An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BATAN PLTN SEBAGAI SALAH SATU SOLUSI KRISIS ENERGI Dr.Ir. A. Sarwiyana Sastratenaya Disampaikan pada Seminar Nasional bertema: “PEMANFAATAN TEKNOLOGI NUKLIR SEBAGAI SUMBER ENERGI” Diselenggarakan oleh: Himpunan Mahasiswa Kimia Fakultas Matematika dan Ilmu Pengetahuan Alam Universitas Andalas Padang, 2 Mei 2009 BADAN TENAGA NUKLIR NASIONAL JL. KUNINGAN BARAT, MAMPANG PRAPATAN, JAKARTA 12710, TELPON: 5255213

  2. MATERI CERAMAH • Krisis Energi, Krisis Lingkungan • Energi listrik VS Kesejahteraan • Status dan Peran PLTN di Dunia • Kebijakan Energi Nasional • Landasan Filosofis PLTN • Prinsip Pembangkitan Listrik Tenaga Nuklir • Bahan Bakar PLTN • Keselamatan PLTN • Aspek Lingkungan • Keekonomian PLTN • Keselarasan PLTN dan Lingkungan • Teknologi Pengelolaan Bahan Bakar Bekas Limbah Nuklir dan Dekomisioning • Kesiapan Pemanfaatan PLTN di Indonesia • Studi Pembangkitan Listrik Sumatera Dengan Opsi Nuklir • Kesimpulan

  3. KRISIS ENERGI 1970-AN: KRISIS ENERGI AKIBAT HARGA MINYAK MELAMBUNG, MAKA BANYAK NEGARA BERALIH MEMANFAATKAN ENERGI NUKLIR-PLTN (KOREA, JEPANG, TAIWAN, PERANCIS….). 1970-1980 PERANCIS MEMBANGUN SEBANYAK ~ 40 PLTN. 2007: KRISIS ENERGI KEDUA (KENAIKAN HARGA MINYAK BUMI YANG SANGAT TINGGI, MENCAPAI ~ 148 US$/barel, Agustus 2008): • BERAMAI-RAMAI KEMBALI MEMPERTIMBANGKAN PLTN • MENGEVALUASI KEBIJAKAN, PEMANFAATAN PLTN (INGGRIS, JERMAN, AMERIKA SERIKAT…..) Angela Merkel: "Saya merasa ini arah yang salah. Bukan sikap terbaik bagi Jerman, sebagai kekuatan ekonomi terbesar Eropa jika kita harus membeli energi listrik dari Prancis dan Finlandia hanya karena kita menutup PLTN kita sendiri,” (SUARA PEMBARUAN DAILY Wednesday, July 16, 2008 “McCain, Angela Merkel, dan Isu PLTN”, Markus Wauran)

  4. PERUBAHAN PANDANGAN TERHADAP PLTN DI EROPA Newsweek, August 18/August 25, 2008 Jerman: • Mempertimbangkan untuk membatalkan phaseout PLTN Inggris: • Akan membangun 8 PLTN baru dalam waktu 15 tahun Perancis: • Akan membangun PLTN ke-61 Italia: • Berencana membatalkan phaseout PLTN Swedia: • Menghentikan phaseout PLTN pada tahun 2005 Sumber : Newsweek, August 18/August 25, 2008

  5. KRISIS LINGKUNGAN GAS RUMAH KACA, MENYEBABKAN PEMANASAN GLOBAL PERUBAHAN IKLIM EKSTRIM • Kenaikan suhu permukaan bumi, pencairan es di kutub, kenaikan permukaan laut, • Pergeseran musim dan volume hujan tinggi, bencana banjir, badai. Di lain pihak perubahan musim menciptakan kondisi kekeringan, kekurangan air, KRISIS KETERSEDIAAN AIR

  6. Pemikiran-ulang Tentang Nuklir(Pendiri Green Peace pun Pro Nuklir) Patrick Moore: “Pandangan saya telah berubah, karena energi nuklir adalah satu-satunya sumber listrik yang tidak memancarkan gas rumah-kaca, yang dapat secara efektif mengganti bahan-bakar fosil, guna memenuhi permintaan energi yang semakin bertambah” Moore, Patrick - ”Nuclear Re-Think”, IAEA Bulletin, Volume 48/1. September 2006. (www.iaea.org)

  7. Energi Listrik VS Kesejahteraan

  8. Luxemburg GDP US$ per Kapita VS Listrik kWh per Kapita Negara Dunia Tahun 2003 Norwegia AS Jepang Ice land Perancis Singapura Sumber: Diolah dari http://earthtrends.wri.org/text/economics-business/variable-638.html http://earthtrends.wri.org/text/energy-resources/variable-574.html

  9. Jepang GDP US$ per Kapita VS Listrik kWh per Kapita Negara Asia Tahun 2003 Hongkong Singapura Korea Indonesia (440, 1092) Sumber: Diolah dari http://earthtrends.wri.org/text/economics-business/variable-638.html http://earthtrends.wri.org/text/energy-resources/variable-574.html Malysia Thailan

  10. Status dan Peran PLTNdi Dunia

  11. Keluarga Energi Dunia 437 PLTN Ops 370 GWe(~ 16% Listrik dunia) 30 PLTN Konst. 22,4 GWe

  12. 60% 40% 20% 0% 1900 1950 2000 2050 Prospek PLTN di Dunia CHINA Kapasitas Nuklir bertambah30 GWe pada 2020 Menjadi ~ 38,5 GWe FINLAND Reaktor ke-5 JAPAN Kapasitas Nuklir bertambah20GWe pada 2015 Menjadi ~ 67,5 GWe USA Kapasitas Nuklir bertambah 50 GWe pada 2020 Menjadi ~ 148 GWe INDIA Kapasitas Nuklir bertambah18 GWe pada 2020 Menjadi ~ 22 GWe KOREA Kapasitas Nuklir bertambah9 GWe pada 2015 Menjadi ~ 26,5 GWe BRAZIL Program Nuklir bangkit & berkembang Batubara Gas EBT BBM Nuklir Hidro

