1 / 10

Mentors Workshop Electrical Sub-System Mark McLeod Team 358 Festo/Hauppauge H.S.

Mentors Workshop Electrical Sub-System Mark McLeod Team 358 Festo/Hauppauge H.S. F or I nspiration and R ecognition of S cience and T echnology. Objectives. FIRST Rules & Restrictions Official Suppliers & Other Sources Basics/Components Design Notes Potential Problems

yamin
Download Presentation

Mentors Workshop Electrical Sub-System Mark McLeod Team 358 Festo/Hauppauge H.S.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mentors WorkshopElectrical Sub-SystemMark McLeodTeam 358Festo/Hauppauge H.S. For Inspiration and Recognition of Science and Technology

  2. Objectives • FIRST Rules & Restrictions • Official Suppliers & Other Sources • Basics/Components • Design Notes • Potential Problems • Keeping Students Busy • Typical Schedule • Sample Layout

  3. FIRST Rules & Restrictions • Kick-off Rules • FIRST Wiring Diagram • Wire gauge • Grounding • Allowable divergence • Part of $3500 limit (2005) on additional parts • No single electronic component > $200 • Inspectors rule – volunteers and all that implies

  4. Official Suppliers & Other Sources • Official Suppliers • www.innovationfirst.com/ • Other Sources • www.jameco.com • www.mouser.com • www.digikey.com • www.future-active.com • www.newarkinone.com • www.radioshack.com

  5. Simplified Circuit Diagram Note: No control system wiring is included 120A Circuit Breaker - + 12V SLA Battery Circuit Breaker Panel Victor 884 Speed Controller Ground Stud Robot Controller Spike Relay Backup Battery Modified Diagram by Steven Shade, Team 1111

  6. Basic Components • Main battery (12v) • Wire gauge – 6, 10, 16 & 24 awg • Spikes (forward/reverse/off) • Victor speed controllers (coast, brake, calibrate) • Motors, fans, compressor • Circuit breakers – 120a main, 20/30/40a panel • Ground stud • Control system (7.2v battery) • Servos, solenoids • 12v sensors -- current, banner • Motors

  7. Design Notes • Diagram robot electrical layout • Access to all components for test and replacement • Control System status lights and buttons visible and accessible • Battery mounted securely and is readily removable • Weight of wire -- short wire runs • Crimp & solder, label all wiring, connections, fuses • Neatness counts – tie-up cable runs (electrical tape for insulation only)

  8. Potential Problems • METAL SHAVINGS (cover electronics) • Blown components • Welding robot frame w/electronics attached • Wiring loose/poor connection (PWM cables too) • Victor Speed Controller calibration • Overheating motors -- additional fan cooling • LockTite melts plastic – controllers, spikes • Breaker resets from stalled or improperly geared motors

  9. Keeping Students Busy • Variations on robot electrical layout • Develop basic skills • Circuit basics, e.g., series & parallel • Advanced circuits, e.g., IR beacon, CMU camera, or external processing circuit • Use of multi-meter • Learn to crimp & solder • Heavy components • Delicate electronics (heat sinks) • PWM and electrical connectors • Debugging techniques • Projects • Battery charging station • FIRST power connectors on battery charger • Test bed

  10. Typical Electronics Schedule • September thru December • Develop basic skills • January thru March • Six week build period • Robot design – space for electronics and wire runs • Motor/sensor requirements • Designing and testing solutions • Resolve physical layout • Integrating solutions with mechanical • Regional event • Inspection

More Related