Geoff Waldschmidt RF Engineer ASD / RF DOE Lehman CD-2 Review of APS-Upgrade 4-6 Decem ber 2012

Short Pulse X-ray Dampers U1.02.01.03.07 / U1.03.03.07 (U1.02.01.03.05). Geoff Waldschmidt RF Engineer ASD / RF DOE Lehman CD-2 Review of APS-Upgrade 4-6 Decem ber 2012. Outline. Technical Significance WBS Scope Team Requirements

yoshi
Download Presentation

Geoff Waldschmidt RF Engineer ASD / RF DOE Lehman CD-2 Review of APS-Upgrade 4-6 Decem ber 2012

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Short Pulse X-ray DampersU1.02.01.03.07 / U1.03.03.07 (U1.02.01.03.05) Geoff Waldschmidt RF Engineer ASD / RF DOE Lehman CD-2 Review of APS-Upgrade4-6 December 2012

  2. Outline • Technical Significance • WBS Scope • Team • Requirements • Design • Interfaces • Value Engineering • Risks • ES&H • Cost • Schedule DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  3. Technical Significance • Dampers (LOM / HOM) • Maintains beam stability • In-vacuum HOM dampers (within cryomodule) • High-power handling: LOM (2kW) / HOM (0.5kW) • Rf Windows (LOM / Input Coupler) • Double windows for redundant vacuum barrier • Wide bandwidth for mode damping • Transmission power handling: LOM (2kW) / input coupler (10kW) • Waveguides (LOM / Input Coupler / HOM) • Required for power coupling and mode damping in the cavity • Designed to meet rf and thermal performance requirements HOM Damper RF window Cavity assembly DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  4. SPX Dampers and Windows Scope and WBSU1.02.01.03 & U1.03.03 (incl. SPX R&D Cavity/Tuners) HOM damper LOM damper LOM window Input Coupler window DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  5. The Team • APS Personnel • G. Waldschmidt – RF Engineering • B. Brajuskovic – Mechanical Engineering • D. Bromberek – RF testing • J. Fuerst – Mechanical Engineering • J. Liu – Mechanical Engineering • M. Middendorf – Test Stand Manager • G. Wu – Physicist • Cornell performed testing of rf parameters of the SiC material – led by V. Shemelin DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  6. SPX RF Window / Damper Requirements Beam-induced losses through cavity ports LOM: 1.53 kW • Designed for a total beam-induced power of 2.25 kW • PRD outlines longitudinal and transverse damping requirements for beam stability HOM: 265 W Beam pipe: ~15W FPC: 160 W LOM power spectrum DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  7. RF Window Designs APS Linac window • Windows are procured from CML Engineering • Input coupler windows are “identical” to standard WR284 APS Linac windows • LOM windows are a WR340 version of the input coupler window with optimizations across critical bandwidth • Windows have compact profile for cryomodule envelope • Windows have an average power rating of 15 kW LOM prototype: VSWR (2.2 - 2.4 GHz) LOM prototype: VSWR (2.9 – 3.9 GHz) Pillbox resonance Critical frequency range: 2.3 GHz and 2.9 – ~4.0 GHz DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  8. Damper Designs HOM damper: Four-wedge design • LOM damper is commercially available 5kW load • HOM damper is designed at ANL (based on PEP-II and KEK designs) and fabricated by industry • HOM dampers consist of a four-wedge design to reduce stresses • Water-cooled • Located inside the cryomodule at 300K LOM damper HOM: RF return loss HOM: Thermal profile DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  9. Prototype Dampers HOM prototype damper • Five prototype HOM dampers were successfully fabricated (prior to SPX0 dampers) • Damping material is Hexoloy SA Silicon Carbide (SiC) from St. Gobain - similar material used in ARES cavities at KEK* • Extensive tests were used to pre-qualify material • Particulate and Lifetime • Soldering / Brazing • UHV, ME, and RF properties • Improvements were incorporated into SPX0 design • Expanded eBeamwelding and machining • SiC tile soldering • Fixturingenhancements and plasma etching High-power test setup SiC test fixture RF test port *Operational Experience of HOM Absorbers at KEKB”, International Workshop on Higher-Order-Mode Damping of Superconducting RF Cavities, 2010. DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  10. SPX0 Damper Production Failed SiC plate • Identical SiC material was procured for SPX0 dampers • Material failed during cutting (July 2012) • Tomography analysis showed volumetric sub-surface fractures • Recovery plan is being implemented • Multiple SiCmaterials have been procured • Alternate vendor being developed • Materials are being tested for rf, mechanical, and vacuum properties • Plan was accepted by APS-U (Oct. 2012) • Delivery date has moved from Dec. 2012 to June 2013 • Copper damper waveguide bodies and flanges are being fabricated SPX0 damper waveguide body DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  11. Waveguide Requirements (U1.02.01.03.05) Cavity with waveguide, helium vessel, and tuner HOM damper • Primary requirement of waveguide is to transmit power to the cavity and dampers • Waveguide geometry must maintain broadband rf performance for HOM / LOM suppression • RF loading of the dampers at 2.815 GHz must be limited • Thermal leak to cooling circuits must be minimized • The waveguide designs achieve these guidelines HOM waveguide LOM waveguide Input coupler waveguide DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  12. Dynamic RF Loading RF simulation geometry • Dynamic loading of waveguides is due to rf input power and parasitic mode damping • 1.86 kW of input power produces 0.5 MV deflecting voltage • Dynamic loss in cavity is 7 