An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEKNO EKONOMI BANGUNAN

  2. MayjendSungkono Children Hospital

  3. Batas Tapak Depan : 10 meter Sampingkirikanan : 3 meter (separuhbadanjalan) Belakang : 3 meter RegulasiTapak KLB : 1500%, jumlahinidiambil paling maksimum agar investasipadalahantermaksimalkan. KDB : 50%:50% untukrumahsakitlebihbaikmemperbanyak area openspace. 154 m 167m 167m 153m KLB = 1500% x LuasLahan = 1500% x 25303.02 meter2 = 3.79.548 meter2 KDB= 50% x LuasLahan = 50% x 25303.02 meter2 = 12651.51 meter2

  4. DATA UMUM • NamaProyek : Children Hospital • Lokasi : Jl. MayjendSungkonokecamatanWonokromo, Surabaya tengah – Jawatimur • LuasTapak : 25.303,02m2 • Hargatanah : Rp12.000.000,00 /m2 • KDB : 50%  12651.51 m2 • KLB : 1500%  379545.3 m2 • Jumlahlantai : 25 lantai • Efisiensilantai : hotel 85% makarumahsakitefisiensinyalebihrendahuntukmemenuhistandarrumahsakit 90% • Luasnetto : 6 /m2/org • Tinggilt-lt : 4.32 meter • Luaslantaitipikal : 2.177 m2 • Sukubunga : 10%/tahun • Perubahannilaiuangterhadapwaktu : 3% • Modal pinjaman : modal sendiri:3 • Masapelunasankredit : 20 tahun • Umurekonomisproyek : 50 tahun • Pajakperseroan : 45% • Depresiasi : 3% • Faktorkekosongangedung : 3-5%

  5. L= P (2a – 3 mN ) n = 5% (2 x 1485 – 3. 31. N) 25 • 2 a” 2 x 6 • = 5%.2970. 25 – 5 % x 3 x 31. N x 25 • 12 • =309.375 - 9.68 N • m= a. n. w. P • 300. a” • = 1485 x 25 x 30 x 5 % • 300 x 6 • = 31 orang kecepatanlift rumah sakit 150 – 210 m/menit. Jumlah Lift L = MN L = P (2a – 3 mN ) n = 300mN 2 a” T 309.375 - 9.68 N = 37.5 N N = 6,5 = 7 lift @ 31 orang Round trip time T = 248 dtk Waktutunggu minimum w = T : N = 248 : 7 = 35 detik > w min = 35 dtk < w max = 55 dtk • E= 0,746 x 31 x 3,5 = 80,9 kW

  6. Biaya Investasi • Biaya Bangunan Rumah sakit Ibu dan Anak + Hotel

  7. Biaya Investasi • Biaya Bangunan Rumah sakit Ibu dan Anak + Hotel

  8. Biaya investasi total (Biaya rumah sakit x upgrade sarana = 200%) + biaya hotel Rp 155.569.960.000 (200%) + Rp 533.835.232.000 Rp 466.709.880.000 + Rp 533.835.232.000 Rp 1.000.545.112.000

  9. PEMBIAYAAN PROYEK (FV) FV = I (1+I)t FV = Rp1.773.457.752.006 (1 + 6,5) 2 FV = Rp1.773.457.752.006 (1,134225) FV = Rp2.011.101.090.775 INVESTASI MODAL SENDIRI = 30% x Rp2.011.101.090.775 = Rp 603.330.327.233 INVESTASI MODAL PINJAMAN = 70% x Rp2.011.101.090.775 = Rp1.407.770.763.543 Pengeluaran proyek Lg = 554.236.246.800 (1+i/2)3 L3 = 554.236.246.800 (1+0.05)3 L3 = Rp 641.597.735.201,85 0,10 (1+0,10)15x 641597735201,85 – 641597735201,85 (1+ 0,1)15 – 1 15 0,1315 x 641597735201,85 – 0,0667 x 641597735201,85 0,064833 x 64159773201,85 = Rp 4.159.670.575,99 Depresiasi 2% x 297.000.000.000 Rp 59.400.000.000 PendapatanProyek Denganjumlahtempattidur (tt) 112, danmempunyai BOR 80%. Biayatetap total setahunRp. 25 Juta. Biayavariabel (tdktetap) setahunRp. 15 Juta. RawatinapterdiridariKls VVIP = 2 tt; VIP = 10 tt; I = 12 tt; II = 8 ttdan III = 8 tt. Berapabiaya unit aktualnya Penyelesaian,VVIP TC = TFC + TVCTC = 25 Jt + 15 JtTC = 40 Jt Capacity = 2 x 320 = 640(Q) = 640/48 x 50%(Q) = 7 jadi, UCa = TC / Q = 40 Jt / 7 = Rp 5.714.286,- UCn = TFC / Capacity + TVC / QUCn = 25 Jt / 640 + 15 Jt / 7UCn = 39062.5 + 2142857 = Rp 2.181.920,- VIP TC = TFC + TVCTC = 25 Jt + 15 JtTC = 40 Jt Capacity = 10 x 320 = 3200(Q) = 3200/48 x 50%(Q) = 33.3 jadi, UCa = TC / Q = 40 Jt / 33.3 = Rp1.201.201,- UCn = TFC / Capacity + TVC / QUCn = 25 Jt / 3200 + 15 Jt / 33.3UCn = 7812.5 + 450450 = Rp 458.263,- Total = Rp 8.670.204 Total 1 tahun = Rp 2.774.465.280 I Capacity = 12 x 320 = 3840(Q) = 3840/48 x 50%(Q) = 40 jadi, UCa = TC / Q = 40 Jt / 40 = Rp 1.000.000,- UCn = TFC / Capacity + TVC / QUCn = 25 Jt / 3840 + 15 Jt / 40UCn = 6510 + 375000 = Rp 381.510,- II&III Capacity = 16 x 320 = 5120(Q) = 5120/48 x 50%(Q) = 53 jadi, UCa = TC / Q = 40 Jt / 53 = Rp 754.717,- UCn = TFC / Capacity + TVC / QUCn = 25 Jt / 5120 + 15 Jt / 53UCn = 4883 + 283019 = Rp 287.902,-

  10. Pendapatan dari Hotel Pendapatan Kotor Rp 95.977.505.280

  11. Jangka Balik Modal