1 / 8

Escalation Model

Escalation Model . Supplier Quality WIMS N5 – Version 8.0. Escalation Model – Supplier Quality. Exit. 4. Escalation Level. 3. Escalation Level. 2. Escalation Level. 1. Performers. Escalation Model – Supplier Quality. Escalation Model – Supplier Quality.

vivi
Download Presentation

Escalation Model

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Escalation Model Supplier Quality WIMS N5 – Version 8.0

  2. Escalation Model – Supplier Quality Exit 4 Escalation Level 3 Escalation Level 2 EscalationLevel 1 Performers

  3. Escalation Model – Supplier Quality

  4. Escalation Model – Supplier Quality

  5. Escalation Model – Supplier Quality

  6. Escalation Model – Supplier Quality

  7. Escalation Model – Supplier Quality • Criteria for De-Escalation: • PPM-targets are reached • No repeated defects • Other quality targets reached • (if existing, e.g. related customer claims, field quality etc.) • Delivery performance criteria fulfilled (in case of logistics escalation) • Good 8D performance (reaction time, quality of content) • No big variety of different defect types (instable process!), • even if small reject quantities • and • All criteria need to be met • Fulfillment must be proven for minimum duration of 2 consecutive months (or longer if requested by Webasto)

  8. Internal working advices • PPM Target Tracking Sheet can be used as an option already in level 1 • Extended 8D reports should be requested at least for repeated defects • Escalation letters will be signed as follows: • Level 1: Head of plant logistics + Head of plant quality • Level 2: Supplier owner (purchasing) + Supplier development engineer • Level 3: Head of purchasing + Head of Supplier development

More Related