280 likes | 408 Views
Selenium Removal from Mine Waters Raymond J. Lovett, Ph.D. Environmental Chemist ShipShaper, LLP Morgantown, WV. National Mine Land Reclamation Center, West Virginia University United States Office of Surface Mining Magnum Coal Company Catenary Coal. SUPPORT. [Se] = 13 ug/L
E N D
Selenium Removal from Mine Waters Raymond J. Lovett, Ph.D. Environmental Chemist ShipShaper, LLP Morgantown, WV
National Mine Land Reclamation Center, West Virginia University United States Office of Surface Mining Magnum Coal Company Catenary Coal SUPPORT
[Se] = 13 ug/L [Fe] = 0.15 mg/L [SO4-2]= 980 mg/L Alkalinity = 235 mg/L as CaCO3 pH = 7.1 Typical Southern West Virginia Mine Water
Problems • Overriding Concern • Regulatory limit near 5 ug/L • Specific Problems for Treatment • Low level of Se • Differing chemistries • Selenate, SeO4-2, Se(VI) • Selenite, SeO3-2, Se(IV)
Selenium Removal Difficulties • Different dissolved species • No direct precipitation chemistries • Reduction of selenate is difficult (slow) • Sulfate may interfere
Treatment System Objectives • Effluent maximally 5 ug/L Se • Low installation cost • Low operating cost • Passive
Demonstrated Chemistries • Adsorption or co-precipitation by Fe(III) hydroxides • Biological (bacterial reduction) • Reverse osmosis • Reduction by Fe(0)
Reduction with Iron Metal • SeO4-2 +Fe(0) => Fe(II,III) +Se(0) • SeO3-2 +Fe(0) => Fe(II,III) +Se(0)
Field TrialCatenary Coal Test in a real setting Real, variable input chemistry Continuous Se Input
Reduction with Iron Metal • Potential • Removal of selenate and selenite • Passive • Problems • Iron Oxides/ Dissolved Fe, Mn • Exhaustion • Passivation • Expense (surface area)
BacterialEstimated Cost • Flow = 285 gpm • Capital Cost = $7.2 to $10 million • O&M = Unknown
Reverse OsmosisEstimated Cost • Flow = 200 gpm • Capital Costs = $1.2 million • O&M = $5.85 million/year
Iron HydroxideEstimated Cost • Flow = 200 gpm • Capital Cost = $0.69 to 1.03 million • O&M = $1.39 million/year
Zerovalent IronEstimated Cost • Flow = 250 gpm* • Capital costs = $478,000 • O&M = $150,000 to $300,000 * Gravity flow, includes surge
Conclusions • Iron metal removes selenate and selenite, but currently requires long contact times • Manganese and iron generated • Temperature sensitive (?) • Less expensive than other methods