1 / 16

A doua intalnire anuala a Federatiei Romane Tier-2

RO-LCG 2008. A doua intalnire anuala a Federatiei Romane Tier-2. Mihnea Dulea IFIN-HH. "U" Business Center, 05.12.2008. RO-LCG 2008.

Download Presentation

A doua intalnire anuala a Federatiei Romane Tier-2

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RO-LCG 2008 A doua intalnire anuala a Federatiei Romane Tier-2 Mihnea Dulea IFIN-HH "U" Business Center, 05.12.2008 05.12.08

  2. RO-LCG 2008 • A doua intalnire a comunitatii LCG din Romania, reuneste reprezentanti ai Infrastructurii Nationale Grid, fizicieni particulisti, specialisti IT, administratori si utilizatori de site-uri grid. • Desfasurata in anul comisionarii acceleratorului LHC, conferinta isi propune sa: • evalueze gradul de pregatire a RO-LCG pentru participarea la etapa achizitiei de date • defineasca pozitia actuala a RO-LCG in cadrul Infrastructurii Nationale Grid • prezinte rezultatele obtinute in ultimul an de activitate • stabileasca strategia de dezvoltare imediata si pe termen lung • ofere prilejul comunitatii grid de a schimba informatii privind tehnologia grid • ofere prilejul impartasirii experientei site-urilor avansate site-urilor noi • atraga noi parteneri si grupuri de utilizatori in RO-LCG • discute perspectivele dezvoltarii grid-ului in Romania • prezinte activitatile proiectului EGEE III si aspectele de interoperabilitate la nivel national 05.12.08

  3. Membrii RO-LCG • IFIN-HH • NIHAM(ALICE / AliEn / gLite)- Claudiu Schiaua; • RO-02-NIPNE(ATLAS, HONE)- Gabriel Stoicea; • RO-07-NIPNE(ALICE, ATLAS, LHCb, HONE, SEE, SEEGRID)- Mihai Ciubancan; • RO-11-NIPNE(LHCb) - Eduard Pauna. • ISS • ISS(ALICE / AliEn), RO-13-ISS- Sorin Zgura; • ICI • RO-12-ICI(LHCb) - Ana Bildea • UPB • RO-03-UPB, (ALICE) - Alex Herisanu • ITIM-Cluj • RO-14-ITIM(ATLAS)- Felix Farcas 05.12.08 RO-LCG 2008, M. Dulea

  4. Infrastructura de retea Topologie: 8 site-uri grid (5 in productie si 3 in teste), conectate prin intermediul retelei provider-ului national RoEduNet la reteaua europeana GEANT (iesire din tara la 10Gbps) 05.12.08 RO-LCG 2008, M. Dulea

  5. Monitorizarea resurselor si activitatii Topologie: 8 site-uri grid (5 in productie si 3 in teste), conectate prin intermediul retelei provider-ului national RoEduNet la reteaua europeana GEANT (iesire din tara la 10Gbps) 05.12.08 RO-LCG 2008, M. Dulea

  6. Evolutia grid-ului RO in context universal • CRONOLOGIE • 2001 Consiliul CERN aproba proiectul LCG • 2002 • prima etapa a proiectului LCG (2002-2005) • prima aplicatie Grid din RO (ALICE-GRID, NIHAM, IFIN-HH) • consortiul RoGRID • 2004: • EGEE, SEE-GRID • RO-01-ICI certificat in EGEE • 2005-2008: a doua etapa a proiectului LCG • certificare RO-02-NIPNE in EGEE • initiata colaborarea WLCG • 2006 • certificare RO- 07 / 11 -NIPNE in EGEE • Federatia Romana Tier-2 si SINDEGRID • 2007-2010: EGI Design Study Project • 2008 • RO-03-UPB certificat in EGEE • RO-12-ICI, RO-13-ISS, RO-14-ITIM • comisionarea LHC (sept.) • 2009 (apr.) LHC in productie • 2010 (apr.) EGI 05.12.08 RO-LCG 2008, M. Dulea

  7. Productia pe discipline EGEE: HEP 76% RO: LCG 95% alte VO 5% EGEE: LCG 65% alte VO 35% Concluzie Ponderea productiei LCG in RO este superioara celei la nivel mondial 05.12.08 RO-LCG 2008, M. Dulea

  8. Ponderea RO-LCG in productia nationala RO: VO HEP 98,1% alte VO 1,9% RO: site-uri RO-LCG 98,6% alte site-uri 1,4% 05.12.08 RO-LCG 2008, M. Dulea

  9. Angajamentul in resurse, conform MoU Angajamentul actual al RO-LCG pentru perioada 2008-2013, privind puterea de calcul CPU (in unitati kSI2k), capacitatea de stocare pe disc (in TB) si, in verde, procentul pe care il reprezinta angajamentul CPU al RO-LCG din capacitatea totala de procesare promisa de centrele Tier-2 din WLCG 05.12.08 RO-LCG 2008, M. Dulea

