An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TELEMAC workshop 12-14 January 2005 Summary TELEMAC progress and TELEMAC report Grenoble SMART Meeting – 17-18 January 2005

  2. TELEMAC workshop 12-14 January 2005 Lebanese team: Mohamad Awad Tunisian team: Ali Chouaya TELEMAC specialist: Yvon Mensencal Aim of this workshop: 3 days with our expert in order to check the modelling results and environmental scenarios + “telemac” indicator application

  3. Turkey : Izmir Bay and Gediz river Done Construction of the TELEMAC Hydrodynamic model Work in progress Calibration of the TELEMAC hydrodynamic model Next step Hydrodynamic scenarios Water quality model (SUBIEF) WQ scenarios Indicator application Report - Gediz Delta Agricultural polution in Gediz river Outer Bay North Izmir treated sewage discharge Izmir Inner Bay Middle Bay Izmir uncontrolled domestic and industrial wastewaters Inner Bay South Izmir treated sewage discharge Polution source

  4. Egypt : Abu Kir Bay . • Done ? • Work in progress ? • Next step ? • Report ? • No information on the TELEMAC work ! • No information on the report !

  5. Lebanon : Abu Ali Bay • Done • TELEMAC Hydrodynamic model • Hydrodynamic scenarios • SUBIEF Water quality model • WQ scenarios • Review by SOGREAH of the draft report • Work in progress • Application of the TELEMAC indicators • Report • TELEMAC draft report available

  6. Jordan : Gulf of Aqaba Done TELEMAC Hydrodynamic model Hydrodynamic scenarios SUBIEF Water quality model WQ scenarios Review by SOGREAH of the « final » report Work in progress Corrections by the Jordan team of the final report Next step Application of the TELEMAC indicators Report Draft Final report available

  7. Tunisia : Hammamet Done TELEMAC hydrodynamic model (nested model : large model for boundary conditions + local hydrodynamic model) SUBIEF Water quality model Work in progress Hydrodynamic scenarios Water quality scenarios Next step Application of the TELEMAC indicators Report Draft report in progress