E N D
6. Should these be letters?Should these be letters?
9. The diagram shows how the cost estimate information can be used to determine a planning level estimate of the landscape and aesthetics costs for this hypothetical five mile section of highway corridor. The costs shown are for landscape and aesthetic enhancements that are above the ordinary project construction costs. The diagram shows how the cost estimate information can be used to determine a planning level estimate of the landscape and aesthetics costs for this hypothetical five mile section of highway corridor. The costs shown are for landscape and aesthetic enhancements that are above the ordinary project construction costs.