1 / 6

Beechwood Baptist Church Mt. Olive, Alabama

Beechwood Baptist Church Mt. Olive, Alabama. B L A C K D E S I G N A R C H I T E C T U R E Birmingham, Alabama. Beechwood Baptist Church Mt. Olive, Alabama. B L A C K D E S I G N A R C H I T E C T U R E Birmingham, Alabama. Master Planning Studies. COVERED DRIVE- THRU.

vian
Download Presentation

Beechwood Baptist Church Mt. Olive, Alabama

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Beechwood Baptist Church Mt. Olive, Alabama B L A C K D E S I G N A R C H I T E C T U R E Birmingham, Alabama

  2. Beechwood Baptist ChurchMt. Olive, Alabama B L A C K D E S I G N A R C H I T E C T U R E Birmingham, Alabama Master Planning Studies COVERED DRIVE- THRU • Master Plan – Phasing Sequence • Phase 1 –Preschool/Children’s building w/ Activity Room • Two story, 13,363 SF • First Floor • 6 Preschool rooms with shared toilets, capacity 72 • Control desk/Welcome Center • Resource/Workroom/Kitchenette • Activity room, 56 x 44 (seats 183-230 @ tables) • Equipment storage for activity room • Table and chair storage • ADA restrooms • Covered Drive through • Additional parking • Enlarged kitchen with outside entrance • Second Floor • 6 rooms for Grades 1-6, capacity 122 • Children’s Worship, capacity 50 • Resource/workroom, kitchenette • Office • ADA restrooms • Storage for Sanctuary • Gathering Area for Choir • Remodel • Remove a few walls in present Preschool area to create 5 classrooms for Youth, capacity 74 • Office for Youth Minister in present Preschool area • Remove walls on 2nd floor present Youth area to create larger Youth Worship room, and 2 classrooms. • Phase 2 – Extension of Preschool/Children’s building • Two story • Step 1 – Move Youth to Activity Room • Remove present Preschool/Youth Building • Step 2 – Extend Preschool/Children’s building, two-story (7216 SF) • 4 Preschool rooms, on 1st floor, capacity 60 • Control desk/welcome center • Office for Preschool Director/ Kindergarten Director/Day Care Director • 6 Youth classrooms on 2nd floor, capacity 84 • (Youth classrooms become grade 1-6 rooms when phase 3 is completed) • Phase 3 – Family Life Center • Two story, 18,000 SF • High School size basketball court with spectator seating, 7,000 SF (Doubles as fellowship hall, capacity 460) • Kitchen and pantry • Office, game room, arts/crafts, exercise room, general purpose room • Walking track on 2nd level • Youth classrooms on 2nd level, capacity 150 (2,000 SF) • Phase 4 – Remodel present Sanctuary • Step 1 – Move Worship to Family Life Center gym, capacity 500-550 • Step 2 – Remodel present Sanctuary • Chapel, capacity 250 • Adult classrooms, capacity 140 in 8 rooms • Phase 5 Build new Worship Center • Seating for 750 persons • Fellowship Mall • Church Offices • Music Suite • ADA Restrooms • Additional Parking HVAC NURSING KITCHENETTE PRE 2 CLASSROOM CREEPER & TODDLERS BED BABIES 57’-8” CONTROL DESK ACTIVITY AREA NEW PARKING ACTIVITY ROOM EQUP. PRE 3 CLASSROOM PRE 4 CLASSROOM PRE 5 CLASSROOM PARKING PRESCHOOL/ YOUTH PRESCHOOL/ CHILDREN UNPAVED PARKING WOMEN’S RESTROOM TABLE & CHAIR STORAGE PHASE 1 ACTIVITY ROOM ADULT/ SENIORS MEN’S RESTROOM RETAINING WALL SANCTUARY NEW PARKING KITCHEN HVAC/ MECHANICAL First Floor Plan Phase 1 Site Plan 125’-5” STO. GRADE 5 GRADE 6 CHILDREN’S WORSHIP & GRADE 2 OPEN TO ACTIVITY ROOM BELOW STORAGE KITCHENETTE PHASE 3 GRADE 3 GRADE 4 GRADE 1 & CHOIR GATHERING OFFICE WORKROOM FAMILY LIFE CENTER WOMEN’S RESTROOM ADMIN. STORAGE PARKING FELLOWSHIP MALL MEN’S RESTROOM RETAINING WALL PLAYGROUND PARKING PHASE 5 Second Floor Plan 750 SEAT SANCTUARY PHASE 2 CHILDREN PRESCHOOL/ CHILDREN PHASE 1 ACTIVITY ROOM CHOIR SUITE LEGEND ADULT/ SENIORS PHASE 4 Preschool Control CHAPEL/ ADULT PARKING Children Storage Resource Activity Room Master Site Plan Restrooms Kitchenette

