110 likes | 224 Views
RPC BARREL P. Vitulo per Bari/Frascati/Napoli/Pavia. Outline: Dettaglio Richieste 2009 per Sezioni Totale Richieste 2009 per RPC BARREL e confronto con Luglio 2008 Proposta Distribuzione Servizi MoA per RPC BARREL Dettaglio richieste MOF-B Richieste aggiuntive 2008
E N D
RPC BARREL P. Vitulo per Bari/Frascati/Napoli/Pavia • Outline: • Dettaglio Richieste 2009 per Sezioni • Totale Richieste 2009 per RPC BARREL e confronto con Luglio 2008 • Proposta Distribuzione Servizi MoA per RPC BARREL • Dettaglio richieste MOF-B • Richieste aggiuntive 2008 • Piano di intervento e spare • Closed Loop @ P5 • GIF Roma 21/7/2008 CMS Referees
Dettaglio richieste 2009 BARI Roma 21/7/2008 CMS Referees
Dettaglio richieste 2009 FRASCATI Roma 21/7/2008 CMS Referees
Dettaglio richieste 2009 NAPOLI Roma 21/7/2008 CMS Referees
Dettaglio richieste 2009 PAVIA Roma 21/7/2008 CMS Referees
Riassunto richieste 2009 e confronto con il 2008 (Luglio) n.b. Il confronto è fatto a Luglio 2008 Roma 21/7/2008 CMS Referees
- Distribuzione Servizi MoA per sezione - Rapporto servizi Italia/CERN Roma 21/7/2008 CMS Referees
Da Tabella RPC documento ufficiale MoA da cui è stato estratto solo il BARREL Roma 21/7/2008 CMS Referees
Dettaglio richieste MOF-B 2009 Roma 21/7/2008 CMS Referees
RPC BARREL Richieste aggiuntive 2008 Roma 21/7/2008 CMS Referees
Wheel sec chamber problem spare severity access Piano di intervento e Spare W-2 7 Rb1in-right Leak broken output T-connector No avail Medium , Can operate To be removed and repaired on place W-1 12 RB4/2000-right ID266-357 Leak External connections ? 0.02mbar/min. No avail Low , Can operate First check connection on wheel. Otherwise to be removed and need spare 6 RB3 right ID 1, 12 Leak External connections? 0.04mbar/min. 1 spare with serv.avail Low, Can operate First check connection on wheel. Otherwise to be removed and need one spare 10 RB4/2500 right ID 124,128 Leak, External connections? 0.2 mbar/min No avail Medium, Can operate First check connection on wheel. Otherwise to be removed and need spare 6 RB4-1500 right without service LV digital cable in short No need High, not in operation To be removed and repaired on place 8 W-1/RB3+ Distribution board. FEB threshold control ok Low, in operation To be pulled out to replace the board W0 8 RB3 left ID 6,2 Leak no pressure No avail Medium in operation in gas ricirculation To be removed. Need spare 1 RB1out left ID 408 Leak 0.05 mbar/min avail Low, in operation, in gas ricirculation To be removed. 2 RB3 right ID 24, 287 Leak 0.250 mbar/min 1 spare with service avail Medium, in operation , in gas ricirculation To be removed. Need one spare 8 RB2out Distribution board, FEB Threshold control ok Low in operation To be pulled out to replace the board W+2 8 RB4+ right ID 150 Leak broken input T-connector No avail High, not in operation To be removed and repaired on place 5 RB1out Distribution board. FEB threshold control ok Low, in operation To be pulled out to replace board