An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Reconstruction of RAW from July 2009 injection test ALICE Offline July 16, 2009

  2. Injection test in Offline • Registration of RAW in AliEn – OK • Shuttle – OK • Some of the detector preprocessors – NOK • Out of step update of DAs with respect to the AliRoot version in the Shuttle • The release procedure is known! The detector groups should be very mindful of compatibility issues

  3. Reconstruction of the RAW data Total volume – 7.8GB, 120 files

  4. Reconstruction of RAW (2) • Run lists received for ZDC, MuTr, FMD • What about the other detectors? • Total list of detectors (green are the ones requesting reconstruction) • V0, T0, SPD, SDD, ZDC, FMD, MuTr • Reconsturction will be done with AliRoot v4-15-Rev02

  5. Reconstruction of RAW (3) • Several last minute fixes have been submitted (today) • These will be put in AliRoot • Revision 02 will be ready tomorrow • Reconstruction will run afterwards • All (requested) new conditions obejcts are put in OCDB

  6. Procedure follow-up • Shuttle messages must be followed! • SRCs, this must be a task of the respective detector shifter • Run quality flags in DAQ are routinely ignored • Per detector/global – detector shifters and shift leader should put the info in the logbook • The injection test served as a catalyzer for offline code fixes (no comment here)