spaces to Facilitate 21st Century Learning 7. Existing Library/MPR/Performing Arts Modernize Existing Program Enrichment Spaces 8. Existing Physical Education Modernize Existing Gyms and Add Sports court Flooring 9. Future Growth flexibility Stub-Out Utilities for Future Classrooms after after PHOTOS OF PAST LPA INC PROJECTS FOR CONCEPTUAL USE ONLY

  6. SCOPE CATEGORIES 10. Curb Appeal site Security Landscape and Site Perimeter Fencing 11. Play fields Upgrades As Needed 12. Weather Protection New Covered Walks and/or Shade Structure 13. Administration/Staff Support Spaces Modernize and/or Expand Administration/Staff Lounge after after PHOTOS OF PAST LPA INC PROJECTS FOR CONCEPTUAL USE ONLY

  7. PROGRAM SCOPE CHECKLIST MAJOR RECONSTRUCTION BASE PROGRAM PORTABLE REPLACEMENT

  8. Student Safety & Technology Base Program Sites Carrillo Elementary School Discovery Elementary School San Elijo Elementary School San Elijo Middle School Mission Hills High School Twin Oaks High School LPA

  9. MASTER PLAN PROGRAM Discovery Elementary School Proposed Scope of work (Plus Scope #13 Technology & Infrastructure)

  10. Portable Replacement Sites Knob Hill Elementary School Paloma Elementary School Twin Oaks Elementary School Woodland Park Middle School LPA

  11. MASTER PLAN PROGRAM Knob Hill Elementary School Proposed Scope of work (Plus Scope #13 Technology & Infrastructure)

  12. MASTER PLAN PROGRAM Woodland Park Middle School Proposed Scope of work (Plus Scope #13 Technology & Infrastructure)

  13. Major Reconstruction Sites Alvin Dunn Elementary School La Costa Meadows Elementary School Richland Elementary School San Marcos Middle School San Marcos High School LPA

  14. O L E1 D A1 P E2 G C ADMIN A1 J K1 A3 A1 M B A2 M F N N N N MASTER PLAN PROGRAM Alvin Dunn Elementary School legend A1 Lower Primary: (4)cr A2 Lower Primary: (2)cr A3 Lower Primary: (1)rsp,(1)lh B 2-Story Upper Primary (14)cr,(1)lh,(1)rsp C Multi-Purpose Bldg D Convert MPR into Library/ Media Center, Computer Lab and Speech/ Tutoring Center E1 Kindergarten: (1)cr E2 Kindergarten: (2)cr F Future Expansion: (4)cr G Relocated Play Structure H Covered Walkway J Convert into Admin K1 Existing Pre-school L Relocated Boys&Girls Club M (1)Art/Science, (1)At Risk Office, (2) Intervention N Existing Classrooms: (1)Adaptive PE, (2) Title1 (1)CSUSM O New Parking P Lunch Shelter Parking New Construction Existing Building Reconfigured Building Portable Building Gathering Areas Hard Courts Play Structure Covered Walkway Renovated Play Fields Vehicular Circulation Bus Circulation Drop-Off Fire Access Campus Entry Not Used Proposed Scope of work (Plus Scope #13 Technology & Infrastructure) H

  15. M B B E G L D C f A D G J1 H K1 J2 H J3 K2 M MASTER PLAN PROGRAM La Costa Meadows Elementary School legend A K-1st Grade: (3)k,(8)1stcr,(2)rsp, (2)lh,(2)pklh,(2)sh, (1)autism B 2-Story 2nd-5th Grade: (20)cr C Enrichment Center D Reconstruct MPR into Library/Media Center E Lunch Shelter F Future Expansion: (4)cr G Relocated Play Structure H Covered Walkway J1 Reconstruct Admin J2 Reconstruct Kind. into Speech/Tutoring J3 Reconstruct Kind. into Staff Workroom/Lounge K1 KOC K2 Future Preschool L Food Services M New Parking Parking New Construction Existing Building Reconfigured Building Portable Building Gathering Areas Hard Courts Play Structure Covered Walkway Renovated Play Fields Vehicular Circulation Bus Circulation Drop-Off Fire Access Campus Entry Proposed Scope of work (Plus Scope #13 Technology & Infrastructure) Not Used Joint-Use Play Fields

  16. G J1 G J2 K1 K2 MPR H C I F A1 A1 D B A1 E1 A2 E MASTER PLAN PROGRAM Richland Elementary School legend A1 Lower Primary: (4)cr A2 Lower Primary: (2)cr, (1)lh, (1)rsp B 2-Story Upper Primary (14)cr,(1)lh,(1)rsp C Enrichment Center D Reconstruct into Library/Media Center & Speech/Psychologist/ Counseling E Kindergarten: (3)cr E1 Kindergarten: (1)cr F Future Expansion: (4)cr G Relocated Play Structure H Covered Walkway I Reconstruct into Admin and Staff Workroom J1 Relocated Preschool J2 Relocated KOC K1 Food Services K2 Lunch Shelter Parking New Construction Existing Building Reconfigured Building Portable Building Gathering Areas Hard Courts Play Structure Covered Walkway Renovated Play Fields Vehicular Circulation Bus Circulation Drop-Off Fire Access Campus Entry Proposed Scope of work (Plus Scope #13 Technology & Infrastructure)

  17. B2 A2 A2 LIBRARY ADMIN C MPR ADMIN A3 GYM MASTER PLAN PROGRAM San Marcos Middle School legend legend Proposed Scope of work (Plus Scope #13 Technology & Infrastructure) A1 2-Story 7th/8th Grade: (12)la/ss,(2)rsp,(2)lh A2 7TH/8TH Grade:(6)math A3 7th/8th Grade:(6)science B1 2-Story 6th Grade: (6)math/science labs, (1)art,(3)cr,(1)sh B2 6TH Grade: (6)la/ss, (1)rsp,(1)lh,(1)tech C Convert Kitchen to Music/Choral E Shower/Locker Rooms -Lower Level F Relocated Boys and Girls Club G1 Food Services G2 Lunch Shelter H Future Growth J Pe Expansion Lab Parking New Construction Existing Building Reconfigured Building Portable Building Gathering Areas Hard Courts Play Structure Covered Walkway Renovated Play Fields Vehicular Circulation Bus Circulation Drop-Off Fire Access Campus Entry H B1 A1 E (BELOW) G2 G1 J F