ECE 4006B Fall, 2002, Group 3, ROBIEL TECLEMICHAEL Progress Report Period (November 7-14, 2002). Progress:. Power Budget has been Verified Built a New Tx Board and the results are promising Performed Alignment Tolerance Tests on Rx. Big Obstacle!!!!!

urbana
Download Presentation

Power Budget has been Verified Built a New Tx Board and the results are promising

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECE 4006B Fall, 2002, Group 3, ROBIEL TECLEMICHAEL Progress Report Period (November 7-14, 2002) Progress: • Power Budget has been Verified • Built a New Tx Board and the results are promising • Performed Alignment Tolerance Tests on Rx. • Big Obstacle!!!!! The System Test Module was Down NO EYE Next Week: • Continue Working on Tx Board • Continue Alignment Tolerance Tests on other PD

  2. ECE 4006B Fall, 2002, Group 3, ROBIEL TECLEMICHAEL Progress Report Period (November 7-14, 2002) Tx Board Debugging • Built new board • Recalculated Rmod • Replaced 1K Rmod POT with 20K POT • Lowered VCSEL to less than 4mm from board • Cut off VCSEL leads • Next step: • Build and test new Tx • Potential Problem • Driving Imod too high could have effected the chip or VCSEL

  3. ECE 4006B Fall, 2002, Group 3, ROBIEL TECLEMICHAEL Progress Report Period (November 7-14, 2002 Preliminary Transmitter Board Test Results- PRBS7

  4. ECE 4006B Fall, 2002, Group 3, ROBIEL TECLEMICHAEL Progress Report Period (November 7-14, 2002

  5. Units: x10 microns

  6. ECE 4006B Fall, 2002, Group 3, ROBIEL TECLEMICHAEL Progress Report Period (November 7-14, 2002) Center of Measurement Sample 10 Points Eye for raised Z by 0.87mm

  7. Units: x10 microns

  8. Units: x10 microns