The Rivage Site corner of Ridge, Kelly and Calumet at the Falls Bridge. Background. Site is owned by the RDA Bought to make sure development was good for the community Not a large site – 1.6 acres RDA has issued a Request for Proposals – public process due Oct. 3

vinson
Download Presentation

The Rivage Site corner of Ridge, Kelly and Calumet at the Falls Bridge

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Rivage Site corner of Ridge, Kelly and Calumet at the Falls Bridge

  2. Background • Site is owned by the RDA • Bought to make sure development was good for the community • Not a large site – 1.6 acres • RDA has issued a Request for Proposals – public process due Oct. 3 • At the request of the EFDC, Selection Committee will include a Community Representative from the EFCC

  3. The EFDC has worked with the RDA to have a community process • The EFDC will inform the community about the process (such as this meeting, articles in the Fallser). • The EFCC will have a representative to the Selection Committee. • The RDA will eliminate any application that does not meet minimum selection criteria and Eligible Projects will be presented at a meeting of the EFCC – tentatively scheduled for Oct. 17, 18, if more than three developers submit proposals. • Community members will give input to developers at the meeting and to the community representative • The community representative will participate in the recommendation of the selection of the developer. • If there are zoning changes, they will come before the Community

  4. RFP requires the developer to do things beyond a normal development – usually the end of a zoning process and not beginning • The Developer will pay for Phase IV of East Falls Reconnects to the River: widen Ridge Avenue and Calumet Street along the site. • The Developer must address the community’s Controls and Guidelines

  5. Rivage Development Controls and Guidelines • Controls: those elements that must be met • Guidelines: those elements that are encouraged to best serve the site and the surrounding community. Proposals will be evaluated as to the extent they meet both controls and guidelines.

  6. Site Constraints

  7. Control: A plan for parking, service and loading “The developer must provide a plan for parking, service and loading, including access and egress, that mitigates any impact on surrounding streets.” • EF Overlay requires: Retail: 4 spaces for every 1000 sq.ft. For restaurants: 1 space for every 4 seats. • Zoning requires: New residential must have one space per unit.

  8. Aldi’s in West Philly – not mixed use. 3.6 spaces per 1000 sq.ft.

  9. 9 stories with grocery – subsidized by U of P

  10. Specialized Markets • Big supermarket (Acme, ShopRite) does not fit on the site and won’t come here • Smaller or specialized markets (Fresh Grocer, Whole Foods, Trader Joe’s) in Philadelphia usually do not meet our retail parking requirements • Smaller market alone is not feasible

  11. Whole Foods in Spring Garden2.5 cars per 1000 sq.ft.

  12. Trader Joe’s on Market StreetRatio: 2.9 spaces per 1000 sq.ft.

  13. Traffic Controls • No drive through uses allowed • No access on Kelly Drive • Loading on site • No back up delivery trucks

  14. Control: Kelly DriveBuffer in 25 foot setback • A landscape design should be created within the 25' setback between Kelly Drive and any structure.- landscaped berm or stormwater management

  15. Control: build public streets • Widen Calumet for left turn onto Kelly Drive • Widen Ridge for on street parking, with turning lane for the am rush hour.

  16. Widen road for stacking 25 foot set-back Landscaped buffer or berm widen road for parking and a.m. turning Kelly Drive

  17. Guideline: Height Variance – set back • For developers seeking a height or building length variance above the overlay standard: • Overlay: 25 foot minimum height and 35 foot maximum height at the set-back line. One foot higher allowed for every foot back with a Maximum height shall continue to be 60 feet. • Any additional height should be concentrated along the Ridge Avenue, Calumet Street frontages or the new proposed western elevation. • Variations in cornice line are encouraged

  18. When it is done right, it can work: Lively storefronts and housing

  19. Example: Variation in Cornice Line

  20. Guideline: Gateways and Architecture • “The development should be considered and designed as a gateway to the East Falls Community. The corners of Kelly & Calumet & Ridge offer exceptional possibilities to express this idea and the developer is encouraged to consider that notion.” • “Use of high quality materials .”

  21. Gateway architectureincludes variation in cornice line

  22. Gateway with Cafe

  23. Green Building Incorporate green building techniques

  24. Make it pedestrian friendly • Public space on Calumet Street to draw people info the neighbhrood • Streetscape and signage according to East Falls Reconnects to the Rver • Good ground floor uses

  25. Next Steps • Proposals come in Oct. 3 • Evaluated for basic compliance • Community meetings in October • Developer Selection by December