An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RIMPAC 2014:In-Progress Review LCDR Evan Smith 01 April 2014 UNCLASSIFIED

  2. RIMPAC 2014 Planning Cycle 2013 • Concept Development Conference (San D.) 06-07 Feb • Scenario Development Workshop (San D.) 09-12 Apr • Initial Planning Conference (San Diego) 28-31 May • C3F Site Survey (Hawaii) 19-23 Aug • Mid-Planning Conference (Hawaii) 03-06 Dec • MSEL Development Workshop #1 (Hawaii) 07-10 Dec 2014 • Commander’s Conference (San Diego) 03-07 Feb • Final Planning Conference (San Diego) 07-10 Apr • MSEL Development Workshop #2 (SD) 10-11 Apr • Staff Exercise (San Diego) 14-16 Apr • Component Commander VTC Week Commencing 26 May • Execution (Hawaii and SOCAL) 26 Jun – 01 Aug • RIMPAC 2016 SLS meeting ~Nov

  3. RIMPAC 2014 Update UPCOMING • FPC – San Diego 07-10 Apr • MSEL #2 – San Diego 10-11 Apr • STAFFEX – San Diego 14-16 Apr • IPR to C3F – 22 Apr 14 CURRENT Final Planning Conference – San Diego 07-10 Apr • 611 Registrations • Exercise Documents • All external documents received • SRSG Update – 3 nominations • Detailed Briefs Schedule • PHOTEX/Group Sail Brief (SD-HI) – 1330-1430 01 Apr • HADR Brief – 1000-1100 02 Apr • FPC Prep – 1000-1100 03 Apr • STAFFEX Brief – 1000-1030 09 Apr CHALLENGES • USAF Tanker Support • 3 COA’s being developed by PACAF • Priority 3 • Public Ship Tours Day – Saturday 05 July 14 • Potential HA/DRlaydown shift • HZL’s moved to North part of Ford Island facilitating easier flight movements with little to no detriment to HADR portion of exercise. • Fourth Oiler • USNS JOHN ERICKSON identified • Pending approval at PACFLT

  4. 2014 Figures Live Fire Cost Savings Ship Count

  5. Surface & SOE WG Lead • SOE is ~95% complete (1599 events) • Includes the Live Fire Events • Group Sail CONOPS • Guam – CHO – Going to OSD • CSG-SD – CDS-9 – 1 Apr (Today) • ARG-SD – CPR-3 – 22 May • PHOTEX CONOPS – CDS-9 – 1 Apr (Today) • WASEX/TASW CONOPS • CTF 170 – Reviewing Drafts • CTF 176 – Reviewing Drafts Milestones OPTASKS review – ongoing (FDO) Draft V0 SOE available by FPC CONOPS for WASEX – 10 Apr 14 CONOPS for TASW – 10 Apr 14 All items are currently on track Issues Concerns Command element for Mercy – Sourcing a light detachment of 6-8 Personnel CTF 173 RAS plan reworked to account for loss of HMCSProteceur. A plan to source CTF 73, John Erickson to fill gap – (at PACFLT for approval) • Offered 27Jun-25Jul • need 7Jul-25Jul No assistance required at this time.

  6. Air Working Group • Current Items • Re-write Standard Event Instructions* • Re- write SPINS • Helo log / DV plan • Matching Wing helos will empty decks* • CONOPs for PRC X-Deck* • Shield Aviation IFC / COA in work* • Group Sail Helofor CHOSIN* Milestones All items tracking • Spins are the long pole • Issues Concerns • Tanker update

  7. ASW/Sub WG Lead Milestones SOE finalization following NCEA allotment received (prior to FPC) Exercise Instructions finalized (prior to FPC) MSEL/Intel products completed (prior to FPC) PMI plan to CSP for review/issue (01MAY) Current Items Continuing to refine SOE CHR to replace HOU Issues/Concerns None Presenter: LCDR Marcelo

