An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P2 events & perturbations ALICE Technical Coordination Meeting

  2. Overview ALICE Technical Coordination Meeting 02.08 : Beam interlock 07.08 : P2 18kV filter trip 08.08 : Perturbation PX24 cooling water 22.08 : Magnet trip

  3. 02.08 : Beam interlock ALICE Technical Coordination Meeting LHC beam was dumped twice (12:36 and 16:30) due to an interlock from the PX24 access system • Cause: • Water leaking from the SX2 roof infiltrated in the access system for PX24, triggering the access interlock • Impact for ALICE: • None (other than stop of beams) • Remarks: • The access interlock causes an emergency beam dump • Actions: • Emergency repair of roof • Longer term: assessment of status of roof

  4. 07.08 : P2 18kV filter trip ALICE Technical Coordination Meeting • Cause: • Problem on protection relay (identical to trip on 25.07) • Impact for ALICE: • Trip caused no perturbation • Switching on the filter (at 09:16) caused several perturbations • Again, mainly CAEN equipment is affected • Remarks: • Dipole and Solenoid were preventively ramped down before turn on of filter • As on 25.07, DAQ and HLT were left on (are usually switched off, SL gave green light without switching off) • Actions: • EL changed the suspect relay • Still to be decided: ALICE strategy at switch-on of this filter

  5. 08.08 : Perturbation PX24 cooling water ALICE Technical Coordination Meeting • As from ~9:00 perturbations on the cooling water temperature are observed • Mixed water, cooling the racks in CRs • Short (10 mins.) ‘spikes’ (2-3 degrees) in temperatures

  6. 08.08 : Perturbation PX24 cooling water ALICE Technical Coordination Meeting • Cause: • Failing servomotor on regulation valve in mixed water circuit • Impact for ALICE: • Virtually no effect on cooling efficiency • Remarks: • None • Actions: • CV changed servomotor on 11.08

  7. 22.08 : Magnet trip ALICE Technical Coordination Meeting • Cause: • Power glitch (06:51) tripped Dipole • Impact for ALICE: • None (no physics) at time of trip • Operator error in CCC tripped Solenoid when intending to ramp up Dipole • Remarks: • Also on other occasions (normal ramp for access), bad communication between CCC and ACR caused some confusion • Actions: • Again, remind the procedure with CCC and shift leaders • Longer term: implement software handshake

  8. ALICE Technical Coordination Meeting