An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHCb DC2004 in Russia Ivan Korolko (ITEP Moscow) Russia-CERN JWGC, September 2004

  2. LHCb DC2004 aims Physics Goals: 1. HLT studies 2. S/B studies, consolidate background estimates, background properties Requires quantitative increase in number of events: 1. 30x106 signal events (~80 channels) 2. 15x106 specific background events 3. 125x106 generic background events (Binclusive+MB)

  3. LHCb DC2004 aims Gather information for the LHCb computing TDR ● Robustness test of the LHCb software and production system ● Test of the LHCb distributed computing model including distributed analysis ● Incorporation of the LCG application software into the LHCb production system ● Use of LCG resources as a substantial fraction of the production capacity

  4. LHCb DC2004 schedule 3 phases: • MC Production • Stripping (event preselection) • Analysis May – middle of September Starting soon In preparation

  5. Russian participants All 4 centers were involved: • JINR 28 PIII-933 MHz • IHEP 32 PIII-933 MHz + 32 PIV-2.8GHz • ITEP 64 PIV-2.4GHz • SINP-MSU 20 PIII-933 MHz Many thanks to V.Romanovsky (IHEP) and V.Mitsyn (JINR)

  6. Phase 1 Completed 186 M Produced Events Phase 1 Completed 3-5 106/day LCG restarted LCG paused LCG in action 1.8 106/day DIRAC alone

  7. The Phase 1 Statistics 20 DIRAC Sites 43 LCG Sites

  8. The Phase 1 Statistics 424 CPU · Years

  9. The Phase 1 Statistics

  10. Next phases • 2 TB of produced MC samples (DST files) are stored in Russia (ITEP). We plan to participate in stripping procedure. • Analysis phase is certainly most interesting. does not require “huge” resources

  11. Summary • Russian centers have produced 4.85% (9M events) using more than 60% of all available resources • Several “weak” places: disk capacity (even for LHCb!) network connectivity (many retries) • We certainly need more resources in 2005 increase CPU power increase mass storage Accurate planning is important