Benefits and Impacts Obsolescence Reduction Risk Reduction Safety Improvement Cost Reduction

Water Recycling System. Area(s) of Significant Benefit Safety Performance Sustainability Operations Infrastructure . Description Recycling water is of prime importance for long duration spaceflight including Shuttle emergency operations

Download Presentation

Benefits and Impacts Obsolescence Reduction Risk Reduction Safety Improvement Cost Reduction

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Water Recycling System Area(s) of Significant Benefit Safety Performance Sustainability Operations Infrastructure • Description • Recycling water is of prime importance for long duration spaceflight including Shuttle emergency operations • Examine new low weight and power methods for water purification that eliminate impact of VOCs • Compare the performance of these new systems with current RO system based on weight, power, reliability, and lifetime Technologies and Capabilities • Evaluate new water separation and purification methods that do not use expendable materials, and then select the most efficient system, e.g. • Water purification with hydrated salts provides a convent method to eliminate VOCs. • Electro-Dialysis-Reversal provides an alternate method of purification. • Vacuum Distillation provides with a cold plate provides another method of purification. Benefits and Impacts Obsolescence Reduction Risk Reduction Safety Improvement Cost Reduction Process Improvement Other (Ultra-High Operations Improvement Reliability) Performance Enhancement • POC, Cost, Schedule and Maturity • TRL 3, Water Purification System • POC: Clyde Parrish, KSC, (321) 867-8763 • If a source of water is provided to the Shuttle, then one of the resources for survival always available. • Reduction in Category 1 Failure Rate of 0.5%

  2. Water Recycling System • Total Project Costs: $ 5.1M • Obsolescence & Feasibility: $ 0.3 M • Formulation: $ 0.8 M • Implementation: $ 4.0 M • Project Submitted By: Clyde Parrish and Dale Lueck, KSC • Note: Supplemental Information attached in MS Word document