PXL Detector Sensor and RDO Review Introduction
Talk Outline • Purpose • Charge • Agenda
Purpose • Development project for > 5 years • CD-2/3 Production Readiness Review estimated for • November 2010 • No previous subsystem level focused review, this is a good opportunity for additional design input. • This review is intended to give us feedback on both the state of the subsystem (as it is) and uncover and quantify any design or documentary shortcomings before the CD-2/3 review in time to address them before we enter the DOE review process.
Charge • The scope of the review is the sensor and RDO system for the PXL detector system. • Does the proposed design meet the requirements as stated? • Is the design consistent with good practice and appropriate to the task? • Does the team possess the knowledge and skills to carry out the project? • Is the cost and schedule realistic and appropriate? • Is the documentation adequate to present the design?
Agenda • HFT design (LG) • Sensors (MS) • System Hardware Architecture (LG) • System Firmware and Software Architecture (XS) • Hardware prototyping status (MS) • Firmware and software prototyping status (XS) • Project Status (LG) • There will be discussion sessions on Wednesday afternoon and Thursday morning for clarification and detailed questions.
WBS Structure • 1.2.2 PXL Electronics • 1.2.2.1 Phase-1 Sensor • 1.2.2.1.1 Phase-1 Prototype • 1.2.2.1.2 Phase-1 Production • 1.2.2.2 PXL Sensor • 1.2.2.2.1 PXL Sensor Prototype • 1.2.2.2.2 PXL Sensor Production • 1.2.2.3 Ladder Cable • 1.2.2.3.1 Infrastructure Test Cable • 1.2.2.3.2 Prototype Ladder Cable (FR-4) • 1.2.2.3.3 Ladder Cable (Kapton + Cu conductor) • 1.2.3.3.4 Ladder Cable (Kapton + Al conductor) • 1.2.2.3.5 Ladder Cable PXL Sensor • 1.2.2.4 Phase-1 Ladder Assembly • 1.2.2.4.1 Ladder Mechanical / Electrical Prototypes • 1.2.2.5 Read-out Electronics • 1.2.2.5.1 RDO Board • 1.2.2.5.2 Mass Termination Board • 1.2.2.5.3 RDO PCs • 1.2.2.5.4 Control PC System • 1.2.2.6 PXL Sensor Ladder Production