  8. Amphibious/Land Working Group NEO, Amphib Raids/Asslts FSCEX Force Integration Trng Future Planning / Milestones 26-27 Feb MCWL Pre-RIMPAC FPC 28 Feb CONOPS to CMFCC 01 Mar JMD inputs due (CFLCC) 16 Mar CTF 176 Draft OPGEN (CTF 176) 16 Mar Draft OPTASK Amphib (PHIBRON 3) 26 Mar CFLCC OPORD (received) 07 Apr CFLCC Exercise Directive (Draft) 07-11 Apr RIMPAC FPC/MSEL 11 Apr MSEL Development Conference 14-16 Apr STAFFEX Current Status CFLCC JMD is still being sourced; updates have been provided to LT Leonard. FPC, MSEL, STAFFEX Preparation Received draft copy of the CFLCC OPORD Tracking PEL Ballast Tank repairs (ECD: 10 April 14) Issues / Concerns Continuing to track PEL maintenance and Basic Phase Training completion • At risk warfare areas include AMW, EXPSAF, AW/SW/EW, 3M • MOB-D and FSO-M will be completed during transit from SD to HI • (CFLCC) Extension requested for JMD inputs to allow for time for collection of partner nation billets Amphibious lift • Coordinating aircraft lift to and from San Diego (FOS) Presenter: LCDR Taft

  9. MIW Admin & Logistics Mutual Logistics Support Order (MLSO) arrangements for most nations need confirmation at FPC. Key Issues EODGRU1 is coordinating with FLC San Diego to find a way to fulfill coalition LOGREQs NEW PARTICIPANTS USS CORONADO (Independence Class) participating 7 to 11 Jul 14 • Fitted with Surface Warfare Mission Module • Likely tasking as UMCM – UUV Support platform Presenter: LCDR Dawe

  10. CFSOCC Update • Current Items • Confirming FPC attendance and agenda • Refining logistics plan • RSOI • Planning spaces • Range coordination • Vehicles & berthing • Issues Concerns • HSC-85 out Alt COAs being developed • Funding Lean but doable • 11m RIBs HI boats & SOE Mods • USSOF out TO’s covered by PNs • Force flow, RSOI SOCPAC engaged Presenter: LCDR Milgazo

  11. Status of Planning • RIMPAC NCEA allocation received • Live Fire SOE 95% complete Presenter: Mr Goodale

  12. Sonobuoys DIFAR 3428 less than requested (5200/2772) DICASS 760 less than requested (1100/340) 35% reduction in USN MPRA missions Possible 50% reduction during the FIT TASW Phase Coalition scheduled to make up the delta VP-1 ORE 3 crew ASW quals vice 6 Target Allocation We will need BQM-74’s, Allocation – 4 Will use BQM-34 when able Possibly need Low Cost Modular Targets for Hellfire Will work with PACFLT on both issues. Issues and Way Ahead

  13. CIS Major Tasks: Coordinate with US MILGRUs on identifying encryption devices Finalize Helpdesk structure/manning Coordinate with at risk and sites not supported with CENTRIXS Finalize frequency/spectrum reqts Promulgate IM/CAS plans/processes (hampered by lack of a KM) * Message traffic, data transfer, VTC/Battle Rhythm PACFLT CENTRIXS Support Update: All partner nation requests were approved 5 Partner Nations will get PACFLT funded CFAKs, but encryption devices still need to be identified 4 Partner Nations are executing FMS cases for support 4 US Shore sites can not be supported 2 US shore sites are at risk for install C3F Way Ahead No critical issues/additional support required at this time, but any of the CENTRIXS support items can quickly trend to RED. Key Tasks and dates: C4I Requirements message 1 Oct COMSEC Intent to Use 1 Nov NPC Msg 1 Nov CFAK Req/Pri list to PACFLT 13 Dec COMSEC call out message 12 Mar DTG: 121511Z MAR14 Ship rider request DRAFT 1 Apr OPTASK COMMs(Date Change) 30 Apr Spec Management/JSIR 1 May Presenter: LCDR Walker

