An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Facility Master Plan “Listen” “Understand” “Create” Master Plan Presentation August 18, 2011

  2. Table of Contents • Demographics (con’t) • Projections • Attendance Areas • Utilization of School Facilities • Community Presentations • Special Schools • Recommendations • Criteria • Prioritization • Master Facility Plan Summary • Volume 2 • CEFPI Assessments • Educational Specifications • Energy Benchmarking Data • Round Lake Strategic Plan • Round Lake Facility Task Force Report • 2003 10-Year Safety Survey Report 2 Volume 1 Acknowledgements Executive Summary • Introduction • Background Information • Goals and Objectives • Strategic Plan Summary • Facilities Summary • Educational Facilities • Administrative Facilities • Facility Assessment • Overview • Educational and Physical Adequacy • Educational Spatial Assessment • System Assessment • Academic Curriculum • Grade Level Curriculum Alignment • Teaching and Learning Strategic Planning Principals • Non-Academic Use of School • Demographics • Analysis

  3. District Strategic Plan Informs the Master Plan 3 Facilities Financial Human Resources Leadership and Communications Teaching and Learning

  4. District Schools and Attendance Areas 4

  5. Needs 5 • Capacity • Overcrowding • Square Foot Per Student • Actual Number of Seats • Physical Building Size • Deferred Maintenance • Health & Safety • Indoor Air Quality (HVAC) • Lighting (Daylighting) • Accessibility • Building Code Compliance • Athletic Fields • Technology • Energy Efficiency

  6. Needs • Utilization • Students per Classroom 6 • Enrollment • Current • Projected

  7. Enrollment – Actual vs. Projected 7

  8. Limited Resources 8 • Land Locked • Maximum build out • “Where do we go from here?” • Finances • Budget • Funding Sources • Day to Day versus Long Range Operations • Mandates • “Needs “ Versus “Wants”

  9. Priorities 9 Safety & Security High School Operational Cost Measures Middle School Elementary Schools “Should Have” Items Other Facility Needs “Want to Have” Items

  10. Recommendations • Facility Changes • Energy Audits • Indian Hill • RLMS • Magee • RLHS • ID ECM- implement • potential savings between $180,000- $90,000 annually • High School- phases • Freshman Center and commons • Music wing/locker rooms/connection corridors • Senior wing/connection corridor/lunch room upgrades • 11/10 grade wing/health center • Middle Schools – Capacity • Elementary Schools - Capacity • Non Facility Changes • Energy Audits • Indian Hill • RLMS • Magee • RLHS • ID ECM- implement • potential savings between $180,000- $90,000 annually • Year round School • Elementary/Middle Schools • Redistrict Elementary

  11. 11

  12. Agreement to plan – What does it mean?? • Agree to Teacher/Student ratios • K-3 = 24 • 4-8 = 26 • 9-12 = 28 • Priorities • Agree in concept with Option 4

  13. Agreement to plan – What does it mean?? • Agree to Teacher/Student ratios • Currently over capacity • Committing to lower ratios • Committing to additional staff • Committing to additions at all buildings • Priorities • Regardless of how implemented Safety and Security is #1 • HS - $68M and phasing • Operational cost Savings • Between $180,000 - $90,000 annual • MS - $31M or Year Round School • ES - $62M Year Round School • Should haves • Other Facilities • Wants • Agree in concept with Option 4 • $161M including all maintenance • Does not have to happen in 10 years