SUBLEMBANGAN (KAWASAN FOKUS)@ LEMBANGAN. DAERAH : KUBANG PASU LAPORAN KEMAJUAN DAN STATUS PELAKSANAAN STATUS SEHINGGA : 15 MAC 2011. PETA TABURAN ADUAN AWAM DALAM SUBLEMBAGAN. Banjir Sumber Air & Alam Sekitar Saliran Bandar Sungai Dan Koridor

wauna
Download Presentation

SUBLEMBANGAN (KAWASAN FOKUS)@ LEMBANGAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SUBLEMBANGAN (KAWASAN FOKUS)@ LEMBANGAN DAERAH : KUBANG PASU LAPORAN KEMAJUAN DAN STATUS PELAKSANAAN STATUS SEHINGGA: 15 MAC 2011

  2. PETA TABURAN ADUAN AWAM DALAM SUBLEMBAGAN Banjir Sumber Air & AlamSekitar Saliran Bandar Sungai Dan Koridor Pengairan & SaliranPertanian Pantai

  3. Isu-isuberbangkit CabarandanKekangan PENJELASAN ISU DAN MASALAH Pembangunan pesatbandarJitra yang menyumbangpertambahankadaralirlebihkurang (671.88 cuses) tidakmampuditampungolehSg. Keronco yang sempitdancetekmenyebabkanbanjir. Tanah sepanjangsungaidiberihakmilik, tidakmenpunyairizab, sukarjalankankerjapenyelenggaraan. Tigapembentungsediaadatidakmampumenampungalirandan air berpatahbalik (Back flow) berlakubanjirkilat. Masalahbanjir di bangkitdalammesyuarattindakandaerah , dailogdenganpendudukdanwakilrakyat. SikappendudukmembuangsampahsarapkedalamSg. Keronco. • Ketiadaanrizab. sukarjalankankerja- kerjapenyelenggaraan. • Pembangunan terlalurapatdengantebingSg. Keronco • SikappendudukmembuangsapahsarapkedalamSg. Keronco • Masalahutiliti yang merentassungai yang menyempitkansaluran • JPS Daerah KubangPasukurangkakitangandanperuntukan.

  4. PEMILIHAN SUBLEMBANGAN • JUSTIFIKASI PEMILIHAN SUBLEMBANGAN (PESTEL) • P – Politic • E – Economic • S – Social • T – Technology • E – Environmental • L – Legal CONTOH JUSTIFIKASI:- Jumlahaduanterbanyakadalahdi sub lembanganini Sungai KeroncosistemsaliranutamabagibandarJitra. Pembangunan pesatdankepadatanpenduduk yang tinggi Masalah-masalah yang ketara- sangaisempitdancetek, ketidakmanpupembentungsediaada, sampahsarap, setinggandalamrezabsungaidanketiadaanrezabsungai KrIteria Justifikasipemilihansublembanganberdasarkan PESTEL ataupertimbanganJurutera Daerah

  5. Masalahdisublembangan yang dipilih • PendudukdisepajangSg. Keronco • Sek Men KebJitradanSekJenisKebCina Chung Hwa c) Mini Stadium Jitra d) JalanSek Men KebJitra/JalanPondokHj. Wan Leh e) PusatKesihatanJitra Siapa yang merasaiimpak

  6. AnalisisAduandalamSublembanganSg. Keronco KrIteria Data asasdalambentukjadual (data terkinidan data historical) AnalisisAduan (Bar chart /histrogram /pai chart) RumusanAduan RumusanAduan Majoritiaduanadalahberkenaansungaiiaitu8.2%. Yang ke-3 tertinggiadalahberkaitansaliranbandar. Aspekhakisanpantaidanpengairansalirantidakberkaitanuntukdaerahini. Nota: Laporan mengikut kreativiti masing-masing

  7. SUB 1 : SG. KERONCO @ SG.KEDAH DESCRIBE

  8. KomponenDescribe; • Apakahisudanmasalahdalam sub-lembangan? • Apaatausiapakah yang merasaiimpakmasalahini? • Siapakah yang bertanggungjawab? • Apa yang telahdilakukandimasadahulu? • Adakahmasalahinibermusimatauberpanjangan?

  9. ISU-ISU DALAM SUBLEMBANGAN MasalahBanjir Masalahbanjirberlaku di kawasanperumahansepanjangSg. Keronco, JalandanSek Men KebJitra, SekJenisKebCina Chung Hwa, Mini Stadium Jitra. Aduandaripada stakeholder danpenduduktempatan Isuberlanjutansejak15 tahundanseringbanjirketikahujanlebat Menggangusistemperhubunganawamdanjaringanrangkaianlebuhraya Mengakibatkankesesakanlalulintassemasajalandinaiki air Mengakibatkankerugianhartabendadanperniagaan

  10. PELAN LOKASI KawasantadahandanjajaranSg. Keroncosertakawasanseringdilandabanjir TMN DARUL AMAN, BUNGA RAYA SEK MEN JITRA & MINI STADIUM RUMAH SETINGGAN

  11. KeadaanSg. Keronco Yang SempitdanCetek

  12. SUB 1 : SG. KERONCO @ SG.KEDAH EXPLAIN

  13. KomponenExplain – memperjelasdanmemperincikan; • Bagaimanamasalahinibermula? • Apakahdiapunca-puncautama? • Bilakahiamenjadikritikal? • Siapa yang perludirujuk? • Siapakahpihakberkepentingan (stakeholder)? • Masalahmana yang perluditanganidahulu? • Apakah data ataupeta yang diperlukan? • Bagaimanakeberkesanansistemsaliransemasa?

