60 likes | 70 Views
Planned Mitigations at the ESS Test Stand 2. Wolfgang Hees TS2 Machine Section Coordinator. 2019-05-21. TS2 mitigations. installation of a fast relieve valve installation of a quench detection system (RF). installation of a fast relieve valve. installation of a fast relieve valve.
E N D
Planned Mitigations at the ESS Test Stand 2 Wolfgang HeesTS2 Machine Section Coordinator 2019-05-21
TS2 mitigations installation of a fast relieve valve installation of a quench detection system (RF)
installation of a fast relievevalve M0 (MECCTD) Series
installation of a fast relievevalve M0 (MECCTD) SVC91: Velan, SCRG 02 ZD 197 F DN25x20 on-off valve triggered by PT03
fast relievevalve SCV91 PT03 0-10 V In control rack