Welcome to the Glenn Highway MP 66.5-92 Public Open House

Welcome to the Glenn Highway MP 66.5-92 Public Open House. Glenn Highway Rehabilitation Milepost 66.5-92 Neal Christensen, Project Manager Federal Highway Administration (FHWA), Western Federal Lands Division (WFL) www.wfl.fhwa.dot.gov. Purpose of the Meeting.

zarifa
Download Presentation

Welcome to the Glenn Highway MP 66.5-92 Public Open House

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Welcome to the Glenn Highway MP 66.5-92 Public Open House

  2. Glenn Highway Rehabilitation • Milepost 66.5-92 • Neal Christensen, Project Manager • Federal Highway Administration (FHWA), Western Federal Lands Division (WFL) • www.wfl.fhwa.dot.gov

  3. Purpose of the Meeting • Provide an overview of the: • Corridor project, MP 66.5-92 • Chickaloon Bridge replacement project • Long Lake design options • Answer questions and collect feedback

  4. Project Area Map Chickaloon Bridge Long Lake Area

  5. Purpose and Need • The purpose of this project is to enhance the safety of the highway and accommodate the anticipated traffic for the next 20 years. • This rehabilitation project will: • Preserve and extend the service life of the highway • Enhance safety • Provide climbing lanes • Provide rock fall mitigation

  6. Schedule

  7. Environmental Assessment Work • 1993: an Environmental Assessment and Finding of No Significant Impactfor Glenn Highway MP 35-109 were approved • 1993 thru 2014: four NEPA Re-evaluations** completed for phased improvements to the Glenn Highway, including near the Palmer and Sutton areas, Pinochle Hill, Hicks Creek and Caribou Creek • 2014: NEPA Re-evaluations for the replacement of the Chickaloon Bridge and Glenn Highway between MP 66.5 and 92 • ** A NEPA Re-evaluation, often used in large multi-phased construction projects that occur over a number of years, examines potential changes in environmental impacts that may have occurred in a project area previously reviewed under NEPA.

  8. Corridor Map

  9. Chickaloon Bridge

  10. Chickaloon Bridge • The Chickaloon Bridge is a priority due to low structural ratings of the deck and railing. • Repair costs for the bridge are high, and the lifespan of the repairs would be limited. • Replacing the bridge now will cost less in total than repairing the bridge and then replacing it in the near future. 

  11. Long Lake Area South Alignment

  12. Long Lake Alignments

  13. What’s Next? • Continue design on MP 66.5-92 corridor project • Final design on the Chickaloon bridge • Additional public events, dates to be determined

  14. THANK YOU • Project team members are present to answer questions. • www.wfl.fhwa.dot.gov/projects/ak/glenn • Project Email Address:glennhighway@dot.govNeal Christensen, FHWA Project ManagerPhone: (360) 619-7780