Activities of TOF @CERN(June 2008)

Activities of TOF @CERN(June 2008). Jinsook Kim, Yongwook Baek. Activities of TOF Commissioning @CERN(June 2008). Cleaning inside of L3 magnet – remove metals sensitive to magnetic field Installation of Grounding cables for power distribution racks.

ulf
Download Presentation

Activities of TOF @CERN(June 2008)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Activities of TOF @CERN(June 2008) Jinsook Kim, YongwookBaek

  2. Activities of TOFCommissioning @CERN(June 2008) • Cleaning inside of L3 magnet – remove metals sensitive to magnetic field • Installation of Grounding cables for power distribution racks

  3. Activities of TOFCommissioning @CERN(June 2008) • Participation to commissioning shift • Some problems with DC/DC convertors show up •  When L3 magnet is on

  4. Summary & Milestone • Pull out all DC/DC convertors • Repairing DC/DC convertor  4 DC/DC convertor per SM(total 72 convertors). • Put back repaired DC/DC convertors • Commissioning shift • ……