W with Qo of 109 • Evanescent field decays slowly in end-group waveguides • HOM and LOM waveguides are designed for 300W and 2kW of traveling-wave rf power, respectively Surface loss density Input power vs. Qextfor different beam offsets Location of helium vessel Electric field Operating point DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  13. Waveguide Heat Load HOM Input Coupler 300K 300K 80K Dynamic loading: (1) 1.86 kW @ 2.815 GHz (2) Cavity evanescent field 80K 2K 2K Dynamic loading: (1) 300W @ 3GHz (2) Cavity evanescent field LOM 300K Dynamic loading: 2 kW @ 2.3 GHz 80K 2K Heat load to 2K due to waveguides: ~7.3W (each cavity) DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  14. Interfaces • LOM loads and RF windows are supplied by industry • HOM loads will be fabricated by industry with additional support from ANL • RF windows and HOM dampers will be supplied by ANL to JLAB for assembly onto the cavity string • Diagnostics, heating elements for each window / damper, water cooling, and vacuum pumping will be handled by AES group at the APS • Diagnostic signals will be setup by the Controls group in Epics for remote access and data logging DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  15. Damper / Window Value Engineering • Standard WR284 and WR340 waveguide sizes were used for the HOM / LOM dampers and windows • Modifications of existing designs • Developed WR340 LOM rf window based on the APS Linac WR284 pillbox window • Bellows for both FPC and HOM waveguides were modified from existing WR284 bellows (Darmstadt) DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  16. Damper / Window Risks and Mitigation • Particulate generation of the HOM dampers • HOM damper design was adapted to reduce particulates • SiCsurface is processed to reduce particulate generation • Particulate testing is being performed • Performance and durability of the HOM dampers • SiCmaterial has high thermal conductivity and low permittivity • Manufacturing process is carefully controlled • Soldering of SiC produces consistent and strong bonding • Water freezing in the rf windows / dampers due to 80K thermal intercepts • Water temperature is monitored • Redundant heating elements are located on each component • N2 gas-purging of water lines is under consideration in case of system power loss • Cavity venting due to RF window vacuum leak • Double window design is used for both the LOMs and input couplers • RF window diagnostics include IR cameras and arc detectors DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  17. Damper / Window ES&H • Integrated Safety Management System (ISMS) • APS-U Project following Argonne’s ISMS program requirements • Argonne Integrated Safety Management System (ISMS) Description recently revised and submitted to DOE ASO • Describes framework for integrating ESH requirements with mission objectives • References Argonne LMS procedures which implement specific portions of the ISMS • General Safety Requirements • Follow ASD/RF group safety policies • High-power (4 kW) rf testing is performed in 400A at the APS • Personnel and equipment safety interlocks are implemented • Test permits are required to document each experiment and outline the hazards and mitigation steps that are required DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  18. SPX Dampers and Windows Scope and WBSU1.02.01.03 & U1.03.03 (incl. SPX R&D Cavity/Tuners) • Damper (U1.02.01.03.07.01): $657k • HOM detailed design / Fabrication for (2) cavities for SPX0 / SiC / Ebeam welding / Testing • LOM dampers / External waveguide • HOM Dampers (1.03.03.07.01): $543k • HOM damper fabrication for (8) cavities (Design work on dampers is primarily incorporated into WBS U1.02) DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  19. SPX Dampers and Windows Obligation ProfileU1.02.01.03 & U1.03.03 (incl. SPX R&D Cavity/Tuners) DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  20. SPX R&D and Production Milestones U1.02.01.03 & U1.03.03 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  21. SPX Dampers and Windows Milestones U1.02.01.03 & U1.03.03 (incl. SPX R&D Cavity/Tuners) DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  22. SPX Dampers and Windows Summary Schedule U1.02.01.03 & U1.03.03 (incl. R&D Cavity/Tuners) DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  23. SPX Dampers and Windows BOE Contingency U1.02.01.03 & U1.03.03 (incl. SPX R&D Cavity/Tuners) DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  24. Work after CD-2 • Complete HOM damper fabrication for SPX0 • Procure LOM dampers, LOM windows and input coupler windows • Perform low-power and high-power testing / conditioning of dampers and windows • Perform tests on copper prototype cavity to characterize damping • Create design of external waveguide transmission lines for LOM damper and input coupler DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012

  25. Summary • The scope and cost of the dampers and windows are understood. • The damper and window system is based on requirements defined in the PRD for beam stability and the ESD for power handling. • The preliminary design is complete and the dampers and windows are in the process of procurement. • Resolution of issues with Hexoloy SA damping material for the SPX0 dampers is progressing. • Extensive testing of the dampers and windows will be performed. • Delivery to JLAB for SPX0 is 6/2013 and for SPX is 5/2017 • The cost is $4,085k • We are ready for CD-2 DOE Lehman CD-2 Review of the APS Upgrade Project 4-6 December 2012