ELECTRICAL UNIT JAIPUR. JURISDICTION. Electrical Works of Following Civil Units are Executed Bikaner Unit – I Bikaner Unit – II Kota Unit Alwar Unit Udaipur Unit Bharatpur Unit Jaipur Unit – III Jaipur Unit - IV. ORGANIZATIONAL STRUCTURE. Major Activities. HT / LT Lines Shifting
E N D
JURISDICTION Electrical Works of Following Civil Units are Executed • Bikaner Unit – I • Bikaner Unit – II • Kota Unit • Alwar Unit • Udaipur Unit • Bharatpur Unit • Jaipur Unit – III • Jaipur Unit - IV
Major Activities • HT / LT Lines Shifting • Street Light Works • Internal Electrical Installations • Air Conditioning • Evaporative Air Cooling • Fire Fighting and Fire Alarm System • Electrical Sub-Station • Computer Networking • Passengers Elevators • Power Fencing • Medical Gas Supply System ( Oxygen, Vacuum, Nitrus Oxide) • E.P.B.X. System
ENERGY SAVINGS MEASURES • CFL fixtures were used in all Buildings. • Air Cooling machine with cellulose pads and centrifugal blowers with high energy efficiency. • High efficiency screw chillers are used for Air Conditioners which saves nearly 25% electricity. • Solar Water Heating System Solar Street Lights • Traffic Lights Blinkers with Solar Panels • Stickers are pasted in buildings keep aware about energy savings.
Major Electrical Projects • Satelite Hospital Gangauri Bazar Jaipur • Charak Bhawan Jaipur • Research Hospital Pratap Nagar Jaipur • Police Housing • Rajasthan Technical University Kota • Electrification Work on ROB’s • Maharaja Gangasingh University Bikaner • Engineering College Banswara ( Proposed ) • Power Fencing at Sajjangarh Biological Park Udaipur
Satelite Hospital Gangauri Bazar Jaipur • Medical Gas Supply System: 40 Lacs • Operation Theatre Lights : 25 Lacs • Fire Fighting and Fire Alarm system : 18 Lacs • Campus Lighting Work : 5 Lacs • Passenger Bed Elevators : 44 lacs • Internal Electrification : 60 Lacs • Electrical Sub-Station : 10 Lacs • D G Set : 22 Lacs
Charak Bhawan, Jaipur • Internal Electrification Work. : 60 lacs • Passenger Bed Elevators : 35 Lacs • Electrical Sub station : 21 Lacs • Air Conditioning Work : 5 Lacs • Air Cooling Work : 40 Lacs • DG Set : 8 Lacs • EPBX System : 5 Lacs
Research Hospital Pratap Nagar Jaipur • Substation, LT Panel & Cabling work • Fire Fighting and Fire Detection system • D G Set • Passenger Elevator • Air Conditioning Work • Internal Electrification Work
Police Housing • Electrification in Police Housing Jaipur : 105 Lacs • Electrification in Police Housing at Udaipur : 95 Lacs • Electrification in Police Housing at Bikaner : 280 Lacs • Electrification in Police Housing at Kota : 40 Lacs
Rajasthan Technical University at Kota • Internal Electrification work in Examination Block : 16 Lacs • Electrical Substation Work : 37 Lacs • Air conditioning Work : 18 Lacs • Internal Electrification work in Vice Chancellor’s Secteriate : 33 Lacs • External Electrification Work : 22 Lacs
Line Shifting Works • Shifting of LT / HT Line at Ramganj Mandi ROB : 30 Lacs • Shifting of LT / HT Line at Dholpur ROB : 25 Lacs
Maharaja Ganga Singh University at Bikaner • Internal Electrification work : 30 Lacs • Electrical Substation Work : 10 Lacs • External Electrification Work : 20 Lacs
Details of Police Housing Scheme S.No. Name of Place Nos. of Quarters LSQ USQ 1. Jaipur 236 44 2. Udaipur 344 40 3. Bikaner 374 60 4. Kota 60 16