Compressor ReVamp and Fabrication. PO9452. Update. Revised Concept Generation Selected some concepts Scheduled Conference call with Dresser Rand Schedules Visit to Dresser Rand for Week 5 to have Design Review. Architecture. Sub System Break Down. Installation
E N D
Update • Revised Concept Generation • Selected some concepts • Scheduled Conference call with Dresser Rand • Schedules Visit to Dresser Rand for Week 5 to have Design Review
Installation -Room Reinforcements/Structural Analysis • Electrical (Contractor) • HVAC (Contractor) • Water Supply (Contractor) • Rigger and Install (Contractor) • Noise and Vibration Control • Room Access/Safety • Installation Guide Setup and Configuration -Safety Training/Signage -Accessible Documentation -Sensor Connection - Computer and Software installation Safety -Eye/Ear Protection -Call out moving signs -Physical Buffers -Emergency Shutoffs -Training (Dresser-Rand) -Operation & Maintenance Manual Research Tool -Data Acquisition -Variable valve timing Mechanism -Analyses Teaching Interface -Data Acquisition -Custom Interface Per Class -Lab Manuals, Guides, Examples -Usability Tests -Staff Feedback Analyses DAQ -LabView Sensors -Documentation -Layout & Configuration -Analysis and Modeling -Custom Sensors -Analysis
Risks Concerns • The compressor drawings given are preliminary • Since team is not receiving compressor, actual tests can’t be done to collect data with acquisition unit