60 likes | 177 Views
NCR Broadband Wireless Network Design. August 25, 2005. ESF-2 NCR Data Interoperability Program Organization Chart. Network Design Project Scope. Spectrum Assessment Availability Cost Technology Assessment Compare Technologies performance/cost Recommend Technology/Spectrum Option
E N D
NCR Broadband Wireless Network Design August 25, 2005
Network Design Project Scope • Spectrum Assessment • Availability • Cost • Technology Assessment • Compare Technologies performance/cost • Recommend Technology/Spectrum Option • Network Preliminary Design • Targeted Sites and configuration. Description of Service provided. • Implementation Plan (Schedule, Resources, Cost) • RFP to vendors
RF Engineering Tool • GIS Data Bases • Terrain (DEM) • Land Usage Data (Morphology) • Building Data • Location • Identification (School, Fire Station) • Geo-coded data
Why..? • We need this data to • Correctly predict the network RF performance • Get a true requirement of number of sites • Accurately design and cost the network
Next Step • When can you provide the data? • We will provide the details of the format that we would prefer for the data