1 / 31

MGNREGS-AP Convergence with other schemes

MGNREGS-AP Convergence with other schemes. Dept. of Rural Development Government of Andhra Pradesh. MGNREGS – Efforts at Convergence. Nirmal Bharat Abhiyaan (NBA) & SERP Tribal Welfare Dept. Panchayat Raj Dept. Irrigation Dept. Agriculture Dept. Horticulture Dept. Forest Dept.

veta
Download Presentation

MGNREGS-AP Convergence with other schemes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MGNREGS-APConvergence with other schemes Dept. of Rural Development Government of Andhra Pradesh

  2. MGNREGS – Efforts at Convergence • Nirmal Bharat Abhiyaan (NBA) & SERP • Tribal Welfare Dept. • Panchayat Raj Dept. • Irrigation Dept. • Agriculture Dept. • Horticulture Dept. • Forest Dept. • Integrated Watershed Management Program (IWMP). • Indira JalaPrabha (IJP).

  3. Individual Household Latrines (IHHL): NBA & SERP • Women SHGs identify the eligible beneficiaries in villages • The list of beneficiaries finalized after the approval of Gram Sabha • Each IHHL unit is taken as one work • Estimates are generated in Mandal Computer Centers • Technical support to IHHLs in weaker section housing colonies by State Housing Corporation. • Payment is software enabled and is done seemlessly through a single window to the beneficiary as follows : • Unit cost of IHHL of size 3’x4’ Feet – Rs. 10,000/- • EGS share – Rs. 4,500/- • NBA share – Rs. 4,600/- • Beneficiary contribution – Rs. 900/-

  4. IHHL: Convergence with NBA & SERP • Wage payments are made to the beneficiaries based on the muster • Material payments are made to beneficiary / GP / supplier • Centralized account is maintained for both EGS & NBA funds and drawn through eFMS • Final Payment is made on uploading of the completed IHHL photograph through GPS coordinates • Administrative Sanctions given for taking up 16.5 lakh IHHLs at an estimated cost is Rs. 742.5 Cr. • As on 2nd Sept, 2.22 lakh IHHLs are in progress and 1.4 lakhs completed. • Expenditure incurred is Rs. 186.5 Cr. • (NBA funding Rs 77 Cr.,EGS funding Rs. 109.4Cr.)

  5. BNRGSK: Convergence with Panchayat Raj Dept. & Tribal Welfare Dept. • Funds through MGNREGS • Technical Support by Panchayat Raj & Tribal Welfare Engineers • 3% admin charges allowable on the total expenditure • Exclusive Departmental Computer Centers • Payments by Executive Engineers through eFMS • Works taken up: • BNRGSK – Mandal level buildings • BNRGSK – GP level buildings • Rural Connectivity to Unconnected habitations • CC roads & drains in SC / ST localities • Internal roads in SC / ST colonies in convergence with MP Lads /MLA CDP funds / GP funds or other government funds

  6. Status of works: • Rural Connectivity: • 51395 works taken-up with an estimated cost of Rs 3403.94 Cr. • 37888 works completed& 13507 works are in progress by incurring an expenditure of Rs. 2211 Cr. • 28881 kms of road formed benefitting 19293 habitations. • BNRGSK Gram Panchayat Building Works: • 4639 works taken up with an estimated cost of Rs.487.17Crores • 2831 works completed & 1808 works are in progress by incurring an expenditure of Rs. 309 Cr. • BNRGSK Mandal Building Works: • 1029 works works taken-up with an estimated cost of Rs.257.42 Cr • 573 works completed & 456 works in progress by incurring an expenditure incurred Rs.152.5 Cr.

  7. Status of works: (cont) • Comprehensive Development of SC/ST Colonies Project • 13727 works taken up taken up with an estimated cost of Rs 1894.6 Cr • 760 works completed & 12967 works are in progress with an expenditure of Rs.455.5 Cr and 1113 kms length of road. • Internal roads with CC drains ( CC carpeting with matching fund) • 2355 works taken-up with an estimated cost of Rs.139.7 Cr • 433 works completed & 1922 works in progress by incurring an expenditure of Rs. 42.5 Cr. and 106 kms of road formed

  8. Convergence with Irrigation Dept. • Works identification by Gram Sabha • Execution by RD Dept. • Technical approvals by Irrigation Dept. Engineers. • Wage payments to wageseekers through musters • Material payments to GP/suppliers • Types of works taken up: • Excavating of the peripheral trench, Bund plantation along the boundary of MI tank in foreshore • Revetment to bund • Repairs to surplus weir • Repairs to sluice • Restoration of Irrigation Tanks • Breach closing to MI tank • Construction of Cattle Ramps in MI tanks

  9. Convergence with Irrigation Dept. • 18131 Minor Irrigation tanks were restored including de-silting by incurring an expenditure of Rs. 3485 Cr. till last year. • 25448 works were identified with an estimated cost of Rs. 1422 Cr for the FY 2013-14. • Rs. 121 Cr has been spent on the MI tanks works during the year.

