1 / 10

Defence Capability Plan Training Projects

Defence Capability Plan Training Projects. Air Commodore Ian Meyn Director General Aerospace Development Capability Development Group. DCP 2009 Aerospace Development Projects. Air Combat Capability Air Lift Capability Battlefield Lift Capability Naval Combat Aviation

zelig
Download Presentation

Defence Capability Plan Training Projects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Defence Capability PlanTraining Projects Air Commodore Ian Meyn Director General Aerospace Development Capability Development Group

  2. DCP 2009 Aerospace Development Projects • Air Combat Capability • Air Lift Capability • Battlefield Lift Capability • Naval Combat Aviation • Maritime Surveillance & Response • Battlespace Management • Electronic Warfare • Information Superiority • ISR • Situational Awareness • Training • Weapons Platforms Enablers

  3. Capability Development process

  4. Aircrew Training Projects • Air 5232 Ph 1 – ACO Training System • Air 5428 Ph 1 – Pilot Training System • Air 5438 Ph 1A – Lead-in Fighter Capability Assurance Program • Air 9000 Ph 7 – Helicopter Aircrew Training System

  5. Training • Air 5232 Ph 1 – ACO Training System • Aim: Provide the ADF with an Air Combat Officer (ACO) and Observer (OBS) training system tailored to meet the training neds of future ADF ACO and OBS aircrew • Scope: Replace aircraft, ANT, SNT and ground training system • Key milestones: • First Pass approval: FY2009-10 to FY2010-11 • Year-of-Decision: FY2011-12 to FY2012-13 • Initial Operating Capability: 2015 to 2017

  6. Training • Air 5428 Ph 1 – Pilot Training System • Aim: Provide Air Force, Army and Navy with a new fixed-wing Pilot Training System (PTS) • Scope: Development of the PTS including training media (aircraft, simulators), curriculum, training aids, manuals and software • Key milestones: • First Pass approval: Complete • Year-of-Decision: FY2012-13 to FY2014-15 • Initial Operating Capability: 2015 to 2017

  7. Training • Air 5438 Ph 1A – Lead-in Fighter Capability Assurance Program • Aim: to ensure JSF requirements are met • Scope: Hawk Mk 127 upgrade, new simulators, enhanced mission planning and debriefing systems • Key Milestones • First Pass FY 09/10 – 10/11 • YOD FY 2011/12 – 12/13 • ISD 2015 - 2017

  8. Training • Air 9000 Ph 7 – Helicopter Aircrew Training System • Aim: to provide rotary wing training to the Navy and Army • Scope: Replace the current fleet of Navy and Army training helicopters with a system appropriate to the contemporary operational types. Training system will include a twin engine IFR helicopter, synthetic training and potentially an Aviation Training Vessel. • Key Milestones • First Pass Completed • YOD FY 2011/12 – 12/13 • IOC 2014 - 2016

  9. Capability Timeline

  10. Questions/Contact AIRCDRE Ian Meyn Director General Aerospace Development (DGAD) Aerospace Development Branch Capability Systems Division R1-3-C081 Russell Offices Tel: +61 2 6265 5529 Fax: +61 2 6265 3195 Email: Ian.Meyn@defence.gov.au

More Related