  14. MasalahUtama - Banjir Punca-puncaBanjirdikawasaniniialah: Pembetungsediaada yang merentasiSg. Keroncoditigatempatjalanutamatidakmanpumenampungkadaralirsebanyaklebihkurang 671.88 cuses. SaizSg. Keroncosemakinsempitdancetekakibattidakadarizabsukarmenjalankankerja – kerjapenyelenggaraan. Sg. KeroncomerupakansalurankeluardansistemsaliranutamabagibandarJitra yang membangunpesat yang menyebabkanpertambahan air larian. Binaanditebingdanmasalahutiliti yang merentasSg. Keroncotelahmenyepitsaluran. Sikappenduduklebihselesamembuangsampahsarapkedalamsungai.

  15. Pembetung yang keciltidakdapatmenampungpertambahan air Di jalanSek Men KebJitra/Mini Stadium, Jitra

  16. KeadaanSg. Keronco Yang Sempit,Binaan Di atasTebingdanTiadaRizabSukarJalankanKerjaPenyelenggaran

  17. KeadaanSg. Keronco Yang Sempit,Binaan Di atasTebingdanTiadaRizabSukarJalankanKerjaPenyelenggaran

  18. SUB 1 : SG. KERONCO @ SG.KEDAH EVALUATE

  19. Komponen Evaluate - menilai kaedah penyelesaian; • Kenalpasti keperluan maklumat. • Dapatkan feedback dari stakeholder. • Apakah dia opsyen penyelesaian yang ada? • Analisa kejuruteraan. • Tetapkan skop kerja penyelesaian masalah • Tentukan keutamaan tindakan.

  20. INVENTORI MAKLUMAT Kajian Sistem saliran sedia ada ‘KERJA – KERJA MENAIKTARAF SG. KERONCO, JITRA, DAERAH KUBANG PASU, KEDAH DARUL AMAN. oleh JuruteraPerundingBersatupadatahun2003 PembentungdiJalanKelubi, JalanSek Men JitradanjalanPondokHj. Wan LehdibinaolehJKR dan MDKP. Roadside drain JalanTaman Rasa Sayang, JlnKelubi, JlnSek Men JitradanJlnPondokHj. Wan Leh. yang menyempitkansaluran Maklumat GIS Rumusan Petatopo 1:50,000 dan 1;10 000 Peta Daerah KubangPasu PetabandarayaJitra Petasublembangansungai Petakawasanbanjir Hujan 100thn ARI bolehmenyebabkanbanjirsetinggi1.2m disekitarsub LembanganSungai Keronco.

  21. ANALISIS KEUTAMAAN TINDAKAN PENYELESAIAN UNTUK BANJIR DI SEPANJANG SG. KERONCO

  22. CadanganNaiktarafKaeadahTembokPenahan “Wallgurd System”

  23. SUB 1 : SG. KERONCO @ SG.KEDAH PRESCRIBE

  24. KomponenPrescribe - pengesyoranstrategi/kaedahpelaksanaanpenyelesaian; • Tetapkankaedahpelaksanaankerjapenyelesaian • Adakanmesyuarat stakeholder • Terangkanstrategipenyelesaianmasalah • Jadualkanpelaksanaan • Jelaskanhasil yang dijangka • Kenalpastiperanan stakeholder dandapatkankomitmen • Mulakankerjajangkapendek • Jadualkanpertemuan stakeholder secaraberkala

  25. TINDAKAN JANGKA PENDEK TINDAKAN JANGKA PENDEK JangkaPendek \ Kerja yang bolehdilaksanakansegeradanmempunyaiimpakserta-merta (1 – 6 bulan)

  26. TINDAKAN JANGKA SEDERHANA JangkaSederhana \ Kerja yang bolehdilaksanakandalamtempohpertengahan (6 hingga 24 bulan)

  27. TINDAKAN JANGKA PANJANG JangkaPanjang \ Kerja yang memerlukanperancangan , pengumpulan data dananalis yang kompleks (2 tahunkeatas)

  28. TINDAKAN SETERUSNYA Setelahselesaisatuisu, Jurutera Daerah perlumenjalankanproses DEEP iniuntukisu-isu yang lain sublembanganberkenaan. Proses DEEP untuksublembangan-sublembangan lain bolehlahdilaksanakansecaraserentak.