170 likes | 349 Views
Technical Specification Group Services and System Aspects SP-080690 Meeting #42, 8 - 11 December 2008, Athens, GREECE. TSG-SA WG5 ( Telecom Management) Status Report. Prepared and Reported by Christian TOCHE Dionisio ZUMERLE TSG-SA WG5 Chair TSG-SA WG5 Secretary. Agenda Item: 7.5
E N D
Technical Specification Group Services and System Aspects SP-080690 Meeting #42, 8 - 11 December 2008, Athens, GREECE TSG-SA WG5(Telecom Management) Status Report • Prepared and Reported by • Christian TOCHE Dionisio ZUMERLE TSG-SA WG5 Chair TSG-SA WG5 Secretary Agenda Item: 7.5 Document for: Information
3GPP SA5 Officers OAM&P (Operations, Administration, Maintenance & Provisioning) And Charging Management Christian TOCHE (Huawei)Chair since 08/2005 (2nd term) Istvan ABA (T-Mobile) VC since 08/2007 (1st term) Thomas TOVINGER (Ericsson) VC since 08/2007 (1st term) • Charging SWG Patrik Teppo (Ericsson) Chair Mingjun Shan (Huawei) Vice Chair • OAM&P SWG Shuqiang HUANG (ZTE) Chair • SON SWG Christian Toche (Huawei) Convenor Dionisio ZUMERLE (MCC) Secretary SP-080690 3GPP SA5 Report to Meeting #42
Inter-Organizational: OAM&P OAM Standards Harmonization • Methodology convergence with ITU-T SG4 and other SDOs • Requirements and Information Service templates aligned in early Rel-8 (2007-09) • Remaining Rel-8 work focuses on Solution Set guidelines and templates • Regular conference calls with ITU-T SG4 also involving TISPAN WG8, TMF and ATIS TMOC • Process to keep common Methodology documents aligned has been agreed • Cooperation on Subscription Management (SuM) • Established bi-monthly conference calls with TMF and TISPAN on convergence of the concepts and modelling of subscriber, subscription, users and related service data • Work plan was agreed, several contributions were already discussed • Cooperation with TMF mTOP on the usage of XML technologies • Monthly conference calls also involving ITU-T SG4, TISPAN WG8 and ATIS TMOC • Work to be correlated with the new SA5 WID on SOAP/XML Solution Sets Cooperation with 3GPP2 • 3GPP2 OAM&P is now in 3GPP2 TSG-S WG2 (Architecture and OAM&P) • 3GPP2 is fully reusing SA5 Interface IRPs • For NRM IRPs and Measurements, 3GPP2 is referencing SA5 specifications and producing a Delta Specification • Need was identified by 3GPP2 to separately document in SA5 Common IMS and non-common IMS performance measurements (similar request for Trace), a WI would be needed to pursue • Need was identified by 3GPP2 to separately document in SA5 Common IMS and non-common IMS object models, a WI would be needed to pursue SP-080690 3GPP SA5 Report to Meeting #42
Inter-Organizational: Charging ETSI TISPAN • SA5 identifies there is no need to maintain TISPAN ES 282.010 as this document only endorses the 3GPP charging specifications and adds Tariff Information operation. • The Tariff operation is considered in AoC WI, and the requirement from TISPAN, i.e. RTTI was reviewed in charging calls to confirm being used for Advice of charge only, not for actually charging for security constraints. Open Mobile Alliance (OMA) • 3GPP Charging architecture underlies OMA Charging architecture • OMA Charging specs are reusing 3GPP diameter vendor ID and AVP, new AVP codes allocated and documented in SA5 TS. • Ongoing Collaborations with OMA Charging features e.g. IM, DCD, CPM, MEM through AVP code assigning. • Solutions as common as possible for AoC requirement are seeking, Liaison exchange ongoing ITU-T SG4, ITU-T SG13, ITU-T NGNMFG, ATIS TMOC • initial work done on NGN Charging harmonization focused on ITU-T SG13’s requirements • Next step for harmonizing solutions between 3GPP SA5 and ATIS TMOC would require additional resources (currently in standby) 3GPP2 • 3GPP2 endorses 3GPP Charging specifications for Charging aspects related to common IMS Offline Charging (no IMS Online Charging in 3GPP2). • No additional work identified so far with 3GPP2 (currently in standby) SP-080690 3GPP SA5 Report to Meeting #42
Meetings held 3GPPSA5#61 • 13-17 Oct – Dalian, CN • Hosted by ZTE • Attended by 58 delegates 3GPPSA5#62 • 17-21 Nov – Miami, US • Hosted by NAF • Attended by 53 delegates SP-080690 3GPP SA5 Report to Meeting #42
SA5 Statistics since last SA • Agreed 3 new/updated WID • Agreed 5 TS/TR for information • Agreed 9 TS/TR for information • Agreed 90 Change requests • Received 30 Liaison statements • Sent 10 Liaison statements • Handled 859 documents
