1 / 17

Tier I Working Group 2 nd Quarter FY 2010

Tier I Working Group 2 nd Quarter FY 2010. May 14, 2010. Overview. Rollup of 2nd Quarter FY 2010 Tier I Inspection Findings Minimum Inspection Criteria for Every Room/ Lab in Tier I Inspection Electrical Equipment Inspection Latest Status on Maximo Upgrade and Timetable for Common Database

yon
Download Presentation

Tier I Working Group 2 nd Quarter FY 2010

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Tier I Working Group 2nd Quarter FY 2010 May 14, 2010

  2. Overview • Rollup of 2nd Quarter FY 2010 Tier I Inspection Findings • Minimum Inspection Criteria for Every Room/Lab in Tier I Inspection • Electrical Equipment Inspection • Latest Status on Maximo Upgrade and Timetable for Common Database • Tier I and BLUEPRINT • Open Discussion (Issues & Good Practices)

  3. Rollup of 2nd Quarter FY 2010 Tier I Inspection Findings

  4. Data Roll-up and Review

  5. Data Roll-up and Review

  6. Data Roll-up and Review

  7. Data Roll-up and Review

  8. Minimum Inspection Criteria for Every Room/Lab in Tier I Inspection

  9. Minimum Inspection Criteria • Several incidents of late indicate Tier 1 items are not being addressed properly • BHSO Electrical Safety Assessment finds inaccurate or missing panel schedules, missing knockouts, modified panels, blocked panels, flexible wiring • Multi-topic assessment finds compressed gas cylinders secured with phone cord and no static inventory • OSH auditor finds extension cords on the floor • EEI inspector finds 40 pieces of electrical equipment requiring inspection during casual inspection

  10. Electrical Equipment Inspection Electrical Equipment Inspection

  11. Tier 1 Database Status

  12. New Tier 1 Database - Status • Maximo update in progress • Upgrade was to be completed by the end of the month • Now delayed up to 8 weeks • Consultant to be retained for 3 more weeks to review Tier 1 application • May be retained to assist with completion • Several requirements for new database need incorporation • Reminder notices (14, 30 day) • Workflow • Review/update/approve “draft” Tier I Inspection Reports (Release authority) • Notification to Action Owners • Report drafting and approval • Scheduling

  13. New Tier 1 Database - Status • Category/Subcategory list issued for review last quarter • A couple of responses • Comments will be incorporated and put into database

  14. Tier I and BLUEPRINT

  15. Tier 1 and BLUEPRINT -WBS 4.4 Tier I Program Improvements • Improve Tier 1 Program • Assess existing Tier I program • Develop and conduct workshop to redesign or enhance existing Tier I program, that will include input from Laboratory stakeholders to encourage ownership and engagement • Develop a plan to drive sustainable Tier I program improvements - the plan will include communication with and training of the Laboratory stakeholder community • Implement Tier I program improvements • Design and implement plan to assess improvement effectiveness for continuous program improvement

  16. Tier 1 and BLUEPRINT • Program status to date • Developed additional specialty checklists, training materials, and conducted training • Developed requirements for new database • Further refinement and effectiveness assessment depends upon better trending capability and finer detail • Findings are up, and indications are that departments are looking internally

  17. Open Discussion (Issues & Good Practices)

More Related