1 / 16

Tammy Howard Accountability Services, NCDPI June 26, 2013

Tammy Howard Accountability Services, NCDPI June 26, 2013. Accountability and Testing Updates. Question of the Day # 1. When will students receive scores?. Standard Setting Timeline. Contractor constructs the developmental scale for grades 3-8 (June/July)

uyen
Download Presentation

Tammy Howard Accountability Services, NCDPI June 26, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tammy HowardAccountability Services, NCDPIJune 26, 2013 Accountability and Testing Updates

  2. Question of the Day # 1 When will students receive scores?

  3. Standard Setting Timeline • Contractor constructs the developmental scale for grades 3-8 (June/July) • Contractor conducts standard setting with panels of teachers (July/August) • Review standards, recommend to State Board of Education (September) • Publish READY Accountability report (October)

  4. Question of the Day # 2 How many students will be proficient?

  5. College and Career Readiness It is important to remember that we have raised expectations significantly in the 2012-13 school year. Claims in the Past: Grade-level Proficiency Claims in the Future: Career- and College-Ready

  6. Reading and Math Performance: 1992-93 to 2011-12 6

  7. Question of the Day # 3 What is the impact of ESEA flexibility?

  8. ESEA Flexibility • Schools not designated as having met or not met Adequate Yearly Progress • For each school, report Annual Measureable Objectives • Number of targets • Number met • Percent met • Flexibility waiver included state accountability model: goal was one accountable model 8

  9. ESEA Flexibility • Targeted subgroups’ minimum N = 30 • Previously was 40 • No Safe harbor • No Targeted Assistance School (TAS) Options • No AYP Growth Trajectory • No Averaging Participation Rates 9

  10. ESEA Flexibility Participation • The minimum participation rate for all subgroups will remain at 95%; however, consequences have changed: • Year 1: Letter to parents with plan for improving participation • Year 2: School labeled as “persistently low-participating school” and develops an intensive action plan • Year 3: non-participating students (to meet 95 %) counted as not-proficient 10

  11. Question of the Day # 4 How will the School Performance Grades be calculated?

  12. School Performance Grades • Since 2012 law, there have been multiple simulations • Input from Superintendents • House Bill • Senate Bill • Others • Details • ACT: percent of students who meet the UNC minimum for admission of 17 (1-36) • Growth • Weighting

  13. School Performance Grades • In Senate and House budget bills • Now in conference • http://www.ncleg.net/gascripts/confComm/confcommittee.pl?BillChamber=S&BillID=402&session=2013 • Will document when finalized

  14. Question of the Day # 5 What is new in testing in 2013-14 and beyond?

  15. Testing • Read to Achieve • End-of-grade test form administered at beginning of 3rd grade • End-of-grade retesting for end of 3rd grade administrations • ACT • HB 587: requires an alternate for ACT/PLAN

  16. Testing • Online Assessments for 2013-14: Same as 2012-13 • EOCs • Science- Grades 5 and 8 • NCEXTEND2 • NCEXTEND2: Not available in 2014-15 • SMARTER Balanced assessments designed to be more accessible for Students with Disabilities 16

More Related