1 / 20

The MICE Tracker

The MICE Tracker. Introduction Tracker Design and Construction Readout Firmware QA Process & Results Cosmic Ray Data Taking First Results Next Steps. Introduction.

Download Presentation

The MICE Tracker

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The MICE Tracker • Introduction • Tracker Design and Construction • Readout • Firmware • QA Process & Results • Cosmic Ray Data Taking • First Results • Next Steps M.Ellis - UKNF Meeting - 15th September 2008

  2. Introduction • The MICE tracker is responsible for position and momentum measurement of the beam going into and coming out of the cooling channel. • From this information and the time, extrapolated from the TOF chambers, the emittance of the beam can be determined. • The trackers are the closest detectors to the cooling channel, and so need to provide an accurate, efficient measurement of the muons in the presence of a potentially high background of X-rays from the RF cavities. • The technology chosen is scintillating fibres, readout by Visible Light Photon Counters. M.Ellis - UKNF Meeting - 15th September 2008

  3. Tracker Design • Each of the two trackers consist of five stations (that measure the position of a particle). • These five stations are placed inside a uniform 4T solenoid. • Each station is made from 3 planes of scintillating fibre, oriented at 120º to each other, so as to give a redundant measurement of the position. • The planes are doublet layers of 350 mm diameter scintillating fibre from Kuraray. • There are over 1400 fibres per plane, read out in groups of seven (neighbouring fibres are ganged together into one clear fibre for read out). M.Ellis - UKNF Meeting - 15th September 2008

  4. Tracker Design M.Ellis - UKNF Meeting - 15th September 2008

  5. Tracker Construction M.Ellis - UKNF Meeting - 15th September 2008

  6. Completed Tracker 1 M.Ellis - UKNF Meeting - 15th September 2008

  7. Readout • Very small fibres pose a problem for the light yield. • The solution we have chosen is to use Visible Light Photon Counters, which have high gain, low noise and very high QE (85-95%). • With this readout, the expected light yield is between 10 and 11 PE for muons in MICE. • VLPC cassettes from the D0 experiment are used, and the front end electronics boards are also D0’s AFE IIt boards, with modified firmware for MICE. • The complete data from a 1 ms spill is transferred via LVDS cables from the front end boards to VME memory modules, which will be read out once per spill. M.Ellis - UKNF Meeting - 15th September 2008

  8. Readout – VLPC System

  9. VLPC Performance M.Ellis - UKNF Meeting - 15th September 2008

  10. Electronics M.Ellis - UKNF Meeting - 15th September 2008

  11. Firmware • New firmware for MICE required for both the AFEIIt and VLSB boards. • First versions of both suitable for running in MICE are being used for the cosmic ray test. • The AFEIIt firmware is currently limited to a maximum of about 150 muons in our 1 ms spill. • Work is ongoing in the US to increase the maximum rate through the implementation of zero suppression, multi-level buffering and some other enhancements to reduce the total time taken to digitise a trigger. • A first version of the zero suppression upgrade has been successfully tested at IIT and will hopefully be available for use in the cosmic ray rig soon. M.Ellis - UKNF Meeting - 15th September 2008

  12. QA Process • Single VLPC cassette in the prototype MICE cryostat setup at Imperial College. • Radioactive source scanned over each station and boards readout with a special self-triggered mode that was developed for the QA. • Light yield measured for all 3 stations for each location of the source. • Due to rate and time constraints, we were unable to take data with the source over every channel, however the positions were chosen to sample a reasonable fraction of the active area of each station. M.Ellis - UKNF Meeting - 15th September 2008

  13. QA Rig M.Ellis - UKNF Meeting - 15th September 2008

  14. QA Results M.Ellis - UKNF Meeting - 15th September 2008

  15. Cosmic Ray Data Taking • Complete tracker 1 is now setup in R8 at RAL. • Two scintillators made for a test beam at KEK in 2005 are used to provide a trigger (three new scintillators have been sent from Fermilab and should increase the trigger rate). • Tracker, waveguides, VLPC system and electronics are all the same equipment that will be used in MICE. • Readout is currently with the Fermilab designed Visual Basic code, will soon move to the DATE DAQ system that is used in MICE. • Analysis with the MICE software system (G4MICE). M.Ellis - UKNF Meeting - 15th September 2008

  16. Cosmic Ray Setup

  17. Track Residuals Expect: 0.431 mm M.Ellis - UKNF Meeting - 15th September 2008

  18. Light Yield M.Ellis - UKNF Meeting - 15th September 2008

  19. Next Steps • Sort out low light yield on waveguides 20 and 30. • Tracker 2 construction and cosmic ray testing. • Firmware development and testing. • Installation of tracks in the MICE hall once their solenoids arrive. M.Ellis - UKNF Meeting - 15th September 2008

  20. Finally – 100 Events with 5 point Tracks: M.Ellis - UKNF Meeting - 15th September 2008

More Related