An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work status • Ecloud mitigation • Should be ready to review (both options mature) • New scraper system • MD tests planned, concept now well-developed • New TL protection TCDIs • FLUKA studies completed (?), new concept defined? • Extraction protection devices • Not seriously started • Beam dump improvements • Not seriously started • New MKE kickers • In progress • New BGI monitor • No results from 2012?

  2. Work status • NEW BSRT • Not started • New injection matching monitor • Only partially commissioned in LHC • New faster MKP • Conceptual study made - being checked • ZS improvements • Minor improvements only in pipeline (no issues in 2012) • New HBW feedback • Progressing well • High energy orbit correction • Not yet started • Need for other impedance reduction measures • Studies to start on 800 MHz TWC, others?

More Related