  10. Agriculture & Allied activities • Identification by Gram Sabha • Execution by RD Dept. • Wage payments to wageseekers through musters • Material payments to beneficiaries/GP/suppliers • Types of works taken up: • NADEP compost • Compost pits • Perennial fodder development • Rising of silvipasture with subabul plantations • Cattle drinking water troughs • Fish production & fish rearing ponds

  11. Status of Works

  12. Convergence with Horticulture dept. • 100% assistance including maintenance for 3 years. • Target group – SCs & STs small & marginal farmers of BPL families • The maximum extent to each farmer up to 5 Acres • Beneficiary selection in Gram Sabha • Convergence with NHM & APMIP • Financial Assistance to implement the MIP Installation : AP-MIP Share - 70% MGNREGS Share - 30%

  13. Convergence with Horticulture dept. • Execution by RD department • Dry Land Horticulture encouraged • Specie selection and plant material selection by the beneficiaries • Wage Payments to wage seekers • Material payments to beneficiaries • Monthly maintenance charges paid to beneficiaries for surviving plants @ Rs. 15/- per plant per month

  14. Convergence with Horticulture dept. A. Assistance to the Beneficiaries: • To provide 100 % assistance to beneficiary farmers for three years. Horticulture crops proposed : Mango SapotaJamoon Sweet orange Cashew Crusted Apple TamarindAcid lime Coconut Oil palm Guava B. Achievements • Till date horticulture plantation taken up in 702794 acres covering 321000 beneficiaries, with an expenditure of Rs. 622. 7 Cr

  15. MGV Nurseries & Bund Planting • Under drought Proofing category • Raising seedlings and tree plantations along the boundary of beneficiaries lands • Beneficiaries : SC, ST, SF and MF category farmers. • Seedlings Supply : For two years during 2011-12 and 2012-13 seasons the Forest Department produced and supplied the seedlings • Current year, seedlings (Teak & Red Sandals) raised by DWMAs. • Package of benefits : Maintenance costs @ Rs. 50/-, Rs. 30/- and Rs. 21/- per survived plant during 1st , 2nd and 3rd year to the beneficiary. • A beneficiary is permitted max. 800 plants to plant on his field bunds. • So far 13.50 crore seedlings were planted in 10 lakh acres belonging to 9.60 lakh farmers

  16. Convergence with IWMP • Complete saturation mode based Detailed Project Reports (DPR) planning and convergence plan for MGNREGS. • Segregation of NRM based Projects in between IWMP & MG-NREGS in IWMP villages. • 15 out of 26 Projects of works i.e watershed related works are taken up by IWMP as well as NREGS staff in IWMP villages

  17. Convergence with MGNREGS under NRM • Coverage of SC, ST small,& marginal farmers under MGNREGS • Farmers other than SC, ST, small & marginal farmers are covered under IWMP • Construction of water harvesting structures in all farmers lands

  18. Convergence with MGNREGS under NRM Ground Water Recharge, Drainage Line Treatment, Afforestation, Fodder development ,Common Property resources Projects Others – Flood control, Roads etc Land Development & Fodder Dev. Projects Dry Land Horticulture Land Dev. works Watershed Computer Centre Mandal Computer Centre Watershed Computer Centre Mandal Computer Centre NREGS Funds IWMP FUNDS NREGS FUNDS

  19. Progress of NRM Amount Rs in Crores

  20. INDIRA JALA PRABHA – MGNREGA – RIDF • Objective • To irrigate 10 lakh acres of land • Of Poorest of Poor households – SC/ST • Major anti-poverty initiative • GW to be a community asset • Equity in access of groundwater • Convergence with MGNREGS to improve asset quality • Not only GW exploitation, but recharge. • Optimum utilization of ground water through MIP • Scope - Project Cost

  21. Works under I J P. Works with NABARD funds. • Purchase of motors • Energisation • Cement troughs for water storage for Borewells with low yield • Lift Irrigation • Any other work requiring use of machinery on case to case basis. • Name board. Works with MGNREGS funds • Irrigation source for SC/STs • Bore well recharge structures • MIP • Agro – forestry • Dry land Horticulture • Any other work from the existing projects under MGNREGS

  22. IJP - Progress

  23. Convergence: Key Challenges • Identification of works every year & creation of durable assets • Leveraging technical and domain expertise desirable for creation of durable assets • Resistance by Departments due to difference in execution norms - leading to low level of active participation • Execution of technical works within MGNREGS framework by EGS functionaries is a difficult task • For optimum leveraging - Separation of material component completely and allowing material intensive works to be executed as per Departmental norms.

  24. Thank You!! Dept. of Rural Development, Government of Andhra Pradesh

More Related