  3. Master Planning Studies Phase 1 Site Plan • Master Plan – Phasing Sequence • Phase 1 –Preschool/Children’s Building w/ Activity Room • Two story, 13,363 SF • First Floor • 6 Preschool rooms with shared toilets, capacity 72 • Control desk/Welcome Center • Resource/Workroom/Kitchenette • Activity room, 56 x 44 (seats 183-230 @ tables) • Equipment storage for activity room • Table and chair storage • ADA restrooms • Covered Drive through • Additional parking • Enlarged kitchen with outside entrance • Second Floor • 6 rooms for Grades 1-6, capacity 122 • Children’s Worship, capacity 50 • Resource/workroom, kitchenette • Office • ADA restrooms • Storage for Sanctuary • Gathering Area for Choir • Remodel • Remove a few walls in present Preschool area to create 5 classrooms for Youth, capacity 74 • Office for Youth Minister in present Preschool area • Remove walls on 2nd floor present Youth area to create larger Youth Worship room, and 2 classrooms. NEW PARKING PRESCHOOL/ YOUTH PRESCHOOL/ CHILDREN UNPAVEDPARKING PHASE 1 ACTIVITY ROOM ADULT/ SENIORS PARKING SANCTUARY NEW PARKING

  4. Master Planning Studies Master Site Plan • Master Plan – Phasing Sequence • Phase 2 – Extension of Preschool/Children’s building • Two story • Step 1 – Move Youth to Activity Room • Remove present Preschool/Youth Building • Step 2 – Extend Preschool/Children’s building, two-story (7216 SF) • 4 Preschool rooms, on 1st floor, capacity 60 • Control desk/welcome center • Office for Preschool Director/ Kindergarten Director/Day Care Director • 6 Youth classrooms on 2nd floor, capacity 84 • (Youth classrooms become grade 1-6 rooms when phase 3 is completed) • Phase 3 – Family Life Center • Two story, 18,000 SF • High School size basketball court with spectator seating, 7,000 SF (Doubles as fellowship hall, capacity 460) • Kitchen and pantry • Office, game room, arts/crafts, exercise room, general purpose room • Walking track on 2nd level • Youth classrooms on 2nd level, capacity 150 (2,000 SF) • Phase 4 – Remodel present Sanctuary • Step 1 – Move Worship to Family Life Center gym, capacity 500-550 • Step 2 – Remodel present Sanctuary • Chapel, capacity 250 • Adult classrooms, capacity 140 in 8 rooms • Phase 5 Build new Worship Center • Seating for 750 persons • Fellowship Mall • Church Offices • Music Suite • ADA Restrooms • Additional Parking PHASE 3 FAMILY LIFE CENTER ADMIN. FELLOWSHIP MALL PARKING PLAYGROUND PARKING PHASE 5 PHASE 2 750 SEAT SANCTUARY CHILDREN/ YOUTH PRESCHOOL/ CHILDREN PHASE 1 ACTIVITY ROOM CHOIR SUITE ADULT/ SENIORS PHASE 4 CHAPEL/ ADULT PARKING

  5. COVERED DRIVE- THRU HVAC NURSING KITCHENETTE PRE 2 CLASSROOM CREEPER & TODDLERS BED BABIES ACTIVITY AREA CONTROL DESK PRE 3 CLASSROOM PRE 5 CLASSROOM ACTIVITY ROOM EQUP. PRE 4 CLASSROOM WOMEN’S RESTROOM TABLE & CHAIR STORAGE MEN’S RESTROOM RETAINING WALL First Floor Plan HVAC/ MECHANICAL KITCHEN

  6. STO. CHILDREN’S WORSHIP & GRADE 2 GRADE 5 GRADE 6 OPEN TO ACTIVITY ROOM BELOW STORAGE KITCHENETTE GRADE 1 & CHOIR GATHERING GRADE 3 GRADE 4 OFFICE WORKROOM WOMEN’S RESTROOM STORAGE MEN’S RESTROOM RETAINING WALL Second Floor Plan

More Related