Energy Program Dan Cassidy Manager, Energy & Sustainability J&J Workplace Solutions
Johnson & JohnsonThe world's most comprehensive and broadly based manufacturer of health care products, as well as a provider of related services, for the Consumer, Pharmaceutical, and Medical Devices & Diagnostics markets. • More than 250 operating companies • More than 115,000 employees worldwide • Selling products in more than 175 countries • 3 Segments: Pharmaceuticals, Medical Devices & Diagnostics, and Consumer • 2012 Sales $67.5 Billion
1943Our Credo Robert Wood Johnson crafted Our Credo long before anyone ever heard the terms “sustainability” or “corporate social responsibility.”
1990-2010Sustainability Reporting Environmental Leadership • 1990 First Pollution Prevention goals Sustainability Goals • 1993 First Sustainability report • 2000 Next Generation goals • 2005 Healthy Planet 2010 goals • 2010 Healthy Future 2015 goals Johnson & Johnson Environmental Report, 1993
Healthy Future 2015 Healthy People Healthy Planet Healthy Business • Building on our legacy in safeguarding the planet • Reduce the environmental impact of our operations • Increase the sustainable design of our products • Enhancing outcome measurement in philanthropy • Partnering with suppliers that embrace sustainability • Committing to enhanced transparency and accessing the power of external collaboration • Research and development for neglected diseases • Affordable access to medicines • Advancing community wellness • Fostering the most engaged, health-conscious and safe employees in the world
Reduce Facility Impacts 2015 Goals: • 20% absolute reduction in facility CO2 emissions by 2020 • Increase onsite clean-technology energy capacity to 50 MW • 20% decrease in fleet CO2 emissions per mile • 10% absolute reduction total waste disposal & water consumption Janssen Raritan site 1,870 kW completed December 29th 2011
CO2 Reduction Strategy – Existing Buildings • Energy Efficiency - Best Practices • On-site co/tri-generation, fuel cells • On-site renewables: solar, wind, biomass, landfill gas, geothermal • Green energy procurement (PPA’s)
Worldwide CO2 Results Worldwide Results 2012 Goal vs. 2010: -4%CO2 Emissions 1990-2012 vs. Sales2012 Actual vs. 2010: -6% Sales [Billion US$] CO2 Emissions [ Thousand Metric Tons] Net Emissions Sales Offsets
2012 J&J ENERGY PROFILE – WORLDWIDE DATA FLOOR SPACE CO2 EMISSIONS Million SQ.FT. Thousand Metric Tons +38% +12% ENERGY USAGE ENERGY COST +181% Million US$ Trillion BTU’s +31%
Commitment to Clean Energy • Currently 45 MW installed or in-progress • 34 Solar • 10 Cogeneration • 3 Biomass • 3 Geothermal • 2 Wind • Project pipeline of over 14MW • 2 Wind • 9 Solar • 2 Cogeneration 3,000kW Tri-Generation Limerick, Ireland Two 500 kW wood chip boilers Cork, Ireland 500 kW PV array, New Brunswick, NJ
Commitment to Sustainable Buildings LEED Sustainable Building Policy: All new construction and major renovations of J&J facilities will be LEED certified. Select Examples of Our 15 LEED Buildings Worldwide:
Policy for Sustainable Design and Construction - Revised 2012 • Targets higher Energy & Atmosphere scores • Forces evaluation of new technologies • Mandates use of technologies with 10 year or better paybacks • Focus on right-sizing equipment • Added smaller buildings to policy scope
CO2 Capital Funding ProcessAugust, 2004 • $40 million per year in capital relief for projects worldwide • Projects provide good financial returns: 15% Internal Rate of Return • Projects must provide meaningful CO2 reduction Criteria:
CO2 Projects Funding Program • 146 projects approved • $313.6 million US approved • Average IRR: 19.3% • 100 Projects Complete • 145,887 metric tons CO2/yr
Energy Efficiency – Recent examples HVAC Upgrade, Raynham, MA Variable speed air compressor, J&J Mumbai Lighting upgrade HCS, Memphis Chiller upgrade Vistakon, Jacksonville Boiler upgrade J&J UK Gas Conversion J&J Thailand
Drive Implementation through Programs • J&J Energy Best Practices • Project Cold (Chilled water optimization) • Project Hot (Boiler system optimization) • Project Relight
Coming Soon… Project Air (compressed air retrofits) Project Aeolus (Reduce air changes in HVAC) Project Hydro (water reductions) Project Clean (Improvements in CIP’s) Project Lab (Lab hood energy reduction) Project You (Awareness & behaviour change) Project Zero (Carbon neutral sites)
Cogeneration Projects Janssen R&D, Springhouse PA 3800 kW MWM Janssen, Raritan NJ 3000 kW GE Lifescan, Inverness UK 229 kW Mercedes DePuy, Cork Ireland 402 kW MAN