1 / 5

D. Attié, P. Colas, M. Riallot LCTPC WP Meeting #82 7 May 2009

News from Micromegas modules. D. Attié, P. Colas, M. Riallot LCTPC WP Meeting #82 7 May 2009. Back from GEM to Micromegas. We dismounted the GEM module and mounted the new Micromegas module with resistive ink and the new electronics enable_shaping =false option

Download Presentation

D. Attié, P. Colas, M. Riallot LCTPC WP Meeting #82 7 May 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. News from Micromegas modules D. Attié, P. Colas, M. Riallot LCTPC WP Meeting #82 7 May 2009 Micromegas module

  2. Back from GEM to Micromegas • We dismounted the GEM module and mounted the new Micromegas module with resistive ink and the new electronics enable_shaping=false option • We also tightened some loose screws suppressing leaks • We installed the updated software for the new electronics and tested it Micromegas module

  3. Cosmics with new detector & electronics Micromegas module

  4. Signal from new electronics (cosmics) • Signal at the central pad showing • the exponential tale characteristic • of no shaping • Signal at the neighboring pad Micromegas module

  5. Schedule for next beam test • TPC Analysis Jamboree 2009: May 11th -14th (no one from DESY?) • Plans for data taking: • May 18th-20th: fiber and laser installation and commissioning, flush with gas • May 21th-24th: commissioning of detector with cosmics at B=0 • May 25th start data taking at B=1T • Around May 28th : change module to C-loaded kapton • June 2nd: end of data taking Micromegas module

More Related