1 / 8

Electronic Scheduling Work Group Update Rick Lowther SRP

Electronic Scheduling Work Group Update Rick Lowther SRP. Interchange Scheduling and Accounting Subcommittee Meeting Salt Lake City, UT August 2013. Electronic Scheduling Work Group Meetings. Past March 20-21, 2013 – Salt Lake City Future – ?. WIT Change Order 24 Re: INT-011-WECC-RBP-2.

zona
Download Presentation

Electronic Scheduling Work Group Update Rick Lowther SRP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Electronic Scheduling Work Group UpdateRick LowtherSRP Interchange Scheduling and Accounting Subcommittee Meeting Salt Lake City, UT August 2013

  2. Electronic Scheduling Work Group Meetings • Past • March 20-21, 2013 – Salt Lake City • Future – ?

  3. WIT Change Order 24 Re: INT-011-WECC-RBP-2 • BP specifies e-Tag requirements for ten-minute recallable reserve transactions. • e-Tag type set to “RECALLABLE” • Energy product type set to “C-RE” • Reserve obligation multiplier set to 100% • Reserve Responsible Entity set to sink BA or LSE • Sink BA or LSE activates reserves by downward market level energy profile adjustment (start time less than ten minutes past; zero ramp duration) • Source and sink BAs must approve market level energy profile adjustments

  4. WIT Change Order 24 Re: INT-011-WECC-RBP-2 • ESWG provided a requirements document specifying Interchange Authority functionality. • Special “RECALLABLE” e-Tag processing requirements • Allow Source BA to submit downward market level energy profile adjustments. • Default unspecified ramp durations to zero minutes for market level energy profile adjustments. • Require only Source and Sink BA approval.

  5. WIT Checkout Process Re: INT-021-WECC-RBP-1.3 • Requires adjacent BAs to checkout net scheduled (NSI) and net actual (NAI) interchange. • Checkout process timeframes • Pre-schedule day in accordance with WECC pre-schedule calendar (NSI only) • Next hour of current day (NSI only) • Current hour upon change (NSI only) • Prior hour of current day (NSI and NAI) • Past day (NSI and NAI)

  6. WIT Checkout ProcessRe: INT-021-WECC-RBP-1.3 • Suggested changes to reduce labor • Automate the prior hour/past day NSI checkout if there are no schedule changes since the current hour/next hour/pre-schedule day checkout. Currently, separate prior hour/past day and current hour/next hour/pre-schedule day checkboxes must be checked. • Automate the prior hour/past day NAI checkout if adjacent BAs upload matching NAI values. Currently, each BA can check the checkboxes even if they upload different NAI values. • Do the proposed changes meet WECC audit requirements?

  7. e-Tag IssuesRe: INT-014-WECC-RBP-1 • Reserve Responsible Entity (RRE) designation • All e-Tags that source and sink within the Western Interconnection must specify an RRE for the scheduled energy. • e-Tag Agents must provide a dropdown list of valid RRE selections that include source and sink BA along with GPEs or LSEs that are Reserve Sharing Group members. • ESWG needs to update the list of GPEs for certain joint-owned generation resources.

  8. Rick Lowther Questions?