  13. KEBIJAKAN ENERGI NASIONAL

  14. Peraturan Presiden No. 5 Tahun 2006KEBIJAKAN ENERGI NASIONAL

  15. Pegembangan Energi Baru dan TerbarukanMenurut Perpres No. 5/2006

  16. (Juta SBM) TABEL REALISASI DAN PROYEKSIENERGI PRIMER Bumi LAMPIRAN O2 TABEL REALISASI DAN PROYEKSI ENERGI, PRIMERPeraturan Presiden Nomor 5 Tahun 2006 60

  17. Landasan Filosofis PLTN

  18. Landasan Filosofis PLTN • KESELAMATAN DAN KEAMANAN HARUS SELALU DIUTAMAKAN • IPTEK NUKLIR HANYA UNTUK TUJUAN DAMAI • “DISESUAIKAN DENGAN KEBUTUHAN” DAN “KEPUASAN PELANGGAN”

  19. Prinsip Pembangkitan Listrik Tenaga Nuklir

  20. PLTN, Turbin, Generator

  21. Prinsip Kerja PLTU & PLTN PLTU PLTN

  22. Atom Terbelah MenghasilkanPanas dan Neutron Panas Neutron

  23. Reaksi Berantai .

  24. Reaktor PWR

  25. Bahan Bakar PLTN

  26. 20 gr Uranium Oksida(= 2,25 Ton Batubara)

  27. Uranium dibungkus Keramik

  28. Perangkat Bahan Bakar Nuklir

  29. Keselamatan PLTN

  30. RISIKO PADA KESELAMATAN DAN KEHIDUPAN SOSIAL AKIBAT PENGOPERASIAN PLTN RISIKO YANG DIAKIBATKAN OLEH TEKNOLOGI- TEKNOLOGI LAIN Prinsip Persyaratan Utama

  31. Azas Keselamatan Teknologi Nuklir • ALARA(As Low As Reasonably Achievable): • AZAS MANFAAT, • MANFAAT> RISIKO • AZAS OPTIMASI, • UPAYA KESELAMATAN MAKSIMAL TAPI DALAM BATAS KEWAJARAN • AZAS LIMITASI, • HARUS DITETAPKAN BATAS-BATAS DOSIS RADIASI YANG DIIJINKAN

  32. Keselamatan diupayakan sejak desain Dinding gedung pengungkung beton ≈ 1 meter Bejana pengungkung baja 3,75 cm Dinding Dry Well beton 1,5 meter Bio Shield Beton+Pb 1,2 meter diapit baja 3,75 cm(dalam+luar) Bejana Reaktor Baja 10—20 cm Bahan Bakar Weir Wall Beton 45 cm

  33. Aspek Lingkungan

  34. KONTRIBUSI TERHADAPPEMANASAN GLOBAL g-CO2 eq. / kWh (Source : IAEA, 2006)

  35. Skala Kejadian Nuklir InternasionalInternational Nuclear Event Scale (INES)

  36. Skala Kejadian Nuklir InternasionalInternational Nuclear Event Scale (INES)

  37. Kecelakaan Chernobyl

  38. Keekonomian PLTN

  39. Pembandingan Biaya Konstruksi PLTN US $/kW 5,144 ※ 1Euro =1.54 US$ 5,000 Votgle : 3,200 #1 4,300 4,000 3,376 3,234 3,176 3,003 #2 2,888 3,000 2,000 2,000 1,000 0 SUMBER: KHNP 2008

  40. DATA KOMPONEN BIAYA (2008) Discount rate 10% Investasi PLTN mengacu pada PLTN di Jepang (3,234 $/kWe) yang mempunyai kemiripan tingkat kegempaan dengan kondisi di Indonesia

  41. BIAYA PEMBANGKITAN(cent/kWh) *) Ketersediaan gas alam di Jawa-Bali sangat terbatas **) 1/3 dari total jumlah bahan bakar PLTN diisi ulang setiap 18 bulan

  42. KESELARASAN PLTN dan Lingkungan

  43. PLTN dan Masyarakat Sekitar

  44. PLTN dan Masyarakat Sekitar Korea TANGGUNGJAWAB PERUSAHAAN PADA MASYARAKAT SEKITAR (CSR) Mihama, Jepang JAMINAN KEAMANAN DAN KESELAMATAN MASYARAKAT

  45. Teknologi Pengelolaan Bahan Bakar Bekas Limbah Nuklir dan Dekomisioning

  46. Limbah Operasi dan Bahan Bakar Bekas PLTN1000 Mwe/Tahun (PWR) BAHAN BAKAR BEKAS PLTN AKTIVITAS TINGGI, 8 M3 UMUR PANJANG Am (t1/2) 432 tahun Tc (t1/2) 210 ribu tahun Pu (t1/2)24,4 ribu tahun OPERASI PLTN AKTIVITAS RENDAH – SEDANG, 300M3 Xe (t1/2)5,3 hari I-131 (t1/2)8 hari Co-60 (t1/2)5,27 tahun Sr-90 (t1/2)27,7 tahun Cs-137 (t1/2)30 tahun

  47. Penyimpanan SementaraBahan Bakar Bekas AREVA: Radioactive waste and used fuel

  48. Pengolahan Limbah Radioaktif PLTN tingkat Rendah dan Sedang

  49. Konsep Penyimpanan Lestari Limbah Aktivitas Tinggi(Penyimpanan Tanah Dalam) 600-1000 m