API 17P TASK GROUP. January 15, 2013. BACKGROUND. NWI Initiated in 2006 API 17 P / ISO 13628-15 new recommended practice Effort is being led by API task group Draft relied heavily on specifications from a number of operators. SCOPE. production and injection manifolds
E N D
API 17PTASK GROUP January 15, 2013
BACKGROUND • NWI Initiated in 2006 • API 17 P / ISO 13628-15 new recommended practice • Effort is being led by API task group • Draft relied heavily on specifications from a number of operators
SCOPE • production and injection manifolds • modular and integrated single satellite and multiwell templates • subsea processing and subsea boosting stations • flowline riser bases and export riser bases (FRB, ERB) • pipeline end manifolds (PLEM) • pipeline end terminations (PLET) • T- and Y-connections • subsea isolation valve (SSIV) • subsea controls and distribution structures • other subsea structures • protection structures associated with the above.
CURRENT STATUS • Committee Draft version has been competed and passed • Completed April 2009 • 24 pages of comments • Draft International Standard version was sent to technical writer for final formatting • Draft International Standard version has been competed and accepted • Completed March 2010 • 26 pages of comments (all have been addressed) • Structural steel section added (updated) • Final Draft International Standard version has been competed and submitted for Ballot
CURRENT STATUS • Result of FDIS ballot was approved Q3 2011 • ISO 13628-15 has been released • API adopt back ballot closed November 22, 2011 • 15 affirmative votes • 2 negative votes (1 operator, 1 hardware supplier) • 3 technical comments • API recirculation ballot opened August 29, 2012
CURRENT STATUS • API recirculation ballot closed September 26, 2012 (affirmed) • 14 affirmative votes • 5 negative votes • Document has been published with editorial comments included • New work item needed to start next revision
NEXT STEPS • Start next revision • Major work in clause 7 (materials) • Reconsider comments from adopt back ballot
OPEN ISSUES • Need new work item