SA5 Documents history Data Source: 3GPP website, WG meeting / document directories SP-080690 3GPP SA5 Report to Meeting #42
Release 8 SAES (EPC), LTE (E-UTRAN) SIDs: UID_340036 Study on management of LTE and SAE Progress 95% to 100%. TR 32.816-100 (Submitted for approval SP-080710). WIDs: UID_390001 E-UTRAN Data Definitions UID_370001 Subscriber and Equipment Trace for E-UTRAN and EPC. Progress 60% to 90%. UID_380036 E-UTRAN Network Resource Model IRP. Progress 30% to 60%. UID_390002 Performance measurements for E-UTRAN. Progress 30% to 80%. UID_390003 Key Performance Indicators (KPIs) for E-UTRAN. Progress 30% to 90%. UID_390004 Management of Self-Organizing Networks (SON) UID_390005 Self-Establishment of eNBs. Progress 30% to 90%. UID_390006 SON Automatic Neighbour Relations (ANR) List Management. Progress 30% to 80%. UID_390007 SON Self-Optimization & Self-Healing handling. Progress 10% to 40%. UID_390010 EPC Data Definitions UID_380037 EPC Network Resource Model (NRM) IRP. Progress 20% to 80%. UID_390002 Performance measurements for EPC. Progress 30% to 80%. SP-080756 New WorkItem Proposal on NE Software Management SP-080757 New WID on Study of UE Management SP-080690 3GPP SA5 Report to Meeting #42
Release 8 OAM&P Feasibility Studies (OAM8-Studies) • UID_340036 Study on management of LTE and SAE • See previous slide • UID_360007 Study of SON related OAM interfaces for Home NodeB • Progress 45% to 70% • SP-080708 New WID on 3G HNB OAM - type 1 • SP-080794 New WID on R9 3G HNB GW OAM&P • UID_360006 Study of System Maintenance over Itf-N • Progress 65% to 70%. • UID_390017 Study on Self-healing of Self-Organizing Networks (SON) • Progress 15% to 40%. • UID_400029 Study on SOA for IRP • Progress 10% to 15%. SP-080690 3GPP SA5 Report to Meeting #42
Release 8 OAM&P Rel-8 (UID_340063, OAM8) Operation, Administration, Maintenance and Provisioning • Target completion remains Dec 2008 • Covers several independent items, as shown in the Work Plan UID_340064 BB Network Infrastructure Management 8 UID_35051 Telecom Management Methodology 75% to 90% UID_ 35053 Advanced Alarming on Itf-N Completed UID_ 35056 CN CS Bearer Transport Network relative NRM Completed UID_ 370002 End point modelling for reference point Completed UID_ 390016 Alignment with eTOM and M.3060 15% to 100% UID_400030 SOAP Solution Sets 10% to 40% UID_340065 BB Performance Management 8 UID_ 390012 IP bearer network PM definitions Completed UID_ 360001 HSUPA performance measurements 80% to 100% UID_ 360002 KPIs for UMTS/GERAN 70% to 95% (SP-080793 TS 32.410 for information) UID_340066 BB Trace Management 8 (to host the CT1 work item) UID_11067 Service Level Tracing in IMS SP-080690 3GPP SA5 Report to Meeting #42
Release 8 Charging Management UID_370059 IMS Multimedia Telephony and Supplementary Services (IMSTSS) • SA5 BB UID_380042 Advice of Charge (AoC) support in IMS Charging- new TS 32.280, CR 32.240/260/296/298/299 35% to 55% (SP-080709 TS 32.280 for information) • BB UID_370062 IMS Multimedia Telephony Service SA5 WT UID_380041 MMTel and Supplementary Services Charging (MMTel-CH) - new TS 32.275, CR 32.298/299 40% to 75% UID_350016 Charging Management small Enhancements (CH8) • UID_380046 WLAN Offline Charging stopped SP-080690 3GPP SA5 Report to Meeting #42
Exceptions for Rel-8 • SP-080691 Exception sheet for TM methodology • SP-080692 Exception sheet for MMTel offline charging • SP-080693 Exception sheet for EPC charging • SP-080694 Exception sheet for Advice of Charge • SP-080695 Exception for WID on E-UTRAN NRM • SP-080696 Exception sheet of 32.410 Key Performance Indicators (KPI) for UMTS and GSM • SP-080697 Exception for SOAP SS • SP-080698 Exception for Trace for UTRAN and EPC • SP-080699 WI Exception sheet for E-UTRAN performance measurements • SP-080700 Exception sheet for KPI for E-UTRAN • SP-080701 WI_Exception for EPC measurements • SP-080750 Exception sheet for EPC Network Resource Model (NRM) Integration Reference Point (IRP) • SP-080xxx Exception for 3G Home NodeB OAM&P (type 1 definition) SP-080690 3GPP SA5 Report to Meeting #42
SA5 Meetings 2008 SP-080690 3GPP SA5 Report to Meeting #42
SA5 Meetings 2009 SP-080690 3GPP SA5 Report to Meeting #42
SA5 input to this SA meeting 1/2 SP-080690 3GPP SA5 Report to Meeting #42
SA5 input to this SA meeting 2/2 SP-080690 3GPP SA5 Report to Meeting #42