  14. RIMPAC CENTRIXS Support CCTF (COMTHIRDFLT) VADM Kenneth Floyd, USN PWC-NMCI FMS PWC-NMCI Deputy CCTF CECG Comd Vice CCTF PWC-NMCI AOC-Organic TBD -Organic PWC-NMCI CFLCC NO CENTRIXS: -MARFORPAC G6 At Risk: -SPECMAGTF, ACE1 * Operational D/CFMCC D/CFACC CFACC CFMCC CFSOCC NO CENTRIXS: - 25th ASOS • NO CENTRIXS: • - EODMU 1 (CTF 177.1.2) • Mobile TOC • At Risk: • - MCMDIV31 (CTF 177.2) SGP - CFAK, CCI BRN - CFAKs, Crypto,Shipriders(2 ships) IND - CFAK, Crypto,Ship riders IDN - CFAK, Crypto,Ship riders COL - CFAK, Crypto, Ship riders NOR- FMS: CFAK CHI - FMS: 1 ship, 1 shore HQ JPN - FMS: 2 ships KOR - FMS: 2 ships, 1 sub • Crypto: SG/KG-250s • - 6 of 6 identified. Working the transition onto the C3F COMSEC account. • US Ship Riders: 2 per ship • - JMD billets Non-RIMPAC C2 NO CENTRIXS: - NUWC ( S&T / TW14)

  15. Scenario WG • Current Items • Updating MSEL with changes identified in internal MSEL scrub • Continued MSEL inject drafting in prep for MSEL Development Conference #2 • RIMPAC chart order finalized with NGA & DLA Milestones FPC 07-10 APR • Opportunity to interface with key coalition functional component commander representatives MSEL Development Conference #2 10 - 11 APR • Invitations sent via email to WG leads and trusted agents • Fill in gaps identified during internal MSEL scrub Support to RIMPAC STAFFEX • N2 will provide personnel and products to include OOB, storyboards, geography, etc. • Issues Concerns • None UNCLASSIFIED Presenter: LT O’Brien

  16. N4/LRC Funding Minor repair for Bldg. 3225H, no cost to C3F Working RIMPAC payment of mess bills for Foreign National & NGO Finalizing ORF for RIMPAC FPC • Issues / Concerns • NSTR Exercise lift JOPES data entry is completed. Review/Cleanup in progress. COMPHIBRON 3 CCO is performing load planning with PEL/RUS/RRN. Presenter: LCDR Reyes

  17. Public Affairs Milestones 1 MAR 14: Draft PAG to CPF 7 APR 14: FPC- PAG Finalized MAY 14: Exercise Announcement MAY 14: Release Final PA Plan MAY 14: Establish RIMPAC Websites Current Items PAG Development PHOTOEX DV/VIP update Recent interest from • Aviation Week, CCTV Issues Concerns IMAX Project 5 July General Public Visiting Reception attendance recommendations Presenter: CDR Brown

  18. HADR Update Support Needed from C3F: NSTR Significant Events HADR Brief 2 APR Items in Progress: -Continued Coordination with JBPHH Shift of HLZs -LSV participation -MERCY Integration -PRC SMEE/TTX 14JUL agenda Presenter: LCDR Yandoc

  19. Medical Working Group Update USNS MERCY’s new tender boats (2) Future 7-11 APR: FPC / MSEL Conference • Propose final plan for PRC engagements • Site visit to PEACE ARK • Window of opportunity: 14 Apr – 14 May *All items on track Current Medical Exercises – FIT/Free play phases MILMED Symposium Subject Matter Expert Exchange (SMEE) events NGO participation for SMEE Identification of PN presenters MERCY Command Element – Pending Decision HeloDet to embark MERCY – Pending Decision Identifying range protocols for injuries • Issues/Concerns • CAN medical provider credentialing • Pending decision from CO, NHCL HI • * No items need Flag attention Presenter: LCDR Milliner

  20. Legal Working Group Status Report • On Track; no assistance required • ROE • Draft updated based on Working Groups’ feedback - will validate at FPC/STAFFEX • Environmental Compliance Annexes • Annex L, R – Drafts Complete • DVDs are ready for distribution at FPC • Liberty Planning – FPC Agenda Item • Unmanned Surveillance Ops – Legal Support • Shield Aviation Contract; NASA Interagency Support Agreement • Exercise Scenario Support • MSEL Conference support Scenario Working Group • Legal Symposium • Scheduled for Harbor Phase – 1 July Presenter: CDR Cooper