  10. Pozitia RO-LCG in ierarhia WLCG RO-LCG pe locul 12 in WLCG Pozitia 12-14 (in prima 1/3 din 43 listate) Romania pe locul 12 (1,4%) RO-LCG pe locul 9 ca Tier-2 (1.9%) 05.12.08 RO-LCG 2008, M. Dulea

  11. Contributia RO-LCG la WLCG: resurse, disponibilitate, incredere Procentul de utilizarea a resurselor de procesare promise de RO-LCG pentru 2008, comparat cu procentul de folosire al tuturor resurselor promise de centrele Tier-2 Coeficientii de disponibilitate si de incredere ai RO-LCG in ultimele 12 luni (nivelul minim al serviciului prevazut in MoU este de 95% disponibilitate) Valori medii anuale realizate de RO-LCG: incredere 77%, disponibilitate 75%, resurse 66% (practic egal cu procentul mediu anual WLCG) Probleme: oscilatii mari ale procentului de utilizare a resurselor; nerealizarea nivelului minimal de disponibilitate 05.12.08 RO-LCG 2008, M. Dulea

  12. Utilizarea resurselor pe experimente Utilizarea medie a resurselor de catre RO-LCG si centrele Tier-2 pe cele trei VO-uri de interes Comparatia denota folosirea mai eficienta a resurselor RO-LCG pe experimentul ALICE; explicarea diferentei necesita considerarea unei multitudini de factori, locali si externi, modelele de calcul diferite ale VO-urilor, etc. 05.12.08 RO-LCG 2008, M. Dulea

  13. Cauze identificate / masuri necesare • probleme de retea la nivel regional, • intreruperi pe termen lung ale curentului electric cu interventii intarziate, • organizarea slaba a comunicariiintre unele site-uri grid, • lipsa temporara de personal calificat, • absenta accidentala a versiunilor mai vechi de software, • un dezastru provocat de defectarea instalatiei de climatizare, • repartitia ineficienta a resurselor pe cele trei experimente care a neglijat nivelele lor reale de activitate, • etc. • cresterea vitezei de reactie la rezolvarea incidentelor, • imbunatatirea infrastructurii suport (retea electrica, climatizare, retea date), • cresterea comunicarii / coordonarii intre site-uri, • training personal operare / administrare, • monitorizarea / contorizarea permanenta a resurselor si serviciilor, • fair sharing al resurselor adaptat la conditiile concrete, • DISCUTAREA ACESTOR PROBLEMECU PRILEJUL RO-LCG 2008 05.12.08 RO-LCG 2008, M. Dulea

  14. (Propunere de) proiect: CONDEGRID Asigurarea mijloacelor pentru dezvoltarea, management-ul si exploatarea sistemului national de resurse si servicii dedicateLCG in cadrul RO-LCG Propune activitati specifice pentru a rezolva si a preveni acest tip de incidente, pentru a imbunatati disponibilitatea si stabilitatea serviciilor grid, productivitatea globala a RO-LCG Program Capacitati Modul 3 (CERN) • OBIECTIVE • O1: Realizarea angajamentului de resurse hardware si imbunatatirea eficientei folosirii resurselor grid; • O2: Realizarea nivelelor minime de servicii prevazute in MoU pentru Tier-2 ; • O3: Imbunatatirea monitorizarii si contorizarii resurselor si serviciilor din RO-LCG; • O4: Dezvoltarea si modernizarea infrastructurii de retea a RO-LCG; • O5: Asigurarea suportului pentru administrarea, operarea si intretinerea centrelor grid; • O6: Imbunatatirea managementului RO-LCG si a comunicarii in interiorul Consortiului; • O7: Implementarea de tehnologii avansate pentru imbunatatirea infrastructurii RO-LCG; • O8: Asigurarea integrarii RO-LCG instructurile Initiativei Nationale Grid; • O9: Diseminarea activitatilor RO-LCG si a rezultatelor proiectului (workshop 2009, conferinta internationala 2010) 05.12.08 RO-LCG 2008, M. Dulea

  15. RO-LCG 2009 2009 este primul an de productie la LHC Obiectivele WLCG suntcorelate cu planificarea achizitiei de date: - imbunatatirea globala a disponibilitatii site-urilor, - satisfacerea capacitatilor de resurse planificate cerute de experimente, - upgrade-ul middleware-ului si al serviciilor, - pregatirea pentru viitoarea tranzitie la suportul infrastructurii WLCG prin intermediul contributieiinitiativelor nationale grid. Obiectivele imediate RO-LCG: - asigurarea resurselor planificate pentru 2009 pana in aprilie, - trecerea noilor site-uri grid din perioada de teste in regim de productie - imbunatatirea disponibilitatii retelei de date, inclusiv prin asigurarea redundantei, - upgrade-ul software-ului LCG pe site-uri (trecerea la SL 5, CREAM CE), - imbunatatirea managementului, coordonarii si comunicarii in RO-LCG - studiu de fezabilitate privind viitoarea integrare a infrastructurii RO-LCG in Initiativa Nationala Grid 05.12.08 RO-LCG 2008, M. Dulea

  16. RO-LCG 2008 VA MULTUMESC PENTRU ATENTIE ! 05.12.08 RO-LCG 2008, M. Dulea

More Related