180 likes | 418 Views
Ohio Department of Transportation. Current / Future Direction of ITS Programs. Marian Thompson Freeway Operations Engineer September 20, 2005. Overview. Incident Management versus Recurring Congestion ITS/FMS Playbook Diesel Spill cleanup Hazardous Materials Contracts
E N D
Ohio Department of Transportation Current / Future Direction of ITS Programs Marian Thompson Freeway Operations Engineer September 20, 2005
Overview • Incident Management versus Recurring Congestion • ITS/FMS • Playbook • Diesel Spill cleanup • Hazardous Materials Contracts • Freeway Service Patrols • Quick Clear • Quality Assurance • ITS in ODOT’s organization • Performance measurement
Freeway Operations • ITS • Incident Management or Freeway Operations • FMS with District operated TMC
Freeway Management Systems • ARTIMIS • Columbus • Phase 1 • Phase 2 • Cleveland FMS • Akron FMS • Dayton Early Deployment • Future • Toledo FMS • ARTIMIS and Columbus upgrades
ARTIMIS • Equipment Maintenance • Software and Systems Administration • Operations
Columbus FMS • “Phase I” operational • Full build out is now under construction • Miller Cable is prime contractor • Maintenance issues • Operations issues
Cleveland Freeway Management System • Design underway • DMJM+Harris is designer • Software/ systems integration • Expect to sell in Spring 2007
Incident Management • ITS • Playbook • Freeway Operations Manual • Diesel Spill Cleanup • Haz Mat Contracts • Urban Freeway Service Patrols • Akron • Cincinnati • Cleveland • Columbus • Dayton • Toledo
Playbook • Pre-defined freeway detour routes and response procedures • Applies to interstates and “lookalikes” • Promotes cooperation between ODOT and local public safety agencies • Promotes review of overly long freeway closures • Playbook Trailer concept • District visits • OTIS • Web-based versus Paper
Freeway Operations Manual • Under Development • Incorporates/references the Playbook • Provides IM Guidelines • Quick Clear • Diesel Spill Response • Hazardous Materials Contracts • Incident Management and Response Reviews • Cooperation with other entities
Freeway System Performance • Permitted Lane Closure criteria applied to Freeways and “Lookalikes” on ODOT Office of Traffic Engineering Webpage • Number, location, and duration of closures • Full and Partial Closure Evaluation • Log of DMS messages • Corridor reports (if instrumented): days in month that peak travel time exceeded two times the average • New and expanded Ramp Metering
ITS Maintenance • Preventive maintenance program for ITS equipment • Equipment up-time goals • Detector Stations • CCTV • HAR • DMS • System up-time Goals
Summary • Preventive maintenance program for ITS equipment • Equipment and System goals • Evaluation of incident response • Cooperation with other entities • Freeway Operations Manual
Current / Future Direction of ITS Programs Ohio Department of Transportation Marian Thompson Freeway Operations Engineer marian.thompson@dot.state.oh.us 614-466-2168