  21. Information Operations Milestones MAR 14: OPTASK IO (CSG-9) - Transmitted APR 14: RF Spectrum Coordination (AESOP) messages transmitted 22 MAY 14: Network assessments begin for ships inport San Diego 17 JUNE 14: Network assessments begin for ships inport Hawaii Current Items Defensive Cyber Ops • Multinational computer network defense assessment teams led by C3F IO Cell • Assess units’ Combined Enterprise Regional Information Exchange System – Maritime (CENTRIXS-M) Cooperative Maritime Forces Pacific (CMFP) Enclave to ensure proper configuration and security posture Issues Concerns • Operations Security • Protecting Critical Information Presenter: LT Humphrey

  22. Experimentation Upcoming Milestones: FPC (7-10 APR): • Finalize experimentation day-by-day event flow • Verify cross-working group requirements Installation Benchmarks: • 18 Mar - Draft Install Offer Message to CPF (Delayed, awaiting SCDs) • 18 Apr – Base Electronic System Engineering Plan • 25 Apr – Firewall Service Request Planning to Date / Status: 36 initiatives • 1 initiative dropped • 1 possible new addition (commercial satellites) • Installations: • Administrative requirements on track for execution • Site surveys continuing, working through recent ship swap between CTGs for some initiatives • Data Collection Plan: • Creating individual plans and tailored surveys for each initiative • Integration into SOE • Incorporated over 140 events Issues: NSTR Platforms with Experimentation Installations: • USS RONALD REAGAN CVN-76 • USS RUSHMORE LSD-47 • USS PELELIULHA-5 • USS SAMPSON DDG-102 • USS SPRUANCE DDG-111 • USS GARY FFG-51 • USS RODNEY M DAVIS FFG-60 • USNS NAVAJO (T-ATF-169) • HMASCHOULES L-100 • HMAS SUCCESS OR-304 • HMNNZ CANTERBURY L-421 • HMCS CALGARY FFH-335 Presenter: LT Roberts

  23. Link/COP • Harbor Phase Training • Preliminary training plan complete (NOTAL) • SSC PAC Group-3 to conduct inport connectivity checks • RAAF participating as well • Joint Interface Control Cell(JICC) Manning • Manning requirements iso JICC watch at 613th AOC submitted • Additional training billets added on a pay to play basis for JICO’s worldwide • Tracking • RRN OPTASK Common Tactical Picture(CTP) • CSG OPTASK ID Presenter: LCDR Kaul

  24. Reception and Integration Way Ahead Complete CJMD Fills Solidify Lodging Arrangements Coordinate Additional Security Requirements Current CJMD Status • CCTF/CECG: 73% • CFMCC: 63% • CFACC: 75% • CFLCC: 32% Received 65% of Canada’s inputs Lodging Requirements Coordination Continues Awaiting Customs response Issues Permanent C3F KM prior to RIMPAC • TFMMS Package at NAVMAC to Establish Position • PD with HRO SW for Classification • Awaiting CPF Comptroller for Funding Presenter: LT Leonard

  25. NEF / CTF 171 Status of Planning JOPES Data submitted NEF OPORD released CJMD names 80% complete MSEL injects submitted Translator requestssubmitted Coalition Support AUS EOD / Dive forces Can EOD / Dive forces PRC Dive forces ROK EOD forces NLD EOD Forces Interagency Support USCG MSST USCG Dive Team Issues NSTR Presenter: LCDR Schiller

  26. METOC Working Group • Current Items • Product releasability coordination with NIPO • Finalizing OPTASK METOC • Finalizing METOC product suite Milestones 02 APR - METOC Final IPR before FPC METOC Task Organization finalized • Issues of Flag Concern • NONE. Presenter: CDR Hinz

  27. Fires Working Group Milestones APR 7: FPC Finalize fires plans Current Items JDOCS install JDOCS Training Schedule • Confirm at FPC Fires Cycle Scheduling • Confirm at FPC Issues Concerns • None Presenter: FCCM Wheeler

  28. Intelligence WG Focus: Intel Cycle execution within RIMPAC scenario • Current Items • Targeting/BDA supplemental guidance development Due Outs / Milestones Publish supplemental guidance to Intelligence CONOPS – Apr 14 • Issues Concerns • None UNCLASSIFIED Presenter: CDR Campbell

  29. Questions