1 / 5

LC14 Charging Statement

LC14 Charging Statement. Mo Sukumaran SSE (on behalf of DNOs) . Charging Statement Review. Distribution Licence Condition 14.4

yaphet
Download Presentation

LC14 Charging Statement

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LC14 Charging Statement Mo Sukumaran SSE (on behalf of DNOs)

  2. Charging Statement Review • Distribution Licence Condition 14.4 • “The licensee must periodically review the information set out in any Charging Statement available under paragraph 14.1 and, at least once in every Regulatory Year, must make any changes that are necessary to that statement to ensure that such information continues to be accurate in all material respects.” • DNOs maintain a ‘common’ template charging statement necessitating a joint review • EDCM changes proposed with EDCM submission • Additional stakeholder workshop held 26 May 2011 • Attended by LDNO and Supplier representatives

  3. Outcome • Many changes proposed to improve consistency • Improving use of Demand/Generation and Import/Export • Remove ‘tariff’ and replace with ‘charges’ • Standardising terms and improving definitions • Restructuring of Section 2 to improve layout • Billing category – better explanation of NHH & HH billing • Structure of charges – better explanation of charge components • Charge value calculations – add capacity charge value calculation

  4. Outcome (2) • Superfluous information removed • Redundant or duplicated wording • Further work to review DNOs LLF structures with a view to establish a common LLF layout • DNOs would then work towards establishing common layout with future LLF methodology changes

  5. Next steps Template statement currently being updated with changes discussed at workshop Proposed template statement to workshop participants for final comments Proposed new template finalised Circulate proposal for stakeholder comments Submit template to Ofgem for comment on form ‘approval’ DNOs to utilise template if ‘approved’ for basis of their statements and seek Ofgem form approval. Implementation with